Goethals Bridge Replacement Project - Performance-Based Design of the Drilled Shaft FoundationsBy Chunli Wei, Mark Jen, Xiaojun Wang
"After more than 85 years of service, a critical link between New York and New Jersey, the Goethals Bridge over the Arthur Kill waterway, is being replaced with two new parallel bridges. Each bridge i
Jan 1, 2016
-
Challenges Of Earthen Cofferdam In Deep Excavations For Waterfront Structures, A Case StudyBy Balasubramani M., Ramana P. V., Bairagi K.
This paper is a case study of an earthen Cofferdam, constructed for a deep excavation at Intake location in river Aaundha, Maharashtra, India. A 12 m (39 ft) deep excavation was made to construct the
Nov 1, 2022
-
Excavation-Induced Movement of Adjacent FoundationsBy Hugo Meggitt, Damian R. Siebert, Wystan Carswell
Excavation-induced ground movements are a critical component in the design and construction of deep excavations in urban settings due to the potential adverse effects on adjacent structures and infras
Jan 1, 2019
-
Realistic Estimation Of Water Table Depth For Design Optimization Of Bored Tunnel And Cut & Cover Tunnel Structures For Underground MetroBy Chiranjib Sarkar, Sibapriya Mukherjee, N Kumar Pichumani
With the rapid expansion of urban transportation systems, tunnels and cut & cover structures are considered as the only solution in improving the urban space congestion problem in mass rapid transit s
Nov 1, 2022
-
Urban High Capacity Deep Foundation Solutions in Sites with Complex History and GeologyBy Karen C. Armfield, Gisele R. Passalacqua, Joanna Smith
New York City is an urban environment with a history spanning over 200 years. The coastline of New York has changed over the years. In the East River, old bulkhead and remnant of relieving platforms t
Jan 1, 2019
-
Application Of Pile Test Data For The Foundation Design Of Rail Viaduct At Carrum, VictoriaBy Nick M. Withers, Suthagarann Visvalingam, Cillian Mc Colgan
The level crossings removal project in Victoria is removing 75 level crossings across Melbourne to improve safety by separating trains from traffic, with other benefits such as reduced congestion, an
Nov 1, 2022
-
Constructing Tsunami Walls with Pressed-In Sheet and Pipe Pile Combi-WallsBy Takefumi Takuma, Tsunenobu Nozaki, Masashi Nagano
The city of Naruto in the southwestern part of Japan is situated at the mouth of the mighty Yoshino River. An approximately 1,000m-long levee/bulkhead along one of the river’s tributaries in the city
Sep 8, 2021
-
Deep Foundations for Top-Down Construction of High-Rise ProjectBy Martin B. Hudson, Kenneth S. Hudson, Gwendolyn Arreguin
A twin high-rise project site in Century City posed several foundation engineering challenges for the design team. One portion of the twin high-rise project site was required to utilize top-down const
Jan 1, 2019
-
Top-Loaded Bidirectional Test, a New Approach to Deep Foundations Load TestingBy Patrick J. Hannigan, Frank Rausche, Rozbeh B. Moghaddam
The Top-Loaded Bi-Directional Test (“TLBT”) is a new method to apply bi-directional loads to a deep foundation element with the loading source located above the foundation head. In the TLBT reusable l
Sep 8, 2021
-
Design, Installation And Performance Of Earth Retention System To Limit Ground Movements Around Sensitive Structures In Washington, DcBy Douglas R. Hardin, Stanley L. Worst, Joanna Mason
A challenging earth retention project presented itself in Washington, DC in the backyard of the historic House of the Temple (The Scottish Rite of Freemasonry, Supreme Council 33°). Located at 15th St
Oct 1, 2022
-
Solving Variable Bedrock Challenges With Ductile Iron PilesBy Kevin R. Johnson, Matt Caskey, Bryan Plaskett
Working in urban environments presents unique logistical challenges beyond those typically associated with traditional geotechnical design and construction. These challenges can include constrained si
Oct 1, 2022
-
The Need For Air Control In Down The Hole Hammer Casing Advancement DrillingBy Frank J. Purcell
“Down The Hole” (DTH) hammer drilling is often necessary to advance the casing during pile construction where the test bores have determined difficult drilling conditions with obstructions such as bou
Nov 1, 2022
-
Case Histories of Circular Secant Pile Access Shafts for TunnelsBy Piotr Kozlowski, Stanley L. Worst, Matthew J. Niermann
Circular secant pile shafts were installed along the tunnel alignments for both the Ohio Canal Interceptor Tunnel project in Akron, Ohio and the Ohio River Tunnel project in Louisville, Kentucky. The
Jan 1, 2019
-
Cement Deep Soil Mixing Shear Wall Stabilization Calaveras Dam Replacement Project, CaliforniaBy Michael Forrest, John Roadifer, Glen Gorski
"The Calaveras Dam Replacement Project (CDRP) requires large disposal sites to store excess excavated materials that could not be utilized for dam construction. Because of access restrictions during d
Jan 1, 2015
-
Value-Engineering of H-Pile Foundations in Karstic GeologyBy Rachael M. Fischer, Daniel J. Woeste, Terence P. Holman
"A new 50 MW biomass renewable energy power plant was planned for construction in southwestern Georgia. The original foundation design consisted of very conservatively designed H-pile groups with vert
Jan 1, 2016
-
Experimental P-Y Curves from Centrifuge Tests on Pile Foundations Subjected to Liquefaction and Lateral SpreadingBy Arash Khosravifar, Nason McCullough, Stephen, Milad Souri, Scott Schlechter, E. Dickenson
The results of five centrifuge models were used to evaluate the response of pile-supported wharves subjected to inertial and liquefaction-induced lateral spreading loads. The centrifuge models contain
Jan 1, 2019
-
Horseshoe Secant Compression Shoring System For Tunnel RepairBy Karen Talbot, Noah Maier, Rob Jameson, Giuseppe Gaspari
A storage and drainage tunnel advancing below I-75 in Detroit, Michigan experienced sudden subsidence. The Tunnel Boring Machine (TBM) was damaged to the extent that its shield, cutting head and exten
Oct 1, 2022
-
Excavation Support by Deep Soil Mixing- Challenges on Depth and Long Term ExposureBy D. Barber, A. D. Miller, P. A. Bray
The project was to develop an area within the existing West County Wastewater Treatment Plant which would enable the construction of a new Raw Wastewater Pump Station (RWPS) with a footprint of approx
Jan 1, 2017
-
Shaftcam: A Practical and Cost Effective Solution to Drilled/Bored Pile Hole InspectionBy Sastry Putcha, Santosh Mummaneni, Avasarala Swamy
"Inspection of bored pile hole bottom prior to placement of concrete is one of the most crucial element of foundation design and construction, especially for end bearing piles. Pile hole bottoms that
Jan 1, 1900
-
Value Engineering Through Systematic Site Investigation and Design Optimization – A Case StudyBy Lu Yitan, Frances Badelow, Manish Tiwari
"Large ‘design and construct’ projects often present significant geotechnical risks. However, these also present significant opportunities for value engineering in design. These opportunities can be r
Jan 1, 1900