Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Towards Formalizing Qualitative Operations Input Data into Mine Planning (2dcf5f47-b85e-490f-8b96-c37606eb1d7d)

    By T. G. Joseph

    Mines must manage variability from within their operations as well as those imposed upon them by external forces. This paper provides a framework to manage both internal and external variability throu

    Nov 1, 2011

  • CIM
    Status of Repairs on Two Grinding Mills At Holt-McDermott

    By Pierre Beaudoin

    "This paper deals with the repairs made on two damaged mills. It investigates briefly the causes of the damage, explain its nature and the design of the repair. It explains the detrimental effect on o

    Jan 1, 2001

  • CIM
    Optimizing Grinding Circuits

    By James Anstey

    BHP Billiton?s Cannington facility is a mining and minerals processing plant near Mt. Isa in Central Queensland, Australia, producing silver, lead and zinc. Mine ore is processed in a concentrator, wh

    Apr 1, 2005

  • CIM
    The Red Dog VIP Mill Optimization Project A Study in Fast-Track Project Execution and Alliance Contracting (5aae1f12-06e2-4656-a27b-a608072456ab)

    By George H. Hope, Steve Ciccone

    "The Red Dog Mine is both the largest known zinc reserve and the largest zinc producer in the world. The mine started in 1989, and by 1999 had increased production from approximately 300,000 tonnes pe

    Jan 1, 2003

  • CIM
    New System Architecture and Communication Concepts for Automated Underground Machinery

    By Christoph Mueller

    Mining operations today are characterized by a high degree of mechanization and single machine automation. However, their potential for cost cuttings and increase of productivity in the future is quit

    May 1, 2006

  • CIM
    Fundamental Study of Reactive Oily Bubbles in Sulphide Flotation

    By Carolyn Kenney, Jianjun Liu, Zhenghe Xu

    "The flotation of fine particles has been a challenge to scientists and engineers in mineral processing. A novel concept of reactive oily-bubbles as carrier to float fine particles is described in thi

    Jan 1, 2003

  • CIM
    Cone Crusher Operaitonal Variables

    By A. J. Magerowski

    Energy consumption is a main component of operational costs for the comminution of mineral bearing ores. Reduction of energy consumption has continually been addressed by mill operators and equipment

    Jan 1, 1986

  • CIM
    The Post-Failure Characteristics of Rock - Pt 1: Intact and Broken Rock

    By T. G. Joseph

    A strain-softening constitutive relationship is introduced that describes the post-failure stress-strain curve for rock regardless of whether the rock is intact or broken. The core of this relationshi

    May 1, 2002

  • CIM
    Innovative Partnerships that Improve IT Support for Mine Planning and Management Processes

    By Rick Moignard

    Relationships between Information Technology providers and their clients are often segmented according to job specific tasks. As a consequence, technology providers tend to focus on automating repetit

    May 1, 2006

  • CIM
    Transforming Flow Sheet Design with Inert Grinding – the IsaMill

    By K. E. Barnes

    "The IsaMill was developed for fine-grained ores that required at least double the grinding efficiency of ball or tower milling to be economic. This was achieved, but in practice, the benefits of usin

    Jan 1, 2006

  • CIM
    Stereolithography—a rapid prototyping technique for orebody modelling and mine design

    By A. Akerman, C. P. O’Connor, N. Vayenas

    "Stereolithography is a well-known rapid prototyping technique in the manufacturing sector. Essentially, it is a three-dimensional printing process that produces plastic prototype parts from standard

    Jan 1, 2006

  • CIM
    UNIFLOT SP129 - Copper Sulphide Collector

    By S. Auger, S. McDonald, K. Ward

    "This preliminary paper provides a summary of lab and mill flotation investigations into the copper collector at two Canadian operations. The orebodies illustrated in these studies both contain mainly

    Jan 1, 1992

  • CIM
    Frozen Lump Generation of Oil Sands ? Climatic Challenges and Solutions

    By Derek J. Cyr

    Climate has an immense impact on the properties of Athabasca oil sands and the ease or difficulty with which it is excavated and extracted. During the winter months, exposed oil sands surfaces freeze.

    May 1, 2004

  • CIM
    Grinding Circuit Design for Adanac Moly Corp using a Geometallurgical Approach

    By Dave Bulled

    "This paper describes the design of an SABC grinding circuit using CEET technology applied to grindability data produced from testing 100 samples and distributed across the blocks of a mine plan using

    Jan 1, 2007

  • CIM
    Predicting the penetration rate of percussive blasthole drills using coarseness index and median particle size

    By S. Kahraman, K. Develi, E. Yasar

    Four hydraulic top hammers, one pneumatic top hammer, and three down-the-hole drills were observed in several rock types at quarries and highway construction sites to measure the performance data. At

    Jan 1, 2004

  • CIM
    The Strength and Flow Performance of Glassfill Technology

    By Euler De Souza

    Backfilling in Canadian mines has been practised for close to 100 years and evidence anticipates the application of mine fill technology at an increasing rate during the foreseeable future. The evolut

    Apr 1, 2005

  • CIM
    Gold "Preg-Robbing" by Pyrite: Natural and Process Induced

    By Stephen L. Chryssoulis

    """Preg-robbing"" of gold by carbonaceous matter during the cyanidation of certain types of carbonaceous gold ores is well documented. Recent studies established that ""preg-robbing"" of gold is not l

    Jan 1, 1997

  • CIM
    Sustainable standards for the mining and metallurgical industry of the 21st century

    By D. J. Kemp

    The 20th century saw changes in the mining and metallurgical industry not only technically but also in social and environmental expectations. As projects continue to become larger their visibility rai

    Jan 1, 2005

  • CIM
    Integrated Grinding and Flotation Simulations for the Improvement of Circuit Performance at BHP-Billiton’s Minera Escondida

    By H. E. Urtubia, C. W. Bailey

    "BHP-Billiton’s Minera Escondida Limitada is one of the world’s largest copper producers. It treats a combined 88 million tons of copper ore per year through its two concentrators: Los Colorados and L

    Jan 1, 2007

  • CIM
    The Systematic Reclamation of Gold Mine Tailings

    By Jean-Claude LeRoy, Herman Keller

    "INTRODUCTIONEROCON's work is the reclamation of mine wastelands. It has had considerable experience in particular in the reclamation of gold mine tailings in the Canadian Shield since the latter part

    Jan 1, 1975