Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    A Novel AG-Crusher-HPGR Circuit for Hard, Weathered Ores Containing Clays

    By P. P. Rosario

    A research project was conducted at the University of British Columbia (UBC) resulting in the development and evaluation of a novel comminution circuit incorporating autogenous grinding and parallel t

    Jan 1, 2012

  • CIM
    Economics of Slag Heat Recovery from Ferronickel Slags

    By L. Rodd, C. Walker, T. Koehler

    "The energy content of slag represents approximately 80% of the total energy inputs to a laterite nickel electric smelting furnace. Conventional slag handling methods produce only low grade heat and t

    Jan 1, 2010

  • CIM
    Geology and setting of the Red Mountain gold-silver deposits, northwestern British Columbia

    By D. A. Rhys, M. Sieb, M. A. Prefontaine, C. L. Swanson, S. R. Frostad, H. Q. Smit

    "Gold-silver mineralization at Red Mountain (1992 resource of 2.5 million tonnes grading 12.8 g/t Au and 38.1 g/t Ag) occurs within several discrete zones within a folded sequence of Middle to Late Tr

    Jan 1, 1995

  • CIM
    Process Mineralogy of Copper and Lead Concentrates: Uncertainties and Metallurgical Decisions

    By Mostafa Benzaazoua, Emilie Ré, Raphaël Mermillod-Blondin, Hassan Bouzahzah, Jean-François Wilhelmy, University of Québec in Abitibi-Témiscamingue

    "We analyzed two copper and lead flotation concentrates from the LaRonde mill using MLA technology (Mineral Liberation Analyzer) to identify the contaminants and to quantify their size and liberation.

    Jan 1, 2016

  • CIM
    Full-Face Boring by the Undercutting Method

    By P. O. Sandstrom

    "Atlas Copco is introducing a new patented method for full-face boring. This paper presents the basic principles of the boring action and discusses the present experience regarding performance and cos

    Jan 1, 1971

  • CIM
    Automatic Object Recognition and Registration of Dynamic Construction Equipment from A 3D Point Cloud

    By Mengmeng Gai

    This paper introduces a model-based automatic object recognition and registration framework to assist heavy equipment operators in rapidly perceiving 3D working environment at dynamic construction sit

    Aug 1, 2013

  • CIM
    Agile Process Development and Early use of Solvent Extraction in the Mining Industry

    By Nick Hazen

    Many successful actions are required to bring a profitable extractive metallurgical operation into production. Competent process development performed within the project development schedule increases

    Jan 1, 2014

  • CIM
    Column flotation circuit design at Les Mines Selbaie

    By H. Soto, P. Lacombe, R. del Villar

    "During the summer of1989, Les Mines Selbaie, with the cooperation of Université Laval initiated a research project to evaluate the column flotation technology for its concentrator near Joutel, Quebec

    Jan 1, 1993

  • CIM
    Progress in the control of underground diesel emissions

    By A. Lawson

    "Continued and expanded use of underground diesel-powered equipment is considered desirable in order to achieve necessary production capability, particularly when coal becomes increasingly in demand a

    Jan 1, 1981

  • CIM
    Applicability of Air Curtains as Air Stoppings and Flow Regulators in Mine Ventilation

    By G. Grassmück

    The question of whether the air curtain principle could be used under conditions prevailing in Canadian metal mines was investigated. A vertical, portable BERRY air curtain was tested, at first in a w

    Jan 1, 1969

  • CIM
    Gold Exploration in the Timmins District Using Field and Lithogeochemical Characteristics of Carbonate Alteration Zones

    By J. H. Crocket, J. Andy Fyon

    "All gold deposits within the Tisdale Group are spatially associated with carbonate alteration zones; however, not all carbonate alteration zones are host to gold mineralization.Within the komatiitic

    Jan 1, 1982

  • CIM
    One Hundred Years of Cyanidation

    By Fathi Habashi

    The year 1987 marked the centennial of the beginning of modern hydrometallurgy. On October 19, 1887 British Patent No. 14174 entitled Process of Obtaining Gold and Silver from Ores was issued*. The di

    Jan 1, 1999

  • CIM
    Metallurgical Flowsheet Development for the Gakara High Grade Rare Earth Deposit

    By R. Amata

    "The Gakara Rare Earth deposit in Burundi (East Africa) is unique for its high grade (e.g., 54.3% TREO on average) and low uranium and thorium levels. The majority of the light rare earth (RE) element

    Jan 1, 2016

  • CIM
    On the Distribution of Fractures in an Oil Pay

    By Adrian E. Scheidegger

    "AbstractThe possibilities of deriving pertinent information about fractures in an oil pay from data obtained by core analysis are investigated. It is shown that it is possible to obtain an estimate o

    Jan 1, 1955

  • CIM
    The Sherwood Process for Continuous Steelmaking

    By W. L. Sherwood

    Present conventional techniques for primary steelmaking in both integrated and non-integrated plants are outlined. 'Direct reduction' alternatives are reviewed and categorized according to the nature

    Jan 1, 1968

  • CIM
    Geotechnical monitoring of tunnel boring machine drivages at the Donkin-Morien Mine, Nova Scotia

    By T. R. C. Aston, C. M. K. Yuen, J. L. Gilby

    "The access tunnels for the Donkin-Morien Mine in Cape Breton, Nova Scotia, comprise two parallel tunnels driven through a sedimentary sequence of sandstone, siltstone and mudstone to intersect the Ha

    Jan 1, 1988

  • CIM
    Cannon Mine's B-Neath zone – exploration through production

    By J. J. Baz-Dresch

    "The Cannon Mine, a joint venture between Asamera Minerals (the operator) and Breakwater Resources, is located in the centre of Washington state at the eastern base of the Cascade Mountains. The mine

    Jan 1, 1990

  • CIM
    Building A Business Case for Acid Prevention

    By T. D. Chatwin

    Acid rock drainage (ARD) is one of the most serious and potentially enduring environmental problems of the mining industry. High liability costs carried by many mining companies to cover potential obl

    Jan 1, 2011

  • CIM
    Processing History at Vale Canada’s (Inco’s) Nickel-Copper Smelter at Copper Cliff, Ontario: Post-1950

    ABSTRACT It is critical that historical processes and concomitant exposures to specific nickel substances be understood because some diseases linked to inhalation of certain nickel-containing substanc

    Jan 1, 2013

  • CIM
    Time Domain Reflectometry Measurements of Oil Sands Tailings Water Content: A Study of Influencing Parameters

    By A. R. Sorta, D. C. Sego

    ABSTRACT Temperature, solute, texture, and thixotropic effects on time domain reflectometry (TDR) measurements of water content in oil sands tailings are investigated. Results indicate that TDR water

    Jan 1, 2013