Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    7th Müller Award Lecture Engineering in Fractured Rock Masses

    By J. A. Hudson

    "The paper begins with a brief summary of Professor Müller’s formation of the ISRM and the contents of the previous six Müller lectures with their emphases on rock fractures. The geological origin of

    Jan 1, 2015

  • CIM
    A Comparison of Ferrihydrite and Aluminum-Modified Ferrihydrite for the Removal of Arsenate from Aqueous Solution by Co-Precipitation

    By J. W. Hohn

    The precipitation of Fe(III) to form ferrihydrite in the presence of arsenic is the United States EPA's Best Demonstrated Available Technology for treating arsenic-containing hydrometallurgical s

    Jan 1, 2006

  • CIM
    Evaluation of Preg-Robbing in Goldstrike Carbonaceous Ore Using Raman Spectroscopy

    By M. M. Helm

    Samples sourced from the Goldstrike property in Nevada USA, have been evaluated in terms of their preg-robbing capacity and the physical structure of the graphitic carbon component in the carbonaceous

    Jan 1, 2011

  • CIM
    Structural Considerations Affecting Selection of Major Components in Grinding Mill Design

    By Rhual L. Guerguerian

    MINING has been practised by mankind for over sixty centuries (1). In 1876, the "ball mill" was patented, and during the century that followed rotary grinding developed to the state where individual m

    Jan 1, 1978

  • CIM
    A Projection of Future Energy and Greenhouse Gas Emissions Intensity from Copper Mining

    In this study, we develop a detailed model of the likely future carbon footprint of primary copper supply. We develop a peak copper production model, based on a detailed copper resource data set, and

    Aug 1, 2013

  • CIM
    Process Improvements at Falconbridge Dominicana

    By D. Ortiz, J. R. Frias, E. D. Mast, J. J. Fañas

    Falconbridge Dominicana (Falcondo) has operated an integrated tpy nickel laterite mine and ferro-nickel processing plant since 1972 in the Dominican Republic. The operation includes mining, a processi

    Jan 1, 2005

  • CIM
    Development (Optimezation) of the Detour Lake Concentrator Flowsheet: Integration of the Results of Comminution and the Metallurgical Testwork Program

    By A. Allaire, J. Torrealba-Vargas, R. Welyhorsky

    Early testwork was carried out to select the plant process design criteria and flowsheet selection. Additional testwork was carried out during the feasibility study to support the optimization of the

    Jan 1, 2011

  • CIM
    The Regrinding of Copper Concentrate in a Stirred Ball Mill

    By A. O. Orumwense

    Mill circumferential speed, the number of passes of pulp through the grinding chamber, media type, size and filling ratio were investigated in an attempt to determine how to effectively grind copper c

    Jan 1, 2006

  • CIM
    Ventilation as a Means to Prevent Silicosis in Ontario Mines

    By Clifford S. Gibson

    THESE troubled times suggest three reasons for maximum effort to control silicosis: (1) To keep to a minimum the ever-increasing burden occasioned by past deficiencies in this respect. (2) To effe

    Jan 1, 1942

  • CIM
    Column Flotation Development for Copper Scavenging in Inco's Matte Separation Process

    By R. Stratton-Crawley, S. W. Wilson

    "Inco's Matte Separation Plant is a unique mineral processing facility having no process tailings stream. Each product is a high-grade concentrate with strict assay specifications which are defined by

    Jan 1, 1991

  • CIM
    Gold-Vanadia Supported Catalysts for Complete Oxidation of Hydrocarbons

    By Donka H. Andreeva

    Gold catalysts based on different supports, titania, zirconia, ceria and mesoporous titania and zirconia, nonpromoted and promoted by vanadia in the reaction of complete benzene oxidation have been st

    Oct 1, 2003

  • CIM
    Production of High Strength Pipe Steels by the CSP® Thin Slab Technology

    By J. Kempken, R. Hagmann, C. -P. Reip, W. Hennig

    The CSP technology symbolizes a highly productive process for the cost-effective production of steel grades with a range of sophisticated properties comprising both the inner quality of hot strip, its

    Jan 1, 2005

  • CIM
    Application of Consolidated Rock Fill to Open Stoping in Underground Mines

    By Jerry Ran

    Many large underground mines using the open stoping method have changed their primary applications of consolidated rock fill (CRF) to paste or consolidated hydraulic fill due to considerations of dema

    Jun 1, 2012

  • CIM
    Concentrator Operation at Brunswick Mining and Smelting Corporation's No. 12 Mine

    By G. W. Neumann, J. R. Schnarr

    The lead-zinc-copper-silver ores mined by Brunswick Mining and Smelting Corporation Limited at their No. 12 underground mine and No. 6 open-pit operation, and treated by distinct concentration process

    Jan 1, 1971

  • CIM
    Comparison of Reinforcement Benefits of Spray-on Linings in Side-by-Side Unconfined Compression Failure Tests on Rock

    By James F. Archibald

    Testing has been accomplished to substantiate recent laboratory trials which have demonstrated that thin liner membranes, applied to rock core samples, can significantly enhance the structural perform

    May 1, 2001

  • CIM
    Effects of Surface Forces and Film Elasticity on Foam Stability

    This paper describes basic parameters, such as surface forces and film elasticity, affecting the stability of foams (two-phase froths). We used the thin film pressure balance (TFPB) technique to measu

    Jan 1, 2006

  • CIM
    Combined Technology of Oxidized Nickel Ore Processing

    By T. A. Chepushtanova, I. U. Motovilov, V. A. Luganov, G. D. Guseynova

    "Kazakhstan has significant reserves of oxidized nickel ore with low nickel content. Processing of such ores is effective via pyrometallurgical technologies such as smelting to ferronickel or matte wi

    Jan 1, 2016

  • CIM
    Mining Methods and Practices at Lake Shore

    By Leslie S. Weldon

    THE Lake Shore mine has been developed by two vertical shafts, with level intervals at 200 feet to the 2200 level and at 125 feet below this horizon. A main cross-cut joins the two shafts on all level

    Jan 1, 1936

  • CIM
    X-Ray Visualization of Graphite Reduction of Molten Nickel Matte, Oxysulphide and Slag

    By T. A. Utigard

    To improve recoveries of Ni, Cu and Co in the Inco flash furnace, a new operating concept was investigated. By adding sufficient coke to form a supernatant coke layer, a reducing barrier would form al

    Jan 1, 2005

  • CIM
    Dynamic Simulations for Off-Gas Systems Design

    By D. Berkley

    Off-gas systems often become the limiting factor in production increase and environmental projects. Any upgrade or new off-gas project needs to address control instability issues, instabilities that c

    Jan 1, 2005