Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Hydrometallurgical Process Development for Recovery of Dysprosium from Permanent Magnet Scrap Leach Liquor Using 2-Ethylhexyl Phosphonic Acid Mono-2-Ethylhexyl Ester (Pc 88a) as an Extractant System

    By Kyeong Woo Chung, Ho-Sung Yoon, Jyothi Rajesh Kumar, Chul-Joo Kim, Sung-Don Kim

    The aim of the present study is to investigate the extraction, separation and recovery of the indivisible metals of dysprosium and neodymium from permanent magnets scrap leach liquor solutions with me

    Jan 1, 2014

  • CIM
    Effect of Alloying Additions on Texture Development in Hot Processing of Creep Resistant Magnesium Alloys

    By D. G. Sediako

    Chemical composition and the casting/rolling production routes determine the cost and properties of the wrought material. For example, the coarse-grained structure frequently associated with DC castin

    Jan 1, 2007

  • CIM
    Advantages of the Collaborative R&D Model

    By Anthony T. Eyton

    Intelligent Systems: Advantages for Mining ? Increased safety (reduced risk to workers) ? Increased productivity (reduced downtime) ? Reduced maintenance costs ? Customized solutions for differen

    May 1, 2002

  • CIM
    Chapter IV - Appalachian Region - Part 1.-Eastern Townships and Gaspé Eustis Mine

    By H. C. Cooke

    "The Eustis mine, which was discovered in 1865, lies about 6 miles southwest of the city of Sherbrooke, Quebec, in lots 2, 3, and 4, range 9, Ascot tp. The mine was operated almost continuously from 1

    Jan 1, 1954

  • CIM
    Mechanical Behaviour of an Australian Mudstone Subjected to Heating Treatment at High-Temperatures

    By X. F. Liu, O. Buzzi, Y. Sieffert

    This study falls in the context of underground coal fires (UCF) where burning coal can elevate the temperature of a rock mass in excess of thousand degrees. The objective of the research was to experi

    Jan 1, 2015

  • CIM
    The River Jordan Lead Zinc Revelstoke Mining Division, Deposit, B. C.

    By Christopher Riley

    A relatively unexplored lead zinc deposit lies about 12 miles northwest of Revelstoke, B.C., in the highly metamorphosed Monashee Group of rocks of the Shuswap Terrane, Precambrian in age. Host rocks

    Jan 1, 1961

  • CIM
    Applying Online Ore Hardness Estimation to Sag Operation and Optimisation

    By S. Makni, G. Gagnon, F. Couët, C. Rochefort

    "Comminution represents a significant part of mineral processing plant operating costs. Yet, autogenous (AG) or semi-autogenous grinding mills (SAG) are difficult to control because of disturbances li

    Jan 1, 2016

  • CIM
    Development Trend of Underground Rock Support

    By C. C. Li

    Traditionally, strong and stiff devices, such as fully encapsulated rebar bolts and concrete lining and arches, are preferred for underground rock support. The attention is paid to the strength of the

    Jan 1, 2015

  • CIM
    Iron Control in Zinc Solvent Extraction: The Técnicas Reunidas Experience

    By G. Diaz

    Técnicas Reunidas (TR) has been involved for over 30 years in the development of process technologies for the recovery of zinc from different primary and secondary feed materials, such as the ZINCEXTM

    Jan 1, 2006

  • CIM
    Rouyn Merger Mine

    By R. V. Hopper, M. E. Wilson, L. S. Trenholme

    "The Company known as Rouyn Merger Mines, Limited, was formed in 1943 to take over the ownership of claims in Rouyn and Joannes townships formerly held by East Rouyn Mines, Limited, O'Neil Thompson Mi

    Jan 1, 1954

  • CIM
    Towards AG/SAG/BALL Mill On-Line Performance Prediction?

    By P. Radziszewski

    Industrial practice in mineral processing shows that an important problem in understanding and monitoring in-mill parameters is due to the lack of fundamental knowledge and appropriate sensors. With t

    Jan 1, 2007

  • CIM
    Sinking of MacLean Shaft at Buchans, Newfoundland

    By The Staff

    "A general description of the equipment, personnel and work sequence •being used in the sinking of a circular, concrete lined, 14 foot diameter shaft which at present is at a depth of 2,484 feet. Equi

    Jan 1, 1959

  • CIM
    Magnetic Processing of a Rare Earth Element Bearing Ore

    By Adam Jordens

    Along with gravity separation and froth flotation, magnetic separation is one of the most common techniques for separating minerals. Minerals are separated by a magnetic force that is dependent on a c

    Aug 1, 2013

  • CIM
    Campbell Chibougamau Mines

    By S. E. Malouf, R. Hinse

    "The Mineral possibilities of the Chibougamau area were first recognized by Richardson in 1870 and Low in 1885, both of the Geological Survey of Canada. The first record of interest by the Quebec Bure

    Jan 1, 1949

  • CIM
    Cold Water Thawing of Frozen Placer Gravel

    By John Lund

    INTRODUCTION GOLD-BEARING placers of Alaska and the Yukon Territories are buried under a layer of permanently frozen alluvial overburden, or 'muck', which varies in depth from twenty to one

    Jan 1, 1951

  • CIM
    Numerical simulation of coupled fluid flow and solidification in a single-roll caster

    By S. H. Seyedein

    A mathematical model was developed to study fluid flow and solidification in a single-roll casting system. Fluid flow coupled with energy equations were solved numerically using a finite volume method

    Jan 1, 2004

  • CIM
    Modeling of electromagnetic separation of nonmetallic inclusions from magnesium melts

    By M Reza Afshar

    In this work a mathematical model was developed to study the effect of electromagnetic force on the magnesium melt containing nonmetallic inclusion in an electrical isolated channel. The electromagnet

    Jan 1, 2004

  • CIM
    Principal Component Analysis Applied to Surface Chemistry in Minerals Flotation

    By B. Hart, D. J. Miller, J. T. Francis, M. C. Biesinger, Smart. R. St. C.

    Diagnosis of the surface chemical factors playing a part in flotation separation of a valuable sulfide phase requires measurement of the hydrophobic and hydrophilic species that are statistically diff

    Jan 1, 2004

  • CIM
    Hydraulic tailing backfill plants

    By E. J. Marcotte

    "IntroductionDevelopments in the preparation, hydraulic transportation and placement of classified mill tailing as an effective backfill and support for mining excavations, have made feasible several

    Jan 1, 1989

  • CIM
    Daniel–Johnson Multiple Arch Dam, Québec, Canada - Rock Foundation Safety Assessment

    By Marco Quirion

    The Daniel-Johnson dam, formerly named Manicouagan-5 (Manic-5), is located 800 km northeast of Montreal (Quebec) in Canada. This is the largest multiple-arch concrete dam in the world consisting in 13

    Jan 1, 2015