Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Development of in-situ stress measurement technique using ultrasonic wave attenuation method - A progress reportBy Y. L. Sun
The feasibility of using the ultrasonic wave attenuation method for measuring in-situ stress is examined theoretically and experimentally. The theoretical analyses show that for a given rock type the
Jan 1, 1989
-
Impact Of Vertical Stress On Roadway Conditions At Dartbrook MineBy Ken Mills
A program of stress change and roadway deformation monitoring was undertaken to measure the forward abutment load distribution about a retreating longwall panel at Dartbrook Mine. The results of this
Jan 1, 2000
-
Rock Mechanics And Ground Control For Underground Mining And ConstructionRecent improvements are described in several techniques for ground control in underground mining. Promising methods for analysis and mitigation of rockbursts are discussed. Methods of assessing damage
Jan 1, 1989
-
Surface damage due to longwall mining - A case studyBy P. M. Lin
A subsidence monitoring program over a longwall panel was established (1) to explore the impacts of dynamic subsidence on the ground surface and structures and (2) to correlate the movements between t
Jan 1, 1989
-
A Simple Tool to Measure Stress in Mine BackfillBy A. MacG. Robertson
A cone penetrometer has been used to assess the level of stress existing in hydraulically placed mine backill. The test apparatus was fabricated at the mine and consisted of a steel cone, connector ro
Jan 1, 1986
-
Estimation of in-situ material strengthBy Danell. R. E.
A drill monitoring system has been developed which measures performance characteristics of a rotary drill and relates this to the material strength and rotary specific energy. The drill monitor is com
Jan 1, 1989
-
Catastrophic Collapse Of Highwall Web Pillars And Preventative Design MeasuresBy Karl Zipf
In highwall mining, once a sufficient number of web pillars are developed, they can fail catastrophically in a domino-type failure, posing a safety hazard to highwall miners and sterilizing mineable r
Jan 1, 1999
-
The Estimation of Ground Control Risk By Real?Time Quantitative Visual AssessmentsBy Alexander Garcia
Roof and rib falls are the basic ground control hazards associated with underground roadways during development, stand up and, if applicable, retreat. Falls of ground can happen following the deterior
Jan 1, 2012
-
Premining Stability Analysis Of A Shaft Pillar At The Homestake MineBy J. C. Johnson
High-grade ore found in a shaft pillar at the Homestake Mine prompted a request for a Bureau of Mines study to determine if selected areas of the shaft pillar could be mined without jeopardizing the s
Jan 1, 1989
-
Continuous Improvement In Cuttable Coal Rib Support In Australian Coal MinesBy Ghassan Skybey
Australian coal mines uses state of the art technology in coal rib reinforcement. This paper highlights the development over the past 15 years in coal rib support technology, along with the advantages
Jan 1, 1995
-
Relationship between Mining Subsidence and Mining Depth in Strip Pillar MiningBy Wenbing Guo
Strip pillar mining method is one of the most important techniques for mining subsidence control in China. Mining depth is one of the most important factors that affect subsidence in strip pillar mi
Jan 1, 2007
-
Development and Field Tests of Look-Ahead Radar and Horizon Sensing for Coal Cutting DrumsBy Gerald L. Stolarczyk
Safe and efficient coal extraction requires advanced radar subsystems that can be mounted on cutting drums of coal cutting machines. A look-ahead radar (LAR) must solve the radio geophysics problem o
Jan 1, 2006
-
Design Of Multi-Level Thick Seam Extractions Under Major Aquifers And Considering Spontaneous Combustion RiskBy D. J. Reddish
An understanding of the mechanisms that cause large seismic events in a deep mine provides a foundation for designing effective measures to reduce the incidence of these events, as well as reduce the
Jan 1, 1996
-
Destressing Practice In Rockburst-Prone GroundBy J. Willan
This paper addresses the problem of designing a destress blasting procedure to reduce the incidence of rockbursting in hard rock mines. A review is made of the developed theory and practice of destres
Jan 1, 1984
-
Deformation and failure-time prediction in rock mechanicsBy Barry Voight
The law [ ] where [ ] is a measurable quantity such as strain and A and cu are empirical constants, describes the behavior of materials in terminal stages of failure under conditions of approximately
Jan 1, 1989
-
Two Case Studies Of The Performance Of Rib SupportsBy M. K. Larson
The U.S. Bureau of Mines conducted a study to evaluate support interaction between conventional bolts and the rib at two Western coal mines. The principal goal was to develop guidelines for designing
Jan 1, 1996
-
In-Situ Performance Analysis Of Immediate Forward Support (IFS) Systems In Thin-Medium Seam Sections In The United KingdomBy Paul N. Freeman
This paper describes the in-situ performance of two IFS powered support installations at Betws and Penallta Collieries in the South Wales Coalfield, United Kingdom. Intensive monitoring of all powe
Jan 1, 1992
-
Study about the Dynamic Influences of Longwall Mining in the US on Surface StructuresBy Karsten Zimmermann
The paper presents a study on the influence of face retreat rate in longwall coal mining on surface subsidence. It shows possibilities to influence dynamic ground movement by using a specific and con
Jan 1, 2007
-
Roof Stability Issues in Underground Limestone Mines in the United States (c7025d3b-53e9-40eb-abd5-d6a28b7f51f3)By Gabriel Esterhuizen
The room-and-pillar mining method is used extensively in underground limestone mines in the Eastern and Midwestern U.S. The rock mass is typically a near-horizontal, bedded deposit at relatively shal
Jan 1, 2007
-
The Use of Strata Management Techniques for the Optimisation of Secondary Support in Longwall Installation Roadways at United Colliery, NSW, AustraliaBy Kieran Black
The immediate roof lithology at United Colliery is extremely variable and provides a challenge for the design of secondary support. Support design in recent longwall installation roads at the mine has
Jan 1, 2007