Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Information Systems in the Northern Territory Department of Mines and EnergyBy M Coleman
Information is a key ingredient for successful mineral exploration and development. Whether identifying potential exploration localities from a map, interpreting technical reports or searching a reg
Jan 1, 1994
-
Underground Information Technology Infrastructure - A Sound Basis for Efficient Future Mining OperationsBy M Schmid
German hard coal mining operations have decreased for more than 40 years. Current political decisions are leading to a discontinuation of subsidised black coal mining by the year 2018. This decision w
Jan 1, 2008
-
Recovery of Gold from Gravity Tailings by FlotationThe purpose of this study was to investigate the effectiveness of froth fl otation for the recovery of gold from the gravity tailing stream of the former Lihir Gold Limited (LGL) operation in Ballarat
Aug 1, 2010
-
Geotechnical behaviour of spent ore – impacts of metallurgical factorsBy R Rimmelin, C Vergara
Heap leach pads are composed of mined ore, usually crushed, disposed on liners to be processed with leach solutions, and the tail of the process is called “spent ore” which are then transported by con
Jul 23, 2018
-
Minerals Council of Australia Review of Tertiary Minerals Education ù What Does it Do for Minerals Education?Mining education in Ballarat has a long and proud history dating back to the 1870s. Today the School of Engineering continues this tradition at the University of Ballarat. The recent review of Tertiar
Jan 1, 2004
-
Bentonite and Fuller's Earth Deposits of New South Wales: II. Bonding PropertiesBy Giles C. N, Loughnan F. C
Bentonites and active earths from N.S.W., previously analysed with respect to occurrence, mineralogy and physical properties have been evaluated for use as bonding agents in quartzose moulding sands i
Jan 1, 1959
-
Copper/Cyanide in the Treatment of High Copper Gold OresBy Staunton W. P
The presence of cyanide soluble copper in gold ores can give rise to serious operational and economical difficulties in CIP and CIL operations. Cyanide consumption can result in the ore being uneco
Jan 1, 1991
-
Phase equilibria of Al2TiO5–Ti3O5 pseudobrookite solid solution in the Al2O3–TiOx system under various oxygen partial pressuresBy W Y. Kim, Y B. Kang, Y J. Park
The phase equilibria in the Al2O3–TiOx system were investigated in wide ranges of temperature and oxygen partial pressure: 1300~1600°C and 10-16.6~10-8 atm, respectively. The equilibrium phases and th
Aug 21, 2024
-
Investigation and Construction of Tunnels in Tamalia Limestone, Perth, Western AustraliaBy Klenowski G, Gilmour G. A
The Metropolitan Water Supply, Sewerage and Drainage Board, Perth, has recently con- structed two major sewerage tunnels in the metropolitan area and a further one is under construction. These tunne
Jan 1, 1981
-
The Fan Installation at Laleham CollieryUnderground mine ventilation is now com monly simulated on a digital computer. Such a programme, incorporating natural ventilation has been modified by others to account for methane emission and el
Jan 1, 1983
-
Four-Dimensional Network Relaxation Method for Long-Term Open Pit Mine SchedulingBy J Yamatomi, Y Tamanishi, S Miwa
The four-dimensional (4D) network relaxation method, originally developed by Akaike in 1999, uses Lagrange relaxation and is known for its ability to include the price change and possible better outpu
Sep 26, 2011
-
Geological and Geotechnical Characteristics of the Corridor Sands Deposits in MozambiqueBy H R. Pein
"The Corridor Sands deposit is situated approximately 190 km north east of Maputo, Mozambique adjacent to the paleo-mouth of the Limpopo River. This deposit is one of the worldÆs largest known economi
Jan 1, 2001
-
Integrated Planning, Mining and Rehabilitation for Effective Results and Sustainable Land Use - A Western United States PerspectiveBy V Pfannenstiel
The United States (US) coal mining industry has been working under comprehensive planning, operating and rehabilitation regulatory requirements for nearly 35 years. The public desire for environmental
Jul 10, 2012
-
Optimum Blasting? Is it Minimum Cost Per Broken Rock or Maximum Value Per Broken Rock?In most mining operations the ore undergoes several processes such as drilling, blasting, loading, hauling, crushing, grinding and liberation to become the final salable product. Drilling and blasting
Jan 1, 2001
-
Life Cycle Assessment and Tailings Management Trade-Off Studies - An Approach to ImplementationTailings management trade-off studies are done for all mining projects. There is wide variability in these studies as their approach, details and outcomes are determined by the experience and focus of
Jan 1, 2009
-
LPG Storage Cavern Blasting Techniques in Sydney SandstoneThe project is undertaken by Elgas Pty Ltd, a 50 per cent joint venture between AGL and BOC, to store 65 000 t of LPG in underground storage at Port Botany, NSW. The contractor, Concrete Constructions
Jan 1, 1999
-
Discrete Fracture Network Modelling – Importance of Accounting for Data Uncertainty and VariabilityBy S Rogers, D Stead, E Eberhardt
The last decade has seen a major increase in use of the discrete fracture network (DFN) approach applied to cave mining problems, often integrated within more complex geomechanical simulations. Becaus
May 9, 2016
-
Lihir Gold Five Years On ù Maximising Throughput and Capital UtilisationDuring the first five years of operation, the Lihir gold mine has steadily increased plant throughput rate to over 4 Mtpa, well above the original design capacity of 2.8 Mtpa. Understanding how future
Jan 1, 2003
-
Open Cut Mining Adjacent to Ephemeral Creek and Spring Systems ù Pilbara, Western AustraliaThe Pilbara region, located in the north-west of Western Australia, is significant as the second-largest source of iron ore on the planet. Iron ore mines owned and operated by Pilbara Iron are located
Jan 1, 2006
-
The Approval of a Gold Mine in the Solomon Islands ù Environmental Planning IssuesThe Gold Ridge Mine is an open-cut gold mine in the Solomon Islands. The mine is owned and operated by Gold Ridge Mining Limited, a wholly owned subsidiary of Ross Mining NL. At the invitation of the
Jan 1, 1999