Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Real time phosphorus analysis using GEOSCAN on belt analysers at Assmang Khumani Mine in the Northern Cape

    By L A. Balzan, F Nieuwenhuys

    GEOSCAN on belt analysers have been widely utilised in iron ore for nearly two decades. Since the first installations in 2003, the availability of accurate and reliable grade data has become standardi

    Nov 8, 2021

  • AUSIMM
    What category cyclone is devastating your plant?

    By T G. Vizcarra, B Wong

    Optimisation projects are regularly undertaken without knowing the root cause of an issue. It is all well and good to trial a multitude of flotation reagents, change the operating characteristics of y

    Aug 29, 2018

  • AUSIMM
    Production at Lift 530 m of Tongkuangyu Copper Mine

    By K W. Bian, Y M. Liu

    Tongkuangyu Copper Mine is currently the only mine in China employing block caving. It comprises two large orebodies known as the No 4 orebody and the No 5 orebody. They are approximately 50° in

    May 9, 2016

  • AUSIMM
    Unmanned aerial vehicle observation technology of coal mininginduced surface movement and fissures

    By J Zhang, B Wei, T Zhao, K Wang

    Understanding mining-induced surface movement and fissures is critical for environmental protection and geological prevention. In this study, image recognition algorithms, satellite remote sensing and

    Sep 1, 2024

  • AUSIMM
    Aren't You Too Young to be a Consultant?

    Many young mining engineers do not consider consulting as a possible job, believing that many years of working on-site is required to achieve practical experience, develop expertise and acquire indust

    Jan 1, 2009

  • AUSIMM
    Recent Advances in Iron Ore Sintering

    By O Ishiyama, L Lu

    Sintering is the most economic and widely used agglomeration process to prepare iron ore fines for blast furnace use. Due to the depleting reserves of traditional high-grade iron ore, there have been

    Jul 13, 2015

  • AUSIMM
    Interactive Modelling and Visualisation of Large Deposits Using Linear Octrees

    Large deposits present computational challenges to todayÆs commercial orebody modelling systems that are based on conventional block models. We describe a system that is specifically engineered to mod

    Sep 26, 2011

  • AUSIMM
    Monitoring Haul Truck Operator Fatigue Using Gyroscope Data

    By L van Latum, A Koh, I Thomas

    Haul truck drivers are at a high risk of developing fatigue due to the monotonous nature of the work and demanding shift rosters. In the mining industry, fatigue is identified as a major contributing

    Sep 26, 2011

  • AUSIMM
    The Path to Best Practice at Geita Gold Mine

    By M Monaghan, B S. Gregory

    The Geita Gold Mine is located 80 km southwest of the town of Mwanza in the north-west of Tanzania and is 100 per cent owned by AngloGold Ashanti Limited. Open pit mining commenced at Geita in 2000. I

    Sep 18, 2012

  • AUSIMM
    CIP ù Who Needs It? A Combination Circuit of Gravity, Flotation and Intensive Leach May Provide the Optimal Environmental and Cost Outcome for Gold Plants ù Stage II ù Results

    By A McCallum, J Abols, G Patrick, G Johansen

    The authors challenge the traditional thinking that whole ore cyanidation followed by Carbon in Pulp (CIP) or Carbon in Leach (CIL) should be applied as a standard process in the majority of gold proc

    Jan 1, 2004

  • AUSIMM
    From mines to lungs – navigating the landscape of respirable dust characterisation

    By D I. Cliff, K Johnstone, N LaBranche

    The resurgence of silicosis and coal worker’s pneumoconiosis (CWP) in mining and the recent ban of engineered stone products underscore the need to comprehensively address mineral dust exposures and t

    Apr 16, 2024

  • AUSIMM
    Best practice in Multiple Indicator Kriging (MIK) – importance of post-processing and comparison with Localised Uniform Conditioning (LUC)

    By G Zhang, I Glacken

    Multiple indicator kriging (MIK) has been used in the minerals industry for some decades. As one of the non-linear estimation methodologies, MIK has advantages related to resolving multiple or mixed p

    May 24, 2023

  • AUSIMM
    Preventing unwanted events critical controls – success and failure in implementing the ICMM guidance

    By A P. Wilkinson

    This paper reports on the implementation of the critical control concept to manage material risks in the mining and metals industries. The critical control management (CCM) approach assumes it is bett

    Apr 16, 2024

  • AUSIMM
    Secondary Copper Processing using Outotec Ausmelt TSL Technology

    By J Wood

    Steady depletion of the world’s primary copper reserves coupled with a meteoric rise in electronic waste (e-waste) generation has led to secondary copper processing assuming an ever-increasing importa

    Aug 8, 2011

  • AUSIMM
    A Phased Approach to Test Programs to Meet Feasibility Study Requirements

    By E Williams

    The role and importance of a well designed test work program during the development of an orebody is often underestimated. A test work program should be tailored to deliver very specific answers to re

    Oct 5, 2011

  • AUSIMM
    Float it, Clean it, Depress it – Consolidating the Separation Stages at Clarabelle Mill

    By V Lawson

    Vale’s Sudbury Clarabelle Mill processes Cu/Ni ores from a number of mines in the Sudbury basin in Ontario, Canada. Bulk sulphide flotation produces a copper-nickel concentrate with pyrrhotite as the

    Aug 8, 2011

  • AUSIMM
    Dilution optimisation in sublevel open stoping operations

    By A Vakili

    Dilution is associated with considerable direct and indirect costs in underground open stoping operations. As shown in previous works, an improved ability to predict dilution enables the economic risk

    Mar 29, 2023

  • AUSIMM
    Solid bowl decanter centrifuges – the alternative technology

    By M Player, R Klug, N Schwarz

    There are several technologies available for thickening and dewatering of mining process slurries. The most commonly used are thickeners and filters, but technological developments have made solid bow

    Jul 1, 2021

  • AUSIMM
    Western Ring Route – Waterview Connection: Calculation of Ground Settlements and their Effects

    By J P. Burr

    The Waterview Connection will complete a strategic Auckland motorway route linking the south, west and north. The project will include 2.1 km of ‘undrained’ driven tunnels, 500 m of drained cut-and-co

    Mar 8, 2011

  • AUSIMM
    Development of a Cover System Design for Potentially Acid-Forming Tailings at Peak Gold Mines

    By M, C Silveira, C Ellice, D Christensen

    Peak Gold Mines (PGM), a member of the Rio Tinto Group, is an underground and open cut gold mining operation located near Cobar, NSW. A multi-phase study was initiated in 2001 in support of developing

    Jan 1, 2003