Micro-Price Optimization: An Industrial Case Study for Coal-Fired UtilitiesBy F. Stanley, A. Noble, G. Luttrell
"The supply chain for coal-fired power stations involve a multi-stage network of mining units, preparation plants, blending facilities and transportation systems. Attempts to optimize the supply chain
Jan 1, 2015
-
Remote Control Mining With The Pushbutton Miner ? IntroductionBy Lester G. Rollins
Coal today enjoys a dominant position, serving the energy and metallurgical marketed The measure of success in the market place is, and will continue to be, the price per million BTUs or price per ton
Jan 1, 1966
-
Environmental Impact Assessment Of The Sulfur Mining Activity In Oriental CarpathiansBy D. -P. Georgescu
A native sulfur mineralization associated with pyrite and iron oxides containing 20% iron was quarried in Calimani Mountains, Oriental Carpathians. The wastes resulted from this exploitation activity
Jan 1, 2005
-
Roof Bolting Hazards AnalysisBy J. H. Adkins
The goal of the project reported in this paper was to make recommendations for changes in roof bolting procedures and bolter design that would reduce roof bolter accident rates. To that end the projec
Jan 1, 1978
-
Electrical Fragmentation Of Magnetic Iron Ores ? IntroductionBy Erich Sarapuu
Today's increasing needs for rapid excavation have stimulated efforts to break rocks without explosives. The application of electric energy for this purpose has been studied by a number of invest
Jan 1, 1969
-
Topsoil-Subsoil Requirements To Restore North Dakota Mined Land To Original Productivity (f9bf7e44-59cd-4926-aa63-755a7805e403)By J. F. Power
Returning the original soil material to the surface of smoothed mine spoils is n practical means of restoring agricultural productivity. Research has established that high-sodium spoils in North Dakot
Jan 1, 1978
-
VIMS Telemetry SystemBy C. S. Wageman
Staying competitive in the highly aggressive Powder River Basin is a challenge facing all operators. Any advantage that a mine utilizes to improve productivity and reduce costs could mean the differen
Jan 1, 1996
-
Solving Process Engineering and Flowsheet Design Challenges With Limn®By A. Noble
For the past 30 years, process flowsheet design has been accomplished largely through modeling and simulation. This approach provides circuit designers the freedom to test various separation approache
Feb 23, 2014
-
Production Of Trona Concentrates Using High-Intensity Dry Magnetic Separation Followed By FlotationBy O. Ozdemir
Soda ash, an essential raw material for major industries, such as the glass, chemicals, soap and detergents, pulp and paper, mining and water treatment industries, is traditionally produced by chemica
Jan 1, 2011
-
Assessing dilution, ore loss and profit differences from various hand-drawn dig limits compared to optimal ore-waste delineations in deposits of variable heterogeneityBy Fouad Faraj
For every blast pattern, zones of unique material types need to be classified before mining. Most material types can be summarized into different kinds of ore and waste. Blocks generated from blasthol
Oct 1, 2024
-
Fan Requirements in the Second 100 Years of a Mine LifeBy A. Haghighat
The Missouri University of Science and Technology?s (Missouri S&T) Experimental Mine is a teaching and research facility which has been excavated in limestone by mining engineering students over almos
Feb 23, 2014
-
Factors Influencing Water Discharges From Underground Coal Mine Pools In PennsylvaniaBy A. Iannacchione
Most legacy drift mines entered the coal reserve from outcrop and developed up-dip. The Surface Mining Control and Reclamation Act of 1977 changed this way of mining, requiring all new mines with acid
Feb 23, 2014
-
Not Another HPGR Trade-Off Study!By P. Amelunxen
Over the past several years, the combination of higher energy and steel costs and the recent commercial deployment of high-pressure grinding rolls (HPGR) technology in hard rock mining have led many m
Jan 1, 2011
-
Lab Evaluation Of A New Type Of Air-cleaning Fan For Respirable Dust Control - SME Annual Meeting 2023By S. S. Klima, H. Jiang, T. W. Beck, Y. Zheng
Researchers at the National Institute for Occupational Safety and Health (NIOSH) performed a series of lab tests to evaluate the respirable dust removal capacity of an industrial air-cleaning fan. Lim
Feb 1, 2023
-
Semi Autogenous-Ball Mill-Crushing Circuit (SABC) At INCO'S Clarabelle MillBy T. McDonald
Test work indicated and plant operation has since confirmed that SAG milling is a viable option for INCO's Sudbury Operation milling rationalization project only if pebble crushing is included in
Jan 1, 1992
-
Construction of the N20 To N25 Tunnel (basic) Segment of the Superconducting Supercollider Project]By Joseph A. Whitchurch
The N20 to N25 Tunnel (basic) segment was the second tunnel contract awarded for construction by The PB/MK Team. This project embodied 3.9 km (2.4 miles) of tunnel and was located within the northwest
Jan 1, 1995
-
Sodium Bentonite From Western Nevada (77a1b110-00de-42ff-9619-af0b7766c588)By J. L. Post
A large body of readily available Na-montmorillonite is present about 24km (15 miles) east of Fallon, Nevada. The clay is comparable to Wyoming Na-bentonite, but with somewhat less MgO and somewhat mo
Jan 1, 1996
-
Recovering Fine-Size Coal From Alabama Washer Wastes Using Humphreys SpiralBy James S. Browning
In 1975 bituminous coal and lignite production in the United States reached an all-time high of 637 million tons, an increase of 6 percent over production in 1974. The output, valued at $11.9 billion
Jan 1, 1977
-
Computer Control in Flotation Plants (Chapter 33 )By E. Woodburn, H. W. Smith, M. C. Fuerstenau, R. Putman
This paper presents a review of developments to date in computer control practice, based in large part on Canadian experience. The basic problem examined is that of stabilizing control; matters consid
Jan 1, 1976
-
Preparing the section foreman for his full responsibilitiesBy R. L. Grayson, R. C. Althouse, M. J. Klishis
The health and safety of employees, efficiency of the operating system, and production are paramount goals in underground coal mining. The section foreman assumes responsibility for making his part of
Jan 1, 1987