Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Selection of an Appropriate Leaching Method for Light Rees from Esfordi Flotation Concentrate Based on Mineral CharacterizationBy D. Moradkhani, S. M. Javad Koleini, M. Abdollahy, F. Soltani
"The objective of the study was to determine the type and distribution of rare earth elements (REEs) in the phosphate flotation concentrate from the Esfordi flotation plant in central Iran, in order t
Jan 1, 2017
-
A statistical approach to some basic mine valuation problems on the Witwatersrand - IntroductionBy D. C. Krige
The estimation of the tonnage and grade of payable ore in a mine and the correct policy of selective mining based on such estimates, is of vital importance to the mining engineer it is surprising, the
Jan 1, 1994
-
Sustainability Of Innovative Management Practices Of Geotechnical Risk At Damang Pit Cut Back (Dpcb) ? A Case Study At Gold Fields Ghana, Damang MineBy E. Dadzie
This paper will review some methods used to manage geotechnical risk at Damang Pit Cutback. The pit depth is designed up to 250m with push back on the eastern and western walls of the existed and depl
Jan 1, 2008
-
Modelling unsaturated dual-phase flow through crushed ores for heap leachingBy J. Petersen, S. W. Robertson
Heap leaching is used extensively for the processing of low-grade copper, gold, and uranium ores. The hydrodynamics is often the most important factor that limits the rate of metal recovery. Over the
Dec 11, 2024
-
Tailings Storage Facility stability monitoring using CPT data analytics on the Zelazny most facility APCOM 2021By P. Stefanek, N. Duda, B. Jachni, P. Stefaniak, B. Bursa
The Zelazny Most Tailings Storage Facility (TSF) is the largest reservoir of post–flotation tailings in Europe. The total amount of tailings from the mines in Lubin, Rudna, and Polkowice are stored ea
Sep 1, 2021
-
The current limited impact of Witwatersrand gold-mine residues on water pollution in the Vaal River systemBy D. D. Marsden
This paper discusses the concentrations of sulphides and total sulphur in widely spread regions around mine residue deposits, from which rain-water run-of can enter the Vaal River system. Analyses of
Jan 1, 1986
-
Monitoring, repair, and safety practices for electric furnace matte tappingBy L. Thomson
"The smelter at Sudbury Integrated Nickel Operations, located in Sudbury, Ontario, operates a single electric AC furnace. This furnace treats nickel sulphide concentrates produced by Glencore and thir
Jan 1, 2014
-
A model of capital expenditure for gold-mine, planningBy J. A. L. Napier
An essential requirement for the planning of the global capacity of a mine is a knowledge of the functional relationship between the production level and the capital expenditure necessary to establish
Jan 1, 1981
-
Financial Evaluation Of Electric Rock Drills For In-Stope Mining In Platinum OperationsBy P. J. Petit
Financial evaluation is necessary to investigate the viability of implementing and/or utilising new technology in mining projects. It establishes a techno-economic base for decision-making and justifi
Jan 1, 2006
-
Contributions to the paper 'Uneconomic gold production in South Africa'By H. L. Monro
Contribution by B. K. Martust I congratulate the author on his interesting paper. In my view, the establishment of the level at which South African gold output is at some kind of optimum is an interes
Jan 1, 1984
-
75th Anniversary of the South African Institute of Mining and Metallurgy Review of the Institute AffairsBy R. C. J. Goode
"In my Presidential address last year `The Institute in Retrospect and Prospect', I briefly reviewed the past activities of our Institute, I commented on the dynamic growth of the mineral activit
-
Phase Transformations And Surface Characterization Of The Platinum-Chromium Coated System ? Synopsis (cd7f692e-c8f8-43df-8e10-650656e74357)By N. Hanief
This research involves the investigation of phase transformations in the platinum-chromium coated system. Single-layer 0.1 µm platinum coatings were deposited via electron beam deposition on 99.98 per
Jan 1, 2012
-
Selective Blast Mining In Gold MinesBy I. Bock
This presentation describes a technique under development referred to as Selective Blast Mining. The technique involves millisecond sequential blasting. It applies to mines where the gold bearing cong
Jan 1, 1996
-
Conditioning in the flotation of gold, uranium oxide, and pyriteBy F. J. N. Stassen
SYNOPSIS The effect of conditioning energy on the flotation of gold, U308, and pyrite was investigated in the range 0,1 to 100 kWh per tonne of dry ore for various combinations of conditioning time a
Jan 1, 1991
-
The acid leaching of nickel and copper from sulphidic ore in the presence of pyriteBy M. J. Southwood
SYNOPSIS Experiments carried out under atmospheric pressure and temperature (25°C) and sterile conditions show that the dissolution rate of nickel and copper from a pyrrhotite-pentlandite-chalcopyrit
Jan 1, 1985
-
Flotation flowsheet for eliminating pyrite in tailings: a cleaner production solution, Y.L. Botero, L.A. Cisternas, L. Cortes, and A. Lopez-ValdiviesoBy L. A. Cisternas, A. Lopez-Valdivieso, Y. L. Botero, L. Cortes
In the processing of sulfidic ores, pyrite is usually depressed and ends up in the tailings. However, pyrite is the most common species responsible for acid mine drainage (AMD) due to its spontaneous
Jan 1, 2020
-
The Jwaneng Resource Extension Project -Defining The Resource, Shaping The FutureBy M. A. Roberts
Oebswana's Jwaneng Mine (south-central Botswana) is the richest diamond mine? in the world and has been contributing substantial revenue to Botswana since the mine started operating in 1982. The
Jan 1, 2010
-
Advanced process control for coal flotation: a case study of the approach and benefits of a structured digitalisation program APCOM 2021By T. Bohmer, L. Auret, N. Pillay, Z. Horn, P. Rambalee, A. Haasbroek
As part of a broader digital technology-enabled transformation programme, a major mining company is systematically implementing Advanced Process Control (APC) solutions and associated instrumentation
Sep 1, 2021
-
Pragmatism in industrial modelling: An application to ladle lifetime in the steel industryBy S. T. Johansen, B. T. Løvfall, T. Rodriguez Duran, J. Zoric
A methodology for building pragmatic physics-based models is here adapted to predict the erosion of ladle linings in the steel industry, in order to support operators when deciding whether the lining
Apr 16, 2024
-
Los Bronces Development ProjectBy Nelson Sánchez
The Los Bronces Development Project (LBDP) was approved in October 2007 by the Anglo American plc Board at a capital cost of some US$1.74B, and is scheduled to be completed by the end of 2010. The pro
Jan 1, 2008