Reducing The Fire And Explosion Hazards Of Flame Cutting And Welding In Underground Coal Mines - Preprint 09-007By W. D. Monaghan
Flame cutting and welding is one of the major causes of fires and explosions in underground U.S. coal mines. On May 20, 2006, a flame cutting operation at the Darby Mine No. 1 led to an explosion tha
Jan 1, 2009
-
Methane Explosion Modeling In The Sago Mine - Preprint 09-092By W. McMahon
Following the Sago Mine accident, the Mine Safety and Health Administration (MSHA) asked the U.S. Army Engineer Research and Development Center to study several possible methane explosion scenarios in
Jan 1, 2009
-
Hydrologic evaluation of post-closure flooding and dewatering of the Homestake MineBy Guosheng Zhan
The Homestake Mine included the open cut and underground workings up to 2,484 m (8,150 ft) deep. The mine ceased mining activities in December 2001 after 125 years of operation. Pumping from the under
Jan 4, 2010
-
Electronic Calculators Simplify Slurry ProgramThe speed and internal accuracy of today's electronic calculators can be utilized to write an efficient slurry calculation program. The calculator's input/output printing feature offers addi
Jan 4, 1981
-
Equilibrium Adsorption Studies Of Polysaccharides On Talc: The Effect Of Molecular Weight, Charge, And The Influence Of Metal CationsBy P. Harris, G. Groenmeyer, L. Parolis
The effect of molecular weight, charge and the presence of the cations Ca2+, Mg2+and K+ on the adsorption of carboxymethyl cellulose on pure talc obtained from Balmat, New York have been investigated.
Jan 1, 2004
-
Algorithms for Parametrizing Reserves under Different Geometrical Constraints - IntroductionThe technical parametrization of reserves is a technique which has made an important contribution to the definition and the calculation of optimal mining projects. Its applications to a new open-pit o
Jan 1, 1982
-
T& UC Tunnel DemandTABLE TUNNEL NAME OWNER LOCATION STATE TUNNEL USE LENGTH (FEET) WIDTH (FEET) BID YEAR STATUS Gateway Tunnel project Amtrak Newark NJ Subway 14,600 24.5 2015 Under study
Sep 1, 2013
-
Passive Mine Blast Attenuators Constructed Of Rock Rubble For Protecting Ventilation Seals - Preprint 09-057By M. J. Sapko
The design requirements for mine ventilation seals have undergone a radical transformation in recent years, and these revisions have greatly increased the cost of the seal designs and their constructi
Jan 1, 2009
-
Estimating Technology’s Impact on Underground Coal ProductivityBy Stanley C. Suboleski
1977 was the modern day low point for productivity in the coal industry. At that time, no one could have predicted that the industry was about to enter a productivity rise that would continue unabated
Jan 1, 1990
-
Borehole Mining: Getting More VersatileBy Marcus A. Wiley, Gregory Abramov
Borehole mining (BHM) is a remotely operated method of extracting rock material through boreholes by high-pressure water jets. Figure 1 illustrates a BHM tool and fluids circulation. The tool consist
Jan 1, 2004
-
Numerical Parametric Study of Floor Heave in Gate Roads Caused by Longwall-Induced Abutment LoadingFloor heave events in underground mining often happen suddenly and cause risk to workers and equipment. Reducing the risk of floor heave must be addressed in mining layout design. To improve that desi
Jan 7, 2020
-
Exploratory Shafts For The Nuclear Waste Repository In BasaltBy Birger Schmidt
INTRODUCTION Conceptual design of the first Exploratory Shaft (ES-I) for the Nuclear Waste Repository in Basalt (NWRB) began in July 1981; detailed design began in February 1982, and was largely co
Jan 1, 1987
-
Glenbrook Nickel – Can New Caledonian Ore Save the Only US Nickel Producer?By Kerry Spickelmier
The only nickel smelter and the only active nickel mine in the United States is Glenbrook Nickel Co., a joint venture (50% each) of Cominco Resources International Ltd. and Cominco Ltd. In 1989, with
Jan 1, 1993
-
Actualizing Sustainable Mining: “Whole Mine, Whole Community, Whole Planet” Through ‘Industrial Ecology’ And Community-Based StrategiesBy Ivan Weber
Asking the question, “What do the world’s leading corporations and cutting-edge practitioners of sustainability put forth to guide a given mine site for planning and action toward ‘sustainability’?”,
Jan 1, 2005
-
Closure Concerns at Sonora Mining’s Jamestown MineBy Alan Dahlstrand
The Jamestown Mine is a 6.3-kt/d (7000-stpd) open-pit gold mining operation located in the central portion of California's historic Mother Lode district. Most early production from the Jamestown
Jan 1, 1995
-
Processing researchers continue efforts to streamline US miningBy P. Rosten
US mine production of iron ore in 1984 showed some improvements compared to 1983. But reduced demand from the iron and steel industry caused temporary shutdowns of many iron ore mines and pelletizing
Jan 5, 1985
-
Islais Creek Contract E: Tunneling Through Jet Grouted Bay MudBy D. N. Adams, M. M. Wong, M. J. Robison
Islais Creek Contract E, a transport/storage tunnel in San Francisco, was visited on a fieldtrip during construction by delegates to the 1995 RETC. This paper is a follow-up to that fieldtrip. The p
Jan 1, 1997
-
Comparative Analysis Of Open Pit Mine Scheduling Techniques For Strategic Mine Planning Of The Tintaya Copper Mine In PeruBy D. Bernabe
The mine scheduling process defines a mining sequence across the life of the mine and stipulates the amount of ore, waste, and specific blocks to be mined each year so that the highest economic return
Jan 1, 2002
-
Management of Mineral ResourcesBy Juan P. Camus
Mining is one of the oldest industrial activities. Its products are essential to modern civilization. Paradoxically, and despite a deep-rooted belief to the contrary, mining is not a lucrative indust
Jan 1, 2002
-
CoalBy F. Freme
Coal production in the United States increased in2004 by 36 Mt (39.7 million st) to end the year at 1 Gt(1.11 billion st), according to the U.S. Energy Information Administration (EIA). This was a 3.
Jan 1, 2005