Search Documents

  • SME
    World?s Largest TBM Keeps Niagara Project On Track

    By Doug Harding

    The Niagara Tunnel Project (NTP) is a 10.4-km- (6.5- mile-) long, 14.4-m (47.5-ft) bored tunnel that will run under the city of Niagara Falls from the Upper Niagara River to the Sir Adam Beck power st

    Jan 1, 2008

  • SAIMM
    Rapid Installation Of Support In A Partially Raise Bored Shaft Using Sky Jacks. ? Synopsis (80e0c6d7-bb8a-4f50-8633-f573ee75745a)

    By D. Strachan

    Installation of support in known poor ground intersections during reaming operations requires rapid access to stabilize the shaft wall and thus to prevent the loss of the shaft through scaling. This i

    Jan 1, 2009

  • IIMP
    Competencia en la venta de hierro en el mercado mundial

    By Charles W. Robinson

    Si bien, durante un breve periodo la industria internacional del hierro ha experimentado diversos problemas dado el exceso de oferta en relación con la demanda. En este sentido, el objetivo del texto

    Nov 20, 1969

  • AUSIMM
    Optmization of Copper Electrowinning at High Current Densities

    A detailed study of the capital investment and production cost for copper electrowinning plants shows that significant savings in both can be achieved by increasing the current density. From the econo

    Jan 1, 1972

  • SME
    Rock Fall Control In Surface Mining With Cable & Ring Net Fences

    By C. O. Brawner, J. Kalejta II

    The classical approach to control rock fall and ravel in open pit mining has been to use catch benches. The width and volume of benches is most dependent on the bench height, size of loading equipmen

    Jan 1, 2002

  • AUSIMM
    The Occurence of Bismuth in the Lachlan Fold Belt in New South Wales

    Although bismuth mineralization is spread widely through the Lachlan Fold Belt in New South Wales, broad grouping of the various deposits can be effected on the basis of geographical and geological (a

    Jan 1, 1973

  • CIM
    A Simple Estimation Method of Materials Handling Specific Energy Consumption in HPGR Circuits

    By A. G. Doll

    "Multi-stage crushing plants, including high pressure grinding roll (HPGR) circuits, require more materials handling equipment than SAG and ball mill circuits. A temptation exists to neglect the energ

    Jan 1, 2015

  • IIMP
    Nueva línea de producción de clinker grupo Gloria - Yura S. A.

    By Juan Carlos Lozada

    YURA S.A. es una empresa industrial cuyo principal actividad es la fabricación y comercialización de Cementos Portland y adicionados, conglomerados de albañilería y concretos. Asimismo proyecta la con

    Sep 12, 2011

  • AUSIMM
    Gold Occurrences at Bendigo

    IN previous discussions on the occurrence of gold in the Bendigo quartz reefs the opinion has been put forward that the gold shoots are primary concentrations in the quartz reefs during the period of

    Jan 1, 1922

  • AUSIMM
    Conceptual Exploration for Tin, Gold and Diamond Placer Deposits in ‘Sundaland’ (Indonesia and Malaysia) by Understanding the Late Cainozoic Stratigraphic Context

    By D A-F Batchelor

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation.South-East Asia represents the world’s most productive tin province, mainly from placers. Ka

    Mar 18, 2015

  • SME
    Svedala Barmac “High Intensity” Crushing

    By P. J. Cook

    Comminution is one of the fundamentals of mineral processing, requiring large expenditures to be made on capital equipment, installation, power and maintenance. The trend toward lower grades and h

    Jan 1, 1999

  • DFI
    Suction Piles And Suction Anchors For Offshore Structures

    By S. Bang

    In recent years, suction piles and suction anchors have been used as underwater foundations for various offshore structures. They have been proven very versatile, effective, and environmentally frien

    Jan 1, 2009

  • AUSIMM
    Cost/Performance Evaluation of Gold Placer Mining Methods - For a Range of Gold Placer Deposits in the Bodaibo District, Russia

    The profitability of gold placer mining operations is determined by more factors than many placer miners recognise until too late. This study is based upon field trips to examine the efficiency of min

    Jan 1, 2007

  • ISEE
    Quantifying Your Blast Fragmentation Using Split-Desktop

    By Kirstin Girdner, Tom BoBo, Brian Norton, John Kemeny

    Split Engineering is a truly customer oriented company dedicated to providing quantified fragmentation information of the highest integrity to enable process management and control. Technical decision

    Jan 1, 2000

  • AUSIMM
    Pressure Leaching of a Manganese Ore Part II: Leaching Aspects

    By Woodcock J. T

    When an aqueous suspension of pyrite and a manganese ore reacts with oxygen, manganese is dissolved by the ferrous sulphate and sulphuric acid produced in situ by oxidation of pyrite. In the absence o

    Jan 1, 1958

  • AUSIMM
    Contaminated Water Management for the Golden Cross Mine

    By M J. Kindley

    The Golden Cross Gold Mine Project is now fully operational and into its second year of operation. Because of its location in the sensitive Coromandel Peninsula

    Jan 1, 1993

  • ISEE
    New Innovations in Drilling and Bit Technology, "Integrated Sectional Drill Steel System"

    By Steve Collinsworth, Nils Heinke

    In 1989, I realized the definite need for change in the Blast Hole Drilling Industry. With over 25 years of experience in dealing with the industry, I am well inGormed and educated concerning the prob

    Jan 1, 1997

  • IIMP
    El impacto del código internacional para el manejo de cianuro en la industria peruana

    By Carlo Vargas Bolívar

    Dado que en el 2003, se publicó la primera serie de estándares para la aplicación y certificación del Código Internacional para manejo del cianuro, se incrementó el número de compañías qe buscan certi

    Sep 1, 2014

  • CIM
    Design techniques for sublevel caving layouts

    By D. A. Trotter, G. J. Goddard

    "This paper describes a method of deciding on various design parameters for a sublevel caving layout. Layout design curves are obtained from the output of a computer optimization program. The program

    Jan 1, 1981

  • IIMP
    Expansión de producción de Condestable con innovaciones tecnológicas en clasificación de molienda

    By Roberto Chambi

    "El presente trabajo señala la expansión de la producción de la mina Condestable a través de las innovaciones tecnológicas en clasificación de molienda como: la utilización de estas zarandas derrick d

    Sep 9, 2007