New Dragline Bucket Improves Stripping EfficiencyBy Dean Bray
During the past three years, a new rear-dumping dragline bucket technology has been patented, developed and tested at North Dakota coal mines. Field testing has shown that this new concept in draglin
Jan 1, 1999
-
The Interaction Of Tunnel Ventilation Systems And Cross Passageway Ways - Preprint 09-055By M. J. Gilbey
Cross passageways between adjacent tunnels in passenger rail or transit systems may be used during train fire emergencies to evacuate passengers to points of safety in the non-incident tunnel. Rescue
Jan 1, 2009
-
Exploratory Fea & Conceptual Design Findings Of Large Diameter Segmentally Lined ShaftBy D. Kruse
Top down constructed large diameter (up to 90 m [300 ft]) shaft design and constructability issues present an interesting suite of challenges and opportunities highlighted in this paper. The study cov
Jan 1, 2011
-
Big Truck and Big Tire – Caterpillar and MichelinBy Tim O’Neil
If you build a big truck, build a big tire to match it. Let that haulage synergy aid the economics, productivity and lessened maintenance for the unit. Now, Cater-pillar and Michelin have done just
Jan 1, 2002
-
Pebble Project Moves Forward After Election VictoryIn Alaska?s southwest corner, in the Bristol Bay region, 476 holes have been drilled to help define the size of the Pebble Project. The results indicate that the deposit holds close to 32 Mt (72 billi
Jan 1, 2009
-
Paragenesis And Metal Associations In Interior Alaska Gold Deposits: An Example From The Fairbanks District (78a5358a-5cda-49ae-b93d-ba8558df1a55)By K. Severin, B. Flanigan, P. Marion
“Plutonic-related” gold deposits in Interior and SW Alaska (Tintina Gold Belt) vary significantly in size, grade, vein/deposit morphology, depth of emplacement, distance from causative pluton and meta
Jan 1, 2000
-
Fine Copper Grinding Using Metso’s Stirred Media DetritorBy Graham Davey
High-speed stirred milling is a relatively new method of grinding in the metalliferous process industries. However, it has been widely used in the industrial mineral field for more than 30 years. Man
Jan 1, 2004
-
Impacts Of Spoil Conditions On Reforestation Of Surface Mined Land (b2bd3f1e-5fbd-441d-ae83-ec597c5ff463)By M. H. Pelkki, R. J. Sweigard, P. W. Conrad, J. M. Ringe, D. H. Graves
Research has shown that excessive soil compaction is detrimental to the establishment of trees in reclaimed soils. Dry bulk density and penetration resistance are two soil parameters that can be used
Jan 1, 2001
-
St. Louis Skinker–McCausland TunnelBy Jozef F. Zurawski
River Des Peres Foul water Interceptor (Skinker–McCausland Tunnel) is a gravity sewer tunnel constructed to eliminate dry sewage overflows during high river stages and to improve the wastewater collec
Jan 1, 2001
-
Application of Column Flotation to Lead and Zinc Beneficiation at ComincoBy M. J. Fairweather, J. R. Egan, W. A. Meekel
Cominco Metals, in cooperation with two Canadian Universities and the Government of Canada, is developing applications for column flotation in the treatment of lead and zinc ores. Plant scale results
Jan 1, 1988
-
Earth Pressure Balance Tunneling In CanadaBy Laura McNally
In 2006, McNally International Inc., in a joint venture partner-ship with Aecon Constructors, was the successful bidder on two York Region Tunnel Projects: the Bathurst Collector/Langstaff Trunk Sewer
Jan 1, 2008
-
Weinbach Soft Ground Tunnel: Lessons LearnedBy Raymond W. Henn, Kent A. Pease, Glen J. Rorison
The paper focuses on construction of a 2.55-km (8,365-ft) long, 2.4-m (8-ft)diameter storm drain tunnel in Evansville, Indiana. The tunnel was driven through saturated soft ground varying from clay to
Jan 1, 2001
-
Coal (Coal production by coal-producing regions, 2001)With the dawning of a new century came the beginning of a new era in the coal industry. Instead of the traditional practice of only buying and selling produced coal in the United States, a coal futur
Jan 1, 2002
-
The Tunneling Research Program Of The Federal Highway AdministrationBy Steven I. Majtenyi
There is a growing interest among transportation planners to make more use of the subsurface to preserve the landscape and make transportation more efficient and economical. At the present time, utili
Jan 1, 1974
-
Development Of A Tool To Predict Performance Of Debladed Main Fans At Henderson MineBy D. Loring, J. Almgren
Climax Molybdenum Company’s Henderson Mine is a large panel caving molybdenum mine located about 43 miles west of Denver, Colorado. Three Joy M120-72-880 fans are installed in parallel on the No. 1 ex
Jan 1, 2007
-
The Impact Of Surface Features Above Underground Mines On Emergency Response - Preprint 09-066By N. T. Lowe
The National Institute for Occupational Safety and Health (NIOSH), Spokane Research Laboratory (SRL), investigated a means to evaluate the potential impact of surface conditions above underground mine
Jan 1, 2009
-
Waterproofing And The New Austrian Tunnel Method (NATM)By A. Kevin Beaton, Robert W. Laakso
The desire for dry passageways promotes the NATM as it provides a final support system most suitable for the installation of a waterproofing membrane. Waterproofing during construction is a cost effec
Jan 1, 1991
-
Knelson-Deswik Mill: Evaluation Of Operating Variables ? IntroductionBy D. Rahal
All ores have an economic optimum particle size (Wills and Napier-Munn, 2006). This optimum value is often a compromise between the need to achieve adequate liberation for the efficient separation and
Jan 1, 2011
-
Innovative NATM Technology for Suburban Tunnelling Metro Section 306, Bochum, GermanyBy Axel Nitschke, Josef Arnold
Bochum’s Underground Lot 306 was characterised by a confined site and unique tunnelling methods. A highly mechanized construction concept was developed to achieve high progress rates. Bespoke backup s
Jan 1, 2005
-
Uranium as nuclear fuel - scarce or sufficient available resource?By C. Slotta, F. Charlier, P. Blomen
"Within the energy concept of the German government, the operating time of nuclear power plants was initially extended from about 8 to 14 years. It is planned, however, that every power plant will gra
Jan 1, 2011