Characteristics of Wenchuan Earthquake and its Geological Hazard EffectsBy Yun-Jie Wei
Seismic areas were in the eastern margin of the Qinghai-Tibet plain, whose structures were complicated, mainly composed of Maowen fault, Yingxiu fault and Pengxian-guanxian fault. The rapid rise of th
May 1, 2009
-
Flotation Process Optimization Using Outotec Frothcontrol SolutionBy M. Mononen, J. Huuskonen, M. Vauhkonen, J. Kourunen, A. Lehikoinen
"A new approach to measure process conditions in flotation cells is presented. Real scale flotation cells in a Zinc circuit are imaged using Outotec LevelSense sensors based on electrical resistance t
Jan 1, 2013
-
The Caustic Crack Route for Processing Concentrate from the Avalon Nechalacho DepositBy Dave Marsh, John Goode, Niels Verbaan, Kevin Bradley, Henrie Notzl
The mineralogy of the Avalon Nechalacho deposit is complex with significant fractions of HREEs, Zr, and Nb found in refractory minerals such as zircon and fergusonite. Sulphuric acid baking followed b
Jan 1, 2014
-
Flash Flotation Circuit Design Considerations"The first SkimAir flash flotation cell was installed in Outokumpu’s Hammaslahti Copper Concentrator in 1982 to prevent overgrinding of soft sulphides in the milling circuit. Since this first installa
Jan 1, 2017
-
Erosion/Corrosion Effects on the Design and Maintenance of a Potash RefineryBy J. Davis, M. G. Reading
"INTRODUCTIONInternational Minerals and Chemical Corporation (Canada) Limited operates two potash mine/refinery complexes near Esterhazy, Saskatchewan. Annual production of approximately 4.2 million t
Jan 1, 1983
-
Fuel cell risk assessment, regulatory compliance, and implementation of the world’s first fuel cell-powered mining equipment at the Campbell Mine (2f329a25-0d4f-40d5-a572-5230f6f201ab)By T. MacKinnon, M. C. Bétournay, D. Eastick, F. C. Delabbio, C. Graves
"The successful implementation of a new technology in an underground production mine requires many challenges to be overcome. These challenges include mine hardening of new technology, mitigation of s
Jan 1, 2005
-
Mine Planning for Ore DilutionBy John G. Henning
Unplanned ore dilution has a direct and large influence on the cost of a stope, and ultimately on the profitability of a mining operation. This paper presents results of a study on the influence of a
May 1, 2007
-
The Stillwater Paste Backfill PlantBy Frank Yu, Bob Fukuhara
"The Stillwater mine is a 3,000 tons/day platinum/palladium underground mine and flotation concentrator located in the Beartooth mountain range in south-central Montana. The site elevation is 5,000 fe
Jan 1, 2000
-
Convergence of Safety Technologies ISARC ? World Mining Congress 2013Pressure for Better Safety Practices ? Increase Government Regulation ? Safety practices evolve from: ? Increased efficiency and performance ? More knowledgeable workforce ? Focus on decreasing
Aug 1, 2013
-
Tentative identification of chemical elements likely to escape in the atmosphere attheLingan coal-fired power plant, Lingan, Nova ScotiaBy Erwin L. Zodrow
"The neglect of including the toxic metal mercury in the list of escaping elements (Zodrow, CIM Bulletin, September 1982, pp. 138-140) was pointed out to the author in a private letter by J.E. Rehder,
Jan 1, 1982
-
Continuous Process for the Production of Lithium CarbonateqBy C. A. Olivier
Le Ministère des Richesses naturelles du Québec has continued development work on the process/or direct reaction 0/sodium carbonate with lithium-bearing silicates(Canadian Patent No. 643,843). Recent
Jan 1, 1979
-
Galore Creek ProjectProject Located in northwestern British Columbia 70km West of Cassiar Highway Galore Creek Project and Road Access Corridors Designated For Mineral Development in Stikine-Cassiar Land Resource Manag
May 1, 2006
-
Artificial Geo-Hydrological ZonationBy J. A. López-Molina, S. García, V. Castellanos-Pedroza
"Groundwater inflow into underground constructions may cause hazardous working conditions and environmental problems. It is essential to localize and characterize potential flow paths and to estimate
Jan 1, 2015
-
Integrated Underground Mining and Processing Of Massive Sulphide OresBy Bern Klein, Malcolm Scoble, Justin Widdifield, Andrew Bamber
"It has been suggested that the pre-concentration of ore underground can bring positive economic and environmental benefits to underground mining, particularly at extreme depth. The integration of min
Jan 1, 2006
-
Development of Geometallurgical Comminution Mapping and ModellingBy Luke Keeney, Stephen Walters
"The start up of a new mining and metallurgical facility is a crucial step in the life of any mining project. The mining industries record is poor when evaluating processing plant operation relative t
Jan 1, 2009
-
The Importance of Water Utilization for Maximizing Grinding Circuit Classification System EfficiencyBy Robert E. McIvor
"The Functional Performance Equation for ball milling circuits allows us to isolate the circuit classification system efficiency (CSE) from the mill’s grinding performance. The factors which affect ci
Jan 1, 2009
-
Monitoring the Burner Emission Spectrum in a Commercial Flash Furnace Using a Novel Optical ProbeBy G. Stokreef, B. R. Davis, M. Kadiyski, Alvear Montenegro, H-P. Loock, V. Montenegro
An optical probe for burner monitoring in copper flash smelting, first developed at the University of Concepcion, is being industrially tested in a collaboration between Kingston Process Metallurgy, A
Jan 1, 2019
-
Back Caving Mechanism and Preventive Measures for Deep Open Stopes ? Case StudiesBy Jerry Ran
Stope back caving in a mine using open stope mining interrupts the planned mining sequence and causes oversize muck and dilution with adverse economic implications. As many underground mines are minin
May 1, 2004
-
Properties and Potential Applications of Meso-Porous GoldBy Michael B. Cortie
Mesoporous gold sponge has the unique property of being both metallic and highly resistant to oxidation. It has potential application in catalysis, in bio-sensors, in optical coatings, in analytical c
Oct 1, 2003
-
An undergraduate pilot plant experienceBy L. J. Heaslip, J. M. Toguri, T. R. Meadowcroft, R. L. Addinall
"""Pilot Plant Operations"" is a final-year core course given to the Metallurgy and Materials Science students at the University of Toronto. This course involves a laboratory study of an industrial pr