    Kiena Maintains Up To Date Image with a New Gold Mill

    By R. Jolicoeur, J. F. Jackson, M. A. Green

    "The design, construction and commissioning of Kiena Gold Mines Limited's new mill was completed in 15 months ending in September 1984. Rated at 1250 tonnes per day the mill incorporates the latest in

    Jan 1, 1986

  • CIM
    Maximizing Ore Extraction at Brunswick Mine

    By Barara Rose

    Presentation Outline ?Introduction of BMS ?Resource Integration Process ?Methodologies ?Tools ?Case Studies ?Zone 01 : 725 SOZ ?Zone 16/17 : 1000 NRP ?Conclusions

    Oct 1, 2010

  • CIM
    An Instrumented Laboratory Cell for Gold Cyanidation Modelling

    By M. Kane, B. Bissonnette, D. Hodouin

    "A laboratory cell has been designed for a careful investigation of gold ore cyanidation using mathematical modelling of the process kinetics. The cell is a stirred vessel with continuous monitoring a

    Jan 1, 1990

  • CIM
    An Investigation in the Stand up Time of Stopesat Birchtree Mine in Thompson, Manitoba

    By Matthew Violot

    Introduction ?Located off highway 6, approximately 5 km, SW of Thompson, Manitoba ?Base metal mine: Nickel? Maximum Depth: 4100 ft ?Started Production in 1966 (INCO, 2006)?Halted in 1978?Re-opened

    Nov 1, 2011

  • CIM
    Modified Stability Graph Method with a new Rock Stress Factor

    The Stability Graph Method is widely used in Canadian underground hard rock mines for open stope support design and is frequently used in the mine planning phase to assess the viability of stope geome

    May 1, 2011

  • CIM
    Hydro-geotechnical and geochemical characterization of column consolidated cemented paste backfill

    By T. Belem

    The main objective of this study is to better understand the effect of underground CPB placement conditions on its microstructural, hydro-mechanical and geochemical properties. To reach this objective

    May 1, 2007

  • CIM
    Advances in Precious Metal Trace Element Analyses for Deportment using LAM-ICP-MS

    By Paul J. Sylvester, Yeonuk Choi, Mike Nelson, Louis J. Cabri, Mike Tubrett

    "The development and characterization of sulphide standards containing as many as seven precious metals has increased the efficiency and comprehensiveness of micro-analyses for deportment studies usin

    Jan 1, 2010

  • CIM
    Expert System Technology at the Polaris Mine

    By G. A. Kosick, C. A. Harris

    "Metallurgy at the Polaris Mine is approaching an impasse, with lead and zinc concentrate grades and recoveries approaching their theoretical maximums. In an effort to increase productivity, plant thr

    Jan 1, 1988

  • CIM
    Factors Influencing the Expert System Profitability

    By Andy Fortin, André Vien, Christophe Bouché, Jeff McKay

    "The technology and equipment design of the Twenty-first Century permit us to exploit low-grade ore bodies with milled tonnages reaching 300,000 tpd. Because of their substantial operational costs (en

    Jan 1, 2003

  • CIM
    Factors That Affect Cemented Rockfill Quality in Nevada Mines

    By David M. R. Stone

    Underground mining in the gold industry is gaining popularity in Nevada, and with it the use of cemented rockfill is becoming mainstream. Even with today?s high metal prices, however, mining companie

    May 1, 2007

  • CIM
    Optimization of SAG Mill Process Control at the Raglan Mine

    By G. Couture, J. -F. Dubé, F. Letarte-Lavoie

    "The Xstrata Nickel Raglan concentrator, located in Quebec’s Nunavik region, has been in operation since 1997. Originally designed to process 800,000 tonnes per year of high-grade nickel ore, the plan

    Jan 1, 2013

  • CIM
    An Expert System Supervisor of a Flotation Circuit

    By A. L. Mular, R. P. Edwards

    "The operation of flotation circuits is often regarded as a combination of art and science. Expert systems offer a method by which the art may be captured and supervisory control of flotation circuits

    Jan 1, 1991

  • CIM
    Water Management and Effluent Treatment Practice

    By C. Larsen, E. Goodwin, E. Konigsmann

    "This paper describes the development of an innovative effluent treatment process for cyanide and heavy metal removal from tailings wastewaters at Hemlo Gold Mines Inc. Golden Giant operation.The impo

    Jan 1, 1989

  • CIM
    Selectivity in the Collectorless Flotation of Two Complex Sulphide Ores

    By M. Leroux, P. Lacombe, S. R. Rao, J. Y. Kim, J. A. Finch, G. Labonté, N. Macminn, M. Ounpuu

    "Laboratory investigations on two complex ores, the A1 zone ore from Les Mines Selbaie and the Lyon Lake ore from Mattabi Mines Ltd. (Division of Noranda Minerals), have been carried out to determine

    Jan 1, 1990

  • CIM
    Reducing maintenance costs through predictive fault detection

    By Y. Faitakis

    In the mining industry, maintenance is a key priority and a major expense. As mining equipment is large in scale, high in cost, and difficult to tow, it is key to maintain equipment on a timely basis.

    Jan 1, 2004

  • CIM
    Reducing maintenance costs through predictive fault detection (c13d7cbc-4e81-4449-b672-3dadc240a5a9)

    By Y. Faitakis, G. J. Powley, C. Mackenzie

    "In the mining industry, maintenance is a key priority and a major expense. As mining equipment is large in scale, high in cost, and difficult to tow, it is key to maintain equipment on a timely basis

    Jan 1, 2004

  • CIM
    The evolution of advanced guidance techniques for autonomous underground vehicles

    By L. Bloomquist

    This paper describes how Automated Mining Systems (AMS) is evolving the state-of-the-art in guidance systems for autonomous underground vehicles. The techniques, trade-offs, and lessons learned from t

    Jan 1, 2004

  • CIM
    The evolution of advanced guidance techniques for autonomous underground vehicles (8e8c3b94-ac75-4947-840c-a59d92585998)

    By L. Bloomquist, C. Arnoldi

    "This paper describes how Automated Mining Systems (AMS) is evolving the state-of the- art in guidance systems for autonomous underground vehicles. The techniques, tradeoffs, and lessons learned from

    Jan 1, 2004

  • CIM
    Automated Real-Time Elementary Analysis of Drill Dust using LIBS Technology

    By Karl Nienhaus

    The BGMR has developed a method for an online-analysis during drilling processes in cooperation with Fraunhofer Institute for Laser Technology in Aachen and various industrial partners. This allows fo

    Oct 1, 2009

  • CIM
    Geometallurgical Mapping: A New Approach That Reduces Technical Risk

    By Jean M. Richardson, Steven R. Williams

    "Geometallurgical mapping is a new team-based approach that documents variability within an orebody and quantifies the impact of geology (host rocks, alteration and structure) and mineralogy on grindi

    Jan 1, 2004