Innovative Integrated Jet Grout And Contiguous Cfa Piled Solution For Complex Deep Shoring Wall In Soft Soils – Retaining Structural Design And AnalysisBy W. L. Chong, Y. Zou
There are many types of Earth Retention Systems (ERS) available in the market where more than one method can be a feasible solution for a project. This paper examines the design and construct process
Nov 1, 2022
-
Ideas To Improve Driven Pile Foundation Design And Installation ProceduresBy Armin W. Stuedlein, Steven R. Saye
The differences between calculated axial pile capacity and the capacity realized during and following installation has long presented a significant concern for foundation engineers and contractors. Su
-
Bio-Grout Based Soil ImprovementBy Terzis D. PhD, Katterbach M.
While awareness around the environmental impact of existing grout materials and chemical binders is increasing rapidly, biotechnologies are growing traction as sustainable alternatives in groundwork o
May 1, 2022
-
Innovative Crosshole Sonic Logging Testing Drilled ShaftsBy Joshua C. Adams, Les Chernauskas, Edward L. Hajduk
"Drilled shafts are increasingly being used to support bridge and building foundations. Because these foundations usually carry very high design loads and often serve as non-redundant, single load car
Jan 1, 2009
-
Simplified Model for Increased Lateral Resistance of Deep Foundations Using Soil MixingBy Hubert Law, Dan A. Brown, Kyle M. Rollins
"Soil mixing and jet grouting provide a means to significantly increase the lateral resistance of pile group foundations with relatively little investment of time, effort, and expense compared to the
Jan 1, 2015
-
Innovations and Challenges during Urban Development – Shoring and Foundations of Canada’s Tallest Residential BuildingBy Shawna Munn, Nadir Ansari, Toben Jerry
With ever increasing demands on space in urban environments and smaller available footprints, buildings are being designed to increasing heights to meet the need. This case study discusses the increas
Jan 1, 2019
-
Embodied Carbon Assessment For A Multi-Phased Development Pile Testing StrategyBy Jack Taggart, Chris Barker
Pile load testing strategies for large infrastructure projects and multi-phase building developments have historically justified cost and programme benefits for undertaking advance preliminary and wor
May 1, 2022
-
Optimizing Large Diameter Concrete Piles in Tidewater VirginiaBy Michael G. Batten, Brian D. Keaney
]The Virginia Department of Transportation (VDOT) and the harbors on the James River routinely use precast concrete piles founded in the Yorktown formation to support bridges and other coastal structu
Sep 8, 2021
-
Capitol Complex Phase 1 ExpansionBy Eric S. Lindquist, Charles A. Luxford
The State of Texas recently adopted a master plan to expand the existing Capitol Complex in Austin. Phase 1 of this expansion will add two new State office buildings and five levels of underground par
-
Quality Control and Testing of Jet Grouting and its Interpretation in Relation to the Christchurch Town Hall Restoration Project.By David Chadwick, Paul Marsden, Chris Hughes, Mathias Delapille
"Following damage caused by the 2011 Christchurch earthquakes, the NZ$127.5million Christchurch Town Hall Restoration project is due for completion in 2018. The building is undergoing extensive repair
Jan 1, 1900
-
Performance Monitoring for Deep ExcavationsBy Alexi J. Neill
"This presentation will showcase two challenging projects with deep excavation support systems in the Atlanta area where state-of-the-art instrumentation and monitoring systems were used to manage ris
Jan 1, 2016
-
Remedial Work On Large Pile Deviation In The Very Thick Marine Swamp Clay DepositBy Wanchai Teparaksa
Pile deviation generally can happen after installation of driven pile particularly in soft soil layers. In this case study, all 242 diameter 0.8 m spun piles were deviated from 20 to 820 mm. The large
Jan 1, 2002
-
Innovations In Diaphragm-Wall Construction PlantBy Maurice Guillaud
The most striking innovations on diaphragm-wall construction plant are those associated with continuous real-time trajectory monitoring of the excavating tool (either a grab or a hydro-cutter). Th
Jan 1, 2002
-
Geotextile Encased Columns (GEC) as Pile-Similar Foundation Elements: Basics, Specifics, Case StudiesBy Marc Raithel, Sven Schröer, Lilma Schimmel, Dimiter Alexiew
"The Geotextile Encased Columns (GEC) deep foundation system for embankments and dikes on soft soils was introduced some 20 years ago and is now considered State-of-the-art in Germany, Europe and, ste
Jan 1, 2017
-
Prevention Of Landslides With Rows Of Pressed-in Pipe Piles On Steep SlopeBy Takefumi Takuma, Masashi Nagano, Koji Kajino
As part of the construction of a multi-span pre-stressed concrete girder bridge for Japan’s new high speed rail line, landslide preventive piles were installed on the flank of a steep slope. The rotar
-
Design, Construction Challenges and Quality Control of a Deep Soil Mixing System for Waterfront Slope StabilizationBy Yan Lap J. Kan
"A waterfront stabilization system consisting of Deep Soil Mixing (DSM) columns, vinyl sheet pile fascia, and concrete flood walls supported on shallow footings was designed and constructed for a high
Jan 1, 2016
-
Northeast Boundary Tunnel – Mount Olivet Road Drop ShaftBy Jeremiah M. Jezerski, Russell H. Lutch
The Mount Olivet Road Drop Shaft (MOR-DS) support of excavation (SOE) is a circular unreinforced concrete shaft with an inside diameter of a 30.5 ft (9.3 m) and depth of 120.5 ft (36.7 m), constructed
Oct 1, 2022
-
Installation and Efficiency of Common Helical Pile CouplingsBy Jason Herron, Joseph Brown
The common couplings for joining sections of helical piles with an outside diameter of 6.625 inches and 8.625 inches are square on square, flange to flange, external pipe sleeve, internal pipe sleeve,
Jan 1, 2019
-
Protection of Waterfront Properties by Pressed-In Sheet Pile SeawallsBy Ian Vaz, Takefumi Takuma, Rafael Holcombe, Chris DellAringa
"This paper will discuss the successful installation of seawalls for the first phase of a project in Long Beach in California known as the Naples Island Permanent Seawall Repair – Phase 1. How an unco
Jan 1, 2016
-
Rock Socket Capacity Certification Using the Point Load Index TestBy Burt G. Look, David W. Lacey
"Certification of foundation capacity during the construction phase is often assessed by strength or weathering state descriptors based on visual observations. This case study used the Point Load Inde