Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    A Method For Estimating Western Coal Strengths From Point Load Tests On Irregular Lumps

    By K. Y. Haramy

    This report describes the development of an equation for predicting the crushing strength of 2-inch (5.08-cm) cubes of coal from point load tests made on irregular lumps. The equation was developed fr

    Jan 1, 1982

  • SME-ICGCM
    Geological Conditions At Continuous Miner Sections; Examples From Marrowbone Development Company, Mingo County, West Virginia

    By J. Marc Coolen

    Marrowbone Development Company operates a large drift mining complex in the central Appalachian coal field. In 1997, five continuous miner supersections produced close to 9 million tons of raw plant f

    Jan 1, 1999

  • SME-ICGCM
    Advancements In Reflective Seismic Tomography For The Location Of Old Works And Characterization Of Structural Anomalies Impacting Underground Developments

    By David R. Hanson

    Seismic tomographic imaging, based on the same principles as a medical CAT Scan (Computer-Aided-Tomography). has been used for many years in the oil industry for large-scale subsurface stratigraphic c

    Jan 1, 2000

  • SME-ICGCM
    Panel?scale Modeling of a Deep Longwall Panel: the MULSIM Alternative

    By Mark K. Larson

    Panel-scale modeling of stress changes induced by longwall coal mining is a challenging problem, particularly in deep mines of the western United States. Two common approaches to this problem are the

    Jan 1, 2013

  • SME-ICGCM
    Modern Shield Technology: Better Than Ever But Still Not Perfect

    By Thomas M. Barczak

    A survey of the longwall industry was conducted to examine the performance of modern shield technology. The results of this survey indicate that state-of-the-art shields perform better and last longer

    Jan 1, 1999

  • SME-ICGCM
    Investigation of Pillar Loading Considerations in Determination of Pillar Stability Factors for Longwall Gateroad Design

    By Heather E. Lawson

    Recent field data providing measured pillar loading from a deep western mine revealed that an increased load transfer distance existed compared to expected values (Larson et al., 2012). Additionally,

    Jan 1, 2013

  • SME-ICGCM
    Longwall Roof Fall Prediction and Shield Support Recommendations

    By Ulrich Langosch

    In the 1990s the German mining industry introduced a new generation of shield supports. The new design of support has a maximum load capacity of 10,000 kN, making these units as strong as the shields

    Jan 1, 2003

  • SME-ICGCM
    Development of the 3D Numerical Modeling of Roof Bolts for Studying the Bolt/Rock Interaction

    By WenFeng Li

    A 3D roof bolt model with the consideration of rebar, resin, bearing plate, and resin/rock interface was developed for studying the bolt/rock interactions of the tensioned and fully-grouted resin bolt

    Jan 1, 2014

  • SME-ICGCM
    Study on Appropriate Support System and Control Criteria for Main Roadway under Weak Geological Conditions in Indonesia

    By Takashi Sasaoka, Hiroshi Takamoto, Akihiro Hamanaka, Pongpanya Phnthoudeth, Hideki Shimada, Jiro Oya

    "Indonesia is the second largest coal exporter to Japan, accounting for about 30 Mt annually. They produced over 400 Mt in 2015, over 99% of which is from open-cut mines. However, the conditions of su

    Jan 1, 2017

  • SME-ICGCM
    A Comparison of the Overburden Loading in ARMPS and LaModel

    By Ihsan Berk Tulu, Keith A. Heasley, Chris Mark

    "The Analysis of Retreat l\.fining Pillar Stability (ARJ\1PS) and the Lal\.fodel programs have been used successfully in the U.S. for designing safe pillar recovery operations for many years. However,

    Jan 1, 2010

  • SME-ICGCM
    Development, Trials, and Testing of a Two-Component, Rapid-Set Cement Grouting System

    By Stephen C. Tadolini, Robert Hawker, Peter Mills, Colin Grubb, Tom Meikle

    "In unfavorable strata conditions, it is often necessary to install additional long tendon support as part of a primary support cycle. Although these support systems provide the required additional st

    Jan 1, 2017

  • SME-ICGCM
    Determination Of Classification Parameters For Clay - Bearing And Stratified Rock Mass

    By Erdal Unal

    In underground mining today, safety and economical aspects demand a better understanding of the rock-mass conditions, particularly for design of underground mine openings excavated in weak and stratif

    Jan 1, 1990

  • SME-ICGCM
    Barrier Pillar Design for Safe and Productive Longwall Mining

    By Stephen C. Tadolini

    Effective barrier pillar design is an essential component for safe and productive underground coal mining. Barrier pillar design methodologies that incorporate sound engineering judgment have been use

    Jan 1, 2013

  • SME-ICGCM
    A Case Study of Topography?Related Stress Rotation Effects on Multi?seam Stability

    By Ihsan Berk Tulu

    The complex interaction between multiple seam pillar extraction panels and variable topography can generate unexpected ground control problems. This case study describes stress-related damage in multi

    Jan 1, 2014

  • SME-ICGCM
    Analysis of Coal Pillar Stability (ACPS): A New Generation of Pillar Design Software

    By Zach Agioutantis, Christopher Mark

    "Thirty years ago, the Analysis of Longwall Pillar Stability (ALPS) inaugurated a new era in coal pillar design. ALPS was the first empirical pillar design technique to consider the abutment loads tha

    Jan 1, 2018

  • SME-ICGCM
    Test Method for Assessing Water Degradation Potential of Coal Measure Rocks for Analyses of Floor, Roof, and Ribs

    By G. J. Hasenfus

    There are no known published methods of estimating the degradation of coal measure rocks by water that are simple and efficient, yet still provide a quantitative, meaningful value for assessing the st

    Jan 1, 2005

  • SME-ICGCM
    Quantification of Ventilation Enhancement Using the Eye Can Roof Support

    By Mark F. Sindelar, Yi Luo, Hua Jiang, Michael T. Shook

    "Convergence of roof and floor in underground mine openings is a common occurrence. This convergence not only adversely affects the ability of workers, equipment and supplies to travel through the min

    Jan 1, 2016

  • SME-ICGCM
    Research on Coal and Gas Outburst Dynamic System

    By Chaojun Fan, Du Wenzhang, Sheng Li, Hong-Hong Shi

    "Coal and gas outburst is an extremely complex dynamic disaster in coal mine production process which will damage casualties, equipment facilities and disorder the ventilation system by suddenly eject

    Jan 1, 2016

  • SME-ICGCM
    Load Transfer Distance Measurements at Two Mines in the Western U.S.

    By Mark K. Larson, Douglas R. Tesarik, Heather E. Lawson

    "Load transfer distance (LTD) is simple in concept and usually evident in underground coal mines. Many people in the mining industry recognize LTD as the distance from the panel to where the mine ribs

    Jan 1, 2015

  • SME-ICGCM
    The Prediction of Pillar Interaction Effects for Deep Multi-Seam Workings

    By Lightfoot. Nicholas, Na Liu

    "Mining in multi-seam workings has been undertaken for many years in the VK Remnant pillars above and/or below current working areas have an important influence on retreat gateroad conditions at five

    Jan 1, 2010