Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The Role of Phytoextraction in Mine Waste ManagementBotanical exploration has identified many plant species that naturally accumulate very high concentrations of elements, particularly heavy metals. The enormous potential applications of some of these
Jan 1, 2002
-
Performance of Cover System Field Trials for Waste Rock at Myra Falls OperationsBy S Januszewski and, G Dirom, D Christensen
Four field test plots were constructed in 1998 on a sloped waste rock surface at the Myra Falls Operations of Boliden Westmin (Canada) Limited to evaluate hydraulic performance of alternate cover syst
Jan 1, 2003
-
Piling and Raise Bore Construction – Key Learnings from a Client’s PerspectiveBy R Austerberry, S Green
Highly weathered ground, limited collar options and the need to achieve a desired outcome at the lowest possible cost led to the need to adopt a construction approach that had no established design me
Mar 24, 2014
-
Unique Experience of Controlling Active Spontaneous Heating in the Working BG Panel Goaf at GDK 8 Incline, RG-II Area ù A Case StudyBy B Veera Reddy
For thick seam extraction, the Blasting Gallery (BG) method is ideal for obtaining the maximum percentage of extraction at fast rates. The continued use of this mining method is threatened by strata c
Jan 1, 2005
-
An Integrated Approach to Evaluation of Blasts - A Case StudyBy Chung S
The problems associated with equating calculated and measured properties of explosives with blast results are examined. The results from six full-scale test blasts in a limestone quarry are describe
Jan 1, 1990
-
Chalcopyrite Flotation and Liberation Characteristics Before and After Autogenous Grinding at Mount Isa Mines LimitedBy Espinosa-Gomez R, Johnson NW
The Copper Concentrator at Mount Isa Mines Limited treats on average 18 000 tonnes/day of chalcopyrite ore containing typically three per cent copper. The main gangue minerals are iron sulphides (-1
Jan 1, 1993
-
The Evaluation of the Mining Aspects of Coal ProjectsThe basic model for the evaluation of any coal-bearing property is the cash flow projection, the major components of which are operating costs, capital charges, taxation and revenue. A range of cash
Jan 1, 1975
-
Why do Shareholders and Mining Executives Allow Mine Managers to Leave Behind High-Grade Broken Ore Underground?By K Biegaj
The paper describes challenges the author has encountered on Australian underground gold and nickel mines over the last eight years, when recovering high-grade gold/nickel bearing mine floor material
Mar 26, 2012
-
Resource Classification ù A Case Study From the Joffre Hosted Iron Ore of BHP Billiton Æs Mt Whaleback OperationsIt is recognised by the current JORC (1999) code that resource classification involves the interaction of numerous qualitative and quantitative criteria such as data quality, geological continuity and
Jan 1, 2002
-
Underground Mobile CrushersBy Tukkimies M
During the late-1980s crawler-mounted crusher units established their position in the aggregates industry. Between 1986 and 1994 about 700 units were delivered to customers all over the world for s
Jan 1, 1995
-
Staff Development and Training at Geita Gold Mine, TanzaniaBy C Kusi-Manu, E Nyamusika
Geita Gold Mining Limited (GGML) is owned and jointly managed by Ashanti Goldfields Company (Ghana) and Anglogold (South Africa). The mine is currently one of the largest gold producing open pit opera
Jan 1, 2003
-
A Case Study in Optimising FragmentationBy R Crookes
Mine to mill optimisation is not a recently developed concept. It is one which is finally gaining greater acceptance in the Australian mining industry, possibly as a consequence of the downturn in mar
Jan 1, 1999
-
A Review of the Kapit Orebody, Lihir Island Group, Papua New GuineaBy J R. Robinson
Prior to mine development, exploration drilling within the Luise Caldera on Niolam Island encountered gold mineralisation to the northwest of the main Minifie and Lienetz orebodies. This mineralisatio
Jan 1, 2004
-
Assessing New Airflow Requirements at the Meikle Mine ù A Case for an Additional Main Centrifugal Fan and the Inclusion of Evaporative Cooling Spray Chambers for Airflow Quality ImprovementVentilation challenges are often encountered when an underground mine expands to new zones and it often is the case to make a thorough review of the existing system and assess immediate and future air
Jan 1, 2005
-
Pit Slope Management ù Planning for Your Next Failure in Open Cut MiningIt is often assumed that geotechnical investigations or studies for open pit mines are confined to providing a slope design. However in an operating mine, the design is only one component of a mine ge
Jan 1, 2003
-
Plant and Process Design Improvements to Increase the Efficiency of Nickel Reduction at QNIBy R Piper
The Yabulu Nickel Refinery commissioned in 1974, processes lateritic ore via a modified Caron process to produce high quality nickel and cobalt products. The Greenvale orebody provided the sole source
Jan 1, 2002
-
Reduction of the Blast Exclusion Zone at the Black Star Open Cut MineBy J Moncrieff, P Bellairs
The Black Star Open Cut is located immediately adjacent to the township of Mt Isa and is situated in the middle of extensive pre-existing infrastructure including two concentrators, two smelters, a we
Jan 1, 2007
-
New Value in Old Data - Three-Dimensional Modelling of Historical Mine RecordsBy M Matheson
Increasingly, owners and operators of underground mines that have a long history are realising the economic and practical advantages of capturing historic mining records and converting hand drafted pl
Jan 1, 2009
-
Reporting Standards ù The USA Experience Achieving True Globalisation ù Problems and SolutionsThe United StatesÆ reporting standard for the mining industry for securities purposes is contained in the Security and Exchange CommissionÆs Industry Guide 7. It defines proven and probable Reserves u
Jan 1, 2002
-
A review of floor heave mechanisms in underground coal mine roadwaysBy H Ramandi, H Masoumi, I Canbulat, B Hebblewhite, J Oh, S Saydam, W Timms, S Mo
This paper reviews the floor heave mechanisms in underground coal mine roadways. Previous studies have reported three main failure mechanisms: bearing capacity failure, buckling and swelling. The buck
Nov 30, 2018