Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Transition of the Ernest Henry Mine from Open Pit to an Underground Sublevel CaveBy J B Tucker, A T. McGrath
Situated in north-west Queensland, Australia, the Ernest Henry Mine (EHM) has been producing copper and gold since 1996. Owned and operated by Glencore Xstrata, ore is currently sourced from a newly d
Mar 24, 2014
-
Management of riverine disposal of tailings and waste rock for AMD control at the Ok Tedi copper-gold mineBy S Davidge, J Pile, R Schumann, E Kepe, W Stewart, M Ridd, B Rathi
Geographical constraints, including steep terrain and high rainfall, at the Ok Tedi copper-gold mine in PNG’s Western Province present Ok Tedi Mining Limited (OTML) with significant challenges in mine
Aug 2, 2023
-
Discovery of the Corunna Downs DepositsBy P J. Howard, P Darvall, J H. Mainwaring
In less than a year, Atlas Iron’s Corunna Downs Project has moved from a new discovery to a substantial resource of high quality in an underexplored greenstone belt. Located approximately 170 km south
Jul 13, 2015
-
Meta incident analysis – an analysis of incident and near miss reporting within a major Australian commodity portBy A Fern, A Hawkes, o, W Smith, K Mee
Serious Injury and Fatality (SIF) prevention remains a priority focus within high-risk industries sector. A major mining operation sought to strengthen their approach to the management of high-risk ac
Apr 16, 2024
-
The Influence of Geology on Blasting Hazards and ResultsBy T N. Little
The aim of any rock breaking activity is to achieve success by developing designs that are blasting objective-specific and geology-specific, and then implementing such designs. This paper targets mini
Aug 22, 2011
-
An assessment of battery trolley systems’ performance in surface minesBy H Bao, M Nehring, M Kizil, P Knights
The mining sector, a notably energy-intensive industry worldwide, is a major consumer of fossil fuels, leading to significant carbon emissions globally. The move towards electrification, coupled with
Sep 1, 2024
-
Assessing Uncertainty with Drill Hole Spacing Studies – Applications to Mineral ResourcesBy H M. Parker, G Verly, T Postolski
Assessing the uncertainty and risk in mineral resource estimation is required for best practice and is implied by the public reporting codes in the categorisation of mineral resources and reserves. On
Nov 24, 2014
-
The Benefits of Automated Sampling and Analysis of Iron OreBy R Shaw, R Williamson
Global iron ore demand, sparked by ChinaÆs rapid industrialisation and emergence as the worldÆs newest steel market, has seen iron ore groups investing heavily in production capacity as well as infras
Jan 1, 2007
-
Monitoring Degradation of Coke within the Blast Furnace via Tuyere Coke SampleBHP Steel International's Newcastle blast. furnaces have operated since their caimissioning on cake based on local low rank coals. In the early 1960's Newcastle coke was believed to be t
Jan 1, 1987
-
The Amacan Copper ProjectThe Amacan Copper Project was constructed in the Philippines by a Finnish-Filipino Consortium during the years 1979 - 1982. The project involved a turnkey contract for a mine and a concentrator to
Jan 1, 1986
-
Direct Electrowinning of Lead from Lead Sulphide ConcentratesBy Siemon J. R
It is possible to use compacted anodes formed at low pressure for the direct electrowinning of lead from sulphide concentrates. An anode containing 5.5 per cent graphite, formed into a compact at 34 M
Jan 1, 1976
-
Twin Stacked Tunnels - KDB200, Kowloon Southern Link, Hong KongBy I P. W Chau
Construction of twin stacked railway tunnels through mixed ground conditions in the heavily populated urban environment of Hong Kong, including tunnelling in poor ground conditions, with low cover and
Jan 1, 2008
-
A Review of the Kensington Gold ProjectKensington is a joint venture between Echo Bay Mines and Coeur Alaska, a subsidiary of Coeur d'Alene Mines Corp. The venture is of equalparticipa- tion and is governed by a management committee
Jan 1, 1991
-
Density Separations in Heavy Inorganic Liquid SuspensionsBy Hall ST, Miles NJ
Recently an inorganic salt, sodium polytungstate (SPT), has become available that allows the preparation of non-toxic solutions of relative densities up to 3.1. It is relatively expensive and at th
Jan 1, 1993
-
The Effect of Aspect Ratio on the Grinding Efficiency of Open and Closed Circuit AG/SAG MillsThe aspect ratio (mill diameter/mill length) of autogenous and semi autogenous mills varies widely and can be as high as three or as low as 0.5. The literature on the subject of what effect aspect rat
Jan 1, 2007
-
The Rapid Determination of Carbon Dioxide in Coal Mine Roadway Dust SamplesBy Belcher C. B
A simple gravimetric procedure was developed for the rapid determination of carbon dioxide in coal mine roadway dust samples and the result is used for the subsequent calculation of incombustible matt
Jan 1, 1976
-
Mine Waste Cover System Design ù Linking Predicted Performance to Groundwater and Surface Water ImpactsBy C Wels
Current best management practice requires the placement of a cover onto most types of mine waste including tailings, waste rock and/or spent heap leach rock at closure of the mine. The objectives of a
Jan 1, 2003
-
Ion Exchange in Hydrometallurgy - Secondary Metal Removal or Primary Production Technique?By J D. Illescas, S N. Arnold, D R. Shaw
Ion exchange (IX) as a primary production technique has been applied commercially since the 1950s; its application in the uranium industry continues to be widespread and is utilised to a lesser degree
Oct 29, 2012
-
Shear strength of compacted clay liner at McArthur River MineBy Y Xu, J Hacker, D J. Williams
Shear strength parameters of compacted clay liners are needed to analyse the stability of mine waste dumps containing compacted clay liners as sealing layers for potentially acid forming waste rock. A
Jul 23, 2018
-
Design of Segmental Lining for Waterview Project, Auckland, New?ZealandBy S Pradhan, A Kuras, R Mahajan
This paper describes the design of the precast concrete segmental lining for the 13.1 m internal diameter and 450 mm thick, 2.4 km long mainline tunnels for the Waterview Connection project in Aucklan
Sep 17, 2014