Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Electrodeposition of Cobalt Metal: Effect of Sodium Octyl Sulphate

    By B. C. Tripathy, S. K. Padhy, R. K. Paramguru, Pinak Patnaik

    "Cobalt is regarded as technology enabling metal among the less abundant metals found in the earth crust. Electrodeposition of the metal from aqueous sulphate solutions is the preferred technology for

    Jan 1, 2016

  • CIM
    Valuation of Non-Producing Mineral Properties

    By William E. Roscoe

    "Valuation methods are well established for mineral properties with production or imminent production, and include discounted cash flow and comparable transactions. Valuation methods for non-producing

    Jan 1, 2003

  • CIM
    The Mineral King Mine

    By W. W. Cummings

    The Mineral King Mine, owned and operated by Sheep Creek Mines is located in the Purcell mountain range of southeastern British Columbia. Production of lead and zinc concentrates commenced in 1954 som

    Jan 1, 1960

  • CIM
    The value of decelerometer testing

    By Keith Jones, Largo Albert

    "Decelerometer testing of a rigid guide system in a mine shaft pro vides usefuI information to operating and maintenance people. High acceleration/deceleration rates can lead to high maintenance costs

    Jan 1, 1984

  • CIM
    Small Scale Mining using the Modular Gold Processing Unit at the Granada Mine, Rouyn-Noranda, Quebec

    By Louis Cabot

    A pilot plant of the Modular Gold Processing Unit (MGPU) was designed, installed and operated, over a 8 months period, by RSW-Béroma, at the Granada Mine located near Rouyn-Noranda, Quebec. A descript

    May 1, 2001

  • CIM
    A Property Based Model of Flotation and Application in a Dynamic Simulator for Training Purposes

    By A. Aaltonen, S. Paloranta, H. Myllykangas

    A property based dynamic model of flotation was built and validated for training purposes. The model is based on the work of the AMIRA P9 project. The recovery of each particle with composition and si

    Jan 1, 2009

  • CIM
    Comparison of Mine Ventilation Software Tools for Underground Coal Mines in Harsh Conditions

    By T. Imgrund, A. Bischoff, S. Spürk

    "Specific conditions of underground coal mines at great depth, such as high temperatures, high rates of methane inflow and natural ventilation pressure provide considerable challenges for the reliable

    Jan 1, 2019

  • CIM
    Design of the New Lihir Gold Pressure Oxidation Autoclave

    By M. J. Collins, B. Parekh, A. Hasenbank, B. Hewitt

    Newcrest Mining Limited, originally as Lihir Gold, has operated a pressure oxidation plant for the recovery of gold from refractory ore since 1997. The mine and gold plant are located on Lihir Island

    Jan 1, 2011

  • CIM
    Multiplying Manpower with Scrapers

    By Roger V. Pierce

    IN the last few years, much study has been devoted to increasing stoping efficiency. The reasons for this are shortage of manpower, shorter working hours, operating regulations, and shortages of essen

    Jan 1, 1943

  • CIM
    Improving Energy Efficiency in Barrick Grinding Circuits

    By Lloyd Buckingham

    Barrick Gold Corporation (Barrick) has undertaken innovative methods of evaluating and improving the performance of grinding mills in several of its operations around the world. The results have been

    Jan 1, 2012

  • CIM
    Cape Breton Development Corporation - Victoria Junction coal preparation plant

    By J. G. Martin, J. C. Campbell

    THE VICTORIA JUNCTION 31,4-million-ton coal preparation complex went into operation in October 1976."' It is designed to produce a metallurgical coking coal by lowering the sulphur and ash content of

    Jan 1, 1985

  • CIM
    Heap Leaching of Gold Ores in Permafrost Conditions

    By V. I. Lakshmanan, I. G. McColl

    "Heap leaching of gold ores in permafrost conditions is feasible provided certain criteria are met. These criteria include relatively short heap leach residence time and the availability of waste heat

    Jan 1, 1987

  • CIM
    Stress-to-Strength Characteristics of Brittle Failures around Underground Excavation Openings

    By R. Wang

    "Under high stress conditions, rock bursts, borehole breakouts, and spalling events are common phenomena that occur around underground openings. In general, together these three phenomena represent br

    Jan 1, 2015

  • CIM
    Project Environmental Approval

    By B. R. Boardman

    Project Environmental Approval is a multi-faceted issue. From a mining perspective, it is a costly item because of avoidable time delay. The government perspective is that the approvals are a necessar

    Jan 1, 1978

  • CIM
    Geology and Geochemistry of the Águas Claras and Pico Iron Mines, Quadrilátero Ferrífero, Minas Gerais, BRAZIL

    By Carlos Alberto Spier

    The Águas Claras and Pico mines are two world-class, iron-ore mines hosted within Lower- Proterozoic banded iron-formations (locally known as itabirites) of the Minas Supergroup located in the Quadril

    May 1, 2003

  • CIM
    A comprehensive model for calculating phase equilibria and thermophysical properties of electrolyte systems

    By A. Anderko, R. D. Springer, R. D. Young

    A thermodynamic model has been developed for calculating phase equilibria and other properties of multicomponent electrolyte systems. The model has been designed to reproduce the properties of both aq

    Jan 1, 2005

  • CIM
    Determination of the strength of hard-rock mine pillars

    By P. J. Lunder, R. C. Pakalnis

    This paper presents the results of research that has been undertaken in order to develop an improved method of determining the strength of hard-rock mine pillars. Pillars are found in various shapes a

    Jan 1, 1997

  • CIM
    Numerical Simulation of the Stress Field in Wushaoling Tunnel

    By Yang Shuxin, Guo Qiliang, He Ping, Lu Lizhi, Yao Rui

    "We combined stepwise regression and constrained regression statistical method to obtain the best boundary conditions for the calculation of in-situ stress field in Wushaoling tunnel using finite elem

    Jan 1, 2015

  • CIM
    Mirador Copper - Gold Project

    Mirador - Overview ? Located in Andean foothills of SE Ecuador ? Copper-gold porphyry hosted by calc-alkaline Late Jurassic granitic and porphyritic rocks ? 438 MT of 0.61% Cu and 0.19 g/t Au measu

    May 1, 2006

  • CIM
    Hydrogenation of Crotonaldehyde by Nanoparticles of Gold Supported on TiO2 Prepared by Deposition-Precipitation with NaOH and Urea

    By Rodolfo Zanella

    Au/TiO2 catalysts prepared by deposition-precipitation with NaOH (DPN) (~3 wt%) and urea (DPU) (~8 wt%) were tested in crotonaldehyde hydrogenation at atmospheric pressure. There is no differences in

    Oct 1, 2003