Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Learning from and managing a significant saprolite instability

    By M Bouare, C Holland, K N’Diaye

    Two adjacent open pits in Mali hosted by deeply weathered saprolitic materials were mined consecutively over the course of approximately 12 months. During excavation, both pits experienced significant

    Jun 22, 2022

  • AUSIMM
    Augusta Gold-Antimony Mine

    By S Marshall, A Fowler

    The Augusta underground mine at Costerfield in Central Victoria has been in operation since mid 2006; however, AGD Operations Pty Ltd have explored and undertaken open pit operations in the area for o

    Jan 1, 2008

  • AUSIMM
    Deck hands needed! Experience necessary – addressing the impending qualified tailings professional resource shortage

    By K J. Ward, C N. Hatton, J Scalia IV, C A. Bareither, D L. Spencer

    The mining industry is experiencing change in the governance of tailings facilities (TFs). Guidance and regulations across many jurisdictions contribute to this amorphous change. The Canadian Dam Asso

    Jul 1, 2021

  • AUSIMM
    Drill hole spacing analysis for classification and cost optimisation – a critical review of techniques

    By J Levett, O Rondon, I Glacken

    Reporting Codes are not prescriptive on methodologies to report or classify Mineral Resource Estimation results, but the assessment of risk and uncertainty is required, and is likely to be increasingl

    May 24, 2023

  • AUSIMM
    Development of a remotely operated robotic mechanism for accessing and removal of metal tramp from primary gyratory crushers

    By H Lemos, E Nunes, D Jacobson, R Costa, L Ono, A Alves, H Delboni Jr

    Oversize rock breaking and metal tramp removal are key issues for reducing primary crusher downtime, as well as improving the safety associated with its operation. Remote operation of such tasks would

    Nov 8, 2021

  • AUSIMM
    Durability Planning for Underground Infrastructure

    By D Wimpenny

    Underground infrastructure is often a critical component of transportation and utility schemes. It is characterised by long design lives with limited access for inspection and maintenance. The exposur

    Mar 8, 2011

  • AUSIMM
    Jacked Box Versus Cut and Cover Technique for the Pedestrian Underpass Construction in Brisbane

    By A Purwodihardjo

    Evaluation of the construction method used for the pedestrian underpass construction at Ipswich Road, Brisbane, Australia is presented in this paper. The pedestrian underpass was constructed through t

    Mar 8, 2011

  • AUSIMM
    Increased productivity using theory of constraints at the Argyle Diamond Mine

    By B Murphy, N Strong, J Albrecht

    Rio Tinto’s Argyle Diamond Mine has a history of underperformance with delivery of ore from the underground operation to the surface for processing with no real clarity in sources of loss and value. I

    Mar 15, 2021

  • AUSIMM
    Optimisation of the Prominent Hill Flotation Circuit

    By P Woodward, T Ly, N Muhamad

    OZ Minerals' Prominent Hill copper-gold concentrator is located 650 km north-west of Adelaide in the Gawler Craton of South Australia. The concentrator was built in 2008 and commenced commercial

    Jul 15, 2013

  • AUSIMM
    Preliminary Design for the Rockwater Power Project, South Island, New Zealand

    By H Asche

    The proposed Rockwater Power Project is a hydropower development on the Waitaki River in the South Island of New Zealand. The proposed development will have an installed capacity of 250 MW with a peak

    Mar 8, 2011

  • AUSIMM
    Pastefill - A Multi-Disciplined Review of Barrick Gold Corporation's Pastefill Operations in Australia

    During 2009 the technical services staff at Barrick Gold Corporation's Australian Business Unit conducted a review of their five underground mines that utilise pastefill as the backfill component

    Nov 25, 2010

  • AUSIMM
    Optimised drill targeting using dynamic 3D modelling, Martabe Gold Mine, Indonesia

    By H Indirawati, R Ayres, A Nur Kasnanto, S Konopa

    As a project moves through the mine life cycle, the quantity of data available increases and the understanding of the orebody matures. Incorporating new information quickly and efficiently in current

    Nov 21, 2018

  • AUSIMM
    Thin Spray-on Liner Concepts and Practical Examples of the Non-Reactive System - MEYCO TSL 865

    TSL Concepts and Practical Examples of the Non-Reactive System - Meyco TSL 865 Thin Spray-on Liners (TSLs) have been intensively investigated by mining and chemical industries within the last decade.

    Nov 25, 2010

  • AUSIMM
    Rock Strength Anisotropy and Its Importance in Underground Geotechnical Design

    By M Sandy, A Vakili, J Albrecht

    Although rock strength anisotropy is a well-known phenomenon in rock mechanics, its impact on geotechnical design is often ignored. No widely accepted guideline currently exists for its characterisati

    Nov 5, 2014

  • AUSIMM
    Transient slag behaviour in the Direct Reduced Iron (DRI) and scrapbased Electric Arc Furnace (EAF) process – case study for high and low-grade DRI input

    By S K. Panda, M A. Van Ende, S Chatterjee

    Tata Steel Netherlands (TSN) aims to reduce its CO2 emissions by 35–40 per cent by 2030 and become CO2 neutral by 2045. A first step to reach these targets is via the utilisation of an Electric Arc Fu

    Jun 19, 2024

  • AUSIMM
    Operational deployment of sensor technologies for bulk ore sorting at Mogalakwena PGE Mine

    By J Rutter, J du Plessis, er, M Scott, D Alex

    It is generally acknowledged that bulk ore sorting is an attractive prospect for the mining industry. However, uncertainties relating to the operational performance of sensor technologies, the grade h

    Nov 10, 2020

  • AUSIMM
    Martabe Gold Mine, Indonesia: a positive solution for positive reconciliation

    By M Angus, S Konopa, A Virisheff, S Crispin

    A positive mill reconciliation at a mine is a double-edged-sword. Much back slapping happens. The bank and the board can’t get enough until the downside becomes apparent. Over a prolonged period, ther

    Nov 21, 2018

  • AUSIMM
    Practical waste rock management at the Roy Hill iron ore mine, Western Australia

    By J Pearce, B Miles, V de San Miguel

    Incorporating industry best practice waste rock management methods can be a relatively straight forward task when preparing management documentation, such as an acid and metalliferous drainage managem

    Jul 25, 2018

  • AUSIMM
    Redefining Competent Persons Criteria for Resource Geologists

    By J Coombes

    There is much debate on the Competent Persons qualifying criteria for providing classified resource estimates for public reporting. The CRIRSCO family of codes including the JORC Code, SAMREC, PERC an

    Aug 18, 2014

  • AUSIMM
    Modelling Full-scale Blast Heave with Three-dimensional Distinct Elements and Parallel Processing

    By A Tawadrous, B Wheeler, D S. Preece, S A. Silling

    The two key results of rock blasting are fragmentation and movement of geomaterials. Movement/flow of the blasted rock is often referred to as heave. Moving rock with explosives rather than mechanical

    Aug 24, 2015