An Optimizing Regulator for the Control of Autogenous Milling CircuitsBy I. M. Macleod
An adaptive steady-state on-line optimizing regulator is proposed as an integrated approach to the control of autogenous run-of-mine milling circuits. This optimizing regulator continuously estimates
Jan 1, 1987
-
Project Valuation, Capital Investment And Strategic Alignment - Tools And Techniques At Anglo PlatinumBy D. C. Andersen, G. L. Smith, A. M. Marsh, J. Pearson-Taylor
Central to the success of any mining company is the ability to manage capital investment effectively so as to ensure acceptable stakeholder returns within an overall strategic context. Critical to thi
Jan 1, 2006
-
The Dual-Electrode DC Arc Furnace-Modelling Brush Arc Conditions ? SynopsisBy Q. G. Reynolds
The dual-electrode DC arc furnace, an alternative design using an anode and cathode electrode instead of a hearth anode, was studied at small scale using computational modelling methods. Particular at
Jan 1, 2012
-
Prevention of chemical contamination of groundwater by mine water - SynopsisBy C. Pamukcu
In this paper, which is aimed to serve as a review article, first of all a breakdown of the earth?s total water reserves is given. The usage areas of water in the mining industry are mentioned and the
Jan 1, 2008
-
Key Production Drivers In In-Pit Crushing And Conveying (IPCC) Studies - 1. IntroductionBy Phil Morriss
During the last 12 months, Sandvik?s Technical Service Group has carried out nine Scoping and Pre-feasibility studies for the application of In-pit crushing and conveying (IPCC) for large mining compa
Jan 1, 2008
-
Performance Evaluation Of A New Stochastic Network Flow Approach To Optimal Open Pit Mine Design?Application At A Gold Mine ? Synopsis (67824a6c-621d-4d66-8f1a-3155e9a184f1)The optimal design of production phases and ultimate pit limit for an open pit mining operation may be generated using conventional or stochastic approaches. Unlike the conventional approach, the stoc
Jan 1, 2012
-
Design Constraints On Trackless Mining Equipment In Low And Extra Low Stope Hard Rock MiningBy S. C. Thorley, J. R. Menasce
Trackless mining in low profile (LP) and extra low profile (XLP) platinum stopes has forced equipment designers to re-evaluate their equipment profiles to match the undulating reef. Low profile equipm
Jan 1, 2004
-
The Role of Computer-aided Sedimentological Synthesis in Strategic Mine Planning at Blyvooruitzicht Gold Mining Company, LimitedBy A. J. Reynolds
In recent years, rapid depletion of the higher grade reserves, allied to decreases in paylimits, has led to the exploitation of secondary, erratically mineralized placer horizons on various marginal a
Jan 1, 1987
-
Comparison between bond crushing energy and fracture energy of rocks in a jaw crusher using numerical simulationBy A. Refahi
For predicting the energy consumption during the size-reduction process, the Bond approach is often used. In this work, the PFC3D discrete element method (DEM) software was employed to model the crush
Jan 1, 2009
-
A Dispersion Model of Autogenous Particle Separations, with Specific Application to the Batch Jigging of ParticlesBy D. A. Vetter
A novel mathematical model is presented which describes the behaviour of beds of particles, of uniform size and shape but different densities, during autogenous separations. The approach used in the
Jan 1, 1987
-
Potential For Bioleaching Copper Sulphide Rougher Concentrates Of Nchanga Mine, Chingola, Zambia ? SynopsisBy J. Manchisi
Laboratory investigations were conducted to establish the feasibility of bioleaching a mixed copper oxide/sulphide rougher concentrate from Nchanga Mine on the Zambian Copperbelt. The objective was to
Jan 1, 2012
-
Replacement Of The Existing Merensky Reef Operations At Lebowa Platinum Mines: An Integrated Business And Operational Readiness ApproachBy O. Y. Ntrama
Lebowa Platinum Mines has been in operation since the late 1960s and is a relatively small producer compared to Anglo Platinum?s other operations. The mine has never had substantial capital investment
Jan 1, 2006
-
A New Mathematical Programming Model For Production Schedule Optimization In Underground Mining OperationsMixed integer programming (MIP) has been used for optimizing production schedules of mines since the 1960s and is recognized a shaving significant potential for optimizing production scheduling proble
Jan 1, 2010
-
Unlocking Rustenburg Base Metals Refiners Sulphur Removal SectionBy M. Pelser, J. Hagemann
"The Anglo American Platinum Rustenburg Base Metals Refiners (RBMR) is the largest producer of nickel cathode in South Africa. It treats slow-cooled matte to recover a platinum group metal-containing
Jan 1, 2016
-
Evaluation Of Processing Options For The Treatment Of Zinc Sulphide Concentrates At Skorpion Zinc - SynopsisBy H. F. Fuls
Skorpion Zinc, an integrated zinc mine and refinery located in the south of Namibia, has a production capacity of 150 000 t/a of special high grade (SHG) zinc. The Skorpion zinc oxide resource will be
Jan 1, 2013
-
A Comparison Of Different Cyclones In Addressing Challenges In The Classification Of The Dual Density UG2 Platinum OreBy A. Mainza
It is common practice in the mineral processing industry to use hydrocyclones for particle classification. However, classification in the UG2 platinum circuits using the hydrocyclone poses major chall
Jan 1, 2004
-
Learning From Nature: The Tornado ProcessBy J. Tikka, E. Bäcklund, N. -O. Lindfors
Tornados are the most violent weather events in the world, and we have all seen the forces and phenomena created by tornados in nature. Airgrinder AB has been working with a material treatment technol
Jan 1, 2007
-
Characterization and recovery of gold associated with fine, activated carbonBy J. Rowe
The attrition of activated carbon, and the loss of gold associated with it, is of significant economic importance to the operation of a CIP/CIL circuit The focus of this study was on activated carbon
Jan 1, 2009
-
Keynote Address: Theoretical, practical and economic difficulties in sampling for trace constituentsMany industries base their decisions on the assaying of tiny analytical sub-samples. The problem is that most of the time several sampling and sub-sampling stages are required before the laboratory pr
Jan 1, 2009
-
Wet Heavy Mineral Pilot Plant Design, Assembly, Commissioning And Operation For A Remote LocationBy P. A. P. Fouché
Processing confidence for a bankable feasibility study on a green field heavy mineral deposit is inmost cases achieved only through bulk sample processing. Bulk sample is classified as a large enough
Jan 1, 2007