Search Documents

  • SME
    Cable Shovel Dynamic Modeling For Determining Component Cycle Stress - Preprint 09-121

    This paper presents a virtual prototype for the stress analysis of cable shovel components based on combination of flexible and rigid body approach. The general mechanical system of the cable shovel i

    Jan 1, 2009

  • AUSIMM
    Flotation of Ok Tedi Sulphide Minerals

    By Mwaba CC

    Ok Tedi Mining Ltd has been using flotation for the production of copper/gold concentrates from a complex copper sulphide ore for several years. During this period, much effort has been devoted to

    Jan 1, 1991

  • AUSIMM
    The Continuous Miner and its Application to Pillar Extraction

    By Monger N. R

    Factors leading to the decision to use Joy Continuous Miners for pillar extraction in the Burwood Colliery are outlined. A detailed description is given of the Joy 1-CM-2 Continuous Miner, including t

    Jan 1, 1957

  • IIMP
    Aplicación del Sistema MIMS a Estadísticas de Producción en la Planta de Cerro Verde

    By José Arango

    El presente texto describe la aplicación del sistema MIMS en las estadísticas de producción de la Sociedad Minera Cerro Verde S.A. El sistema fue instalado inicialmente para el control de mantenimient

    May 25, 1998

  • SAIMM
    Critique of the South African Squat Coal Pillar Strength Formula

    By J. N. Van der Merwe, M. Mathey

    "The South African squat coal pillar strength formula, developed by researchers from the Chamber of Mines Research Organization in the 1980s, predicts an exponential increase in coal pillar strength o

    Jan 1, 2016

  • AUSIMM
    Re-development of the Big Bell Mine, Cue

    The area around Big Bell was actively explored and sporadically mined for gold from 1904 onwards. The lease was named Big Bell in 1913. The property became established as a major mining centre with

    Jan 1, 1989

  • NIOSH
    RI 9438 - Effectiveness of Iron-Based Fuel Additives for Diesel Soot Control

    By H. William Zeller, T. E. Westpha1

    The U.S. Bureau of Mimes evaluated the effects of two iron-based fuel additives on diesel particulate matter (DPM) emissions. The 5.6-L, six-cylinder test engine is typical of engines used in undergro

    Jan 1, 1992

  • SAIMM
    Recovery of gold from the Mouteh Gold Mine tailings dam - Synopsis

    It is estimated that the tailings dam of the Mouteh Gold Mine, in Iran, contains more than 770 kg of gold. Microscopic analysis reveals that sulphide minerals and active carbon are the main sources of

    Jan 1, 2009

  • ISEE
    Signature Hole Analysis and Vibration Modeling: An Indonesian Case Study

    By Wawa Jaka Sungkawa, Slamet Rachman Jaka, Tom Dermody

    Nowadays, with such a focus on environmental protection, surface mining activities have come under pressure to ensure their activities do not adversely affect the local surroundings. As part of the ex

  • AUSIMM
    Removal of As(III) and As(V) in Aqueous Solution

    Removal of As(III) and As(V) in Aqueous Solution There are toxic arsenical species such as As(III) and As(V), and arsenious species have specially strong toxicity. The strong toxicity causes contamin

    Sep 13, 2010

  • AUSIMM
    Independent Review of the VALMIN Code

    The paper outlines the history and current status of the VALMIN Code and sets out the background, methodology, results and recommendations of the Independent Review of the VALMIN Code undertaken durin

    Jan 1, 2002

  • AUSIMM
    Flint Clays of the Merrygoen-Digilah Area

    The area between Merrygoen and Digilah is located on a structural high that separates the Sydney Basin from the Great Artesian Basin, and hence the stratigraphic succession of younger rocks overlying

    Jan 1, 1973

  • AIME
    Groveland Plant Features Huge Pelletizing Machine

    The pellet plant, built by Dravo Corp, in Groveland, Mich., for the Hanna Mining Co., is now in full operation. Although using jasper, a type of iron ore with low iron content (approximately 28% Fe),

    Jan 4, 1964

  • AUSIMM
    Experimental Study of Ore Characterisation Methods for AG/SAG Mills

    Experimental Study of Ore Characterisation Methods for AG/SAG Mills Mining companies have long recognised the importance of ore breakage characterisation in design and optimisation of their crushing

    Sep 13, 2010

  • AUSIMM
    Fast Adsorption Phenomena at Air/Liquid Interfaces

    Fast Adsorption Phenomena at Air/Liquid Interfaces

    Sep 13, 2010

  • CIM
    Application of advanced blasting technologies for large scale de-stress blasts at Brunswick mine

    By S. Chung

    Mining in highly stressed ground conditions has been an increasing challenge at the Brunswick mine. Over the past 30 years, two large regional pillars were established on the 1000 m Level to support t

    Jan 1, 2005

  • CIM
    Robust image segmentation technique for rock fragmentation analysis

    By G. K. Mann

    Fragmentation analysis of blast or crushed rock material is a time-consuming and costly process. During the last two decades, the mining industry has been investigating image-based analysis systems as

    Jan 1, 2006

  • SAIMM
    A Mining Perspective on the Potential of Renewable Electricity Sources For Operations in South Africa Part I—The Research Approach and Internal Evaluation Process

    By R. G. Votteler, A. C. Brent

    "The business performance of mining corporations in South Africa is adversely affected by the constantly increasing electricity costs. The most commonly used power sources are the national utility sup

    Jan 1, 2017

  • SME-ICGCM
    Design and Performance of a Longwall Coal Mine Water-Barrier Pillar

    By Francis Kendorski

    The Skyline #3 Mine of Canyon Fuel Company in Utah was planning longwall mine development adjacent to and downdip of older mine workings known to be flooded. Barrier pillar geometries and widths were

    Jan 1, 2007

  • AUSIMM
    Integrated Mine Evaluation ù Implications for Mine Management

    By M Armstrong, S J. Coward, A Galli

    Mine management is often expected to make rapid evaluation decisions at different stages of projects based on limited and uncertain data. The challenge is exacerbated by having to distil technical com

    Jan 1, 2006