Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Integrating Data, Applications and Users

    By McAuley T. J

    Computer software is an integral part of mining operations today with many sites using six or more software packages on a daily basis. However, the use of these different programs generates the need

    Jan 1, 1995

  • AUSIMM
    High-Grade Zinc in Industry

    FOR some years past it has been usual to specify high-grade copper for use for many purposes, but the practice of specifying zinc of a high degree of purity for certain purposes is of comparatively re

    Jan 1, 1923

  • AUSIMM
    Transport in Drifts and Shafts

    From depths of 400 - 600 m, coal is transported by a conveyor in a drift or a bulk winder in a shaft, whilst men and/or materials are transported by a slope hauler or a cage winder. Assessment of t

    Jan 1, 1976

  • AUSIMM
    The Design Of A Sand Pump For Optimum Results

    The design of a sand pump is similar in principle to that of a water pump but differs in several areas. Results of experiments on sand pump performance have been summarized and values of design par

    Jan 1, 1973

  • AUSIMM
    Rehabilitation of the Ardlethan Tin N.L. Concentrator

    The Ardlethan tin concentrator had dete riorated considerably in metallurgical per- formance, maintenance and plant availability. This problem was compounded by low tin prices and International Tin

    Jan 1, 1978

  • AUSIMM
    Metallurgical Operation at Gunpowder

    Gunpowder Copper Limited processes 1,000 tonne/day of Mammoth ore in a conventional flot- ation concentrator. Run of mine ore is prepared for flotation by three stages of crushing and two stages of

    Jan 1, 1974

  • AUSIMM
    Modified Open Cut Equipment in Underground Mining at King Island Scheelite

    By McLaughlin R. G, Brammer R. A J

    King Island Scheelite had been using dealer modified front end loaders for two years when in 1974 it started to increase production. Suppliers were then quoting long deliveries for underground die

    Jan 1, 1977

  • AUSIMM
    Operation of the Process Plant at Tolukuma

    This paper reviews the commissioning and operation of the process plant at Tolukuma over the past 18 months. The plant treats a high-grade gold and silver ore through a SAG mill followed by a conven

    Jan 1, 1997

  • AUSIMM
    Some Aspects of Technological Development in Aluminium Smelting

    The evolution of Hall process alumina reduction technology is des- cribed with particular attention to the pot lines. Future directions of tech- nological change are considered. It is predicted that

    Jan 1, 1982

  • AUSIMM
    Lead Purification by Crystallization and Reflux

    By Walters GW

    A countercurrent method of metal refining using crystallization and reflux is discussed. 4n account is given of the development of this technique for the separation of silver and bismuth from lead

    Jan 1, 1975

  • AUSIMM
    A Pyrolysis Approach to Refractory Gold Processing

    By Anylmore M, Walker A, Fletcher A

    Roasting of sulphide and sulph-arsenide gold ores produces unwanted emission of sulphur and arsenic oxides, and a less than complete recovery of gold. Pyrite loses sulphur and arsenopyrite loses ars

    Jan 1, 1992

  • AUSIMM
    Reconstruction Project Pechenganickel Combine Metallurgical Operations

    By B Lindqui, M V. Knyazev, L S. Tsemekhman

    Gipronickel Institute JS that is a Research and Development Centre affiliated to the worldclass Norilsk Nickel Mining and Metallurgical Company, and Outokumpu Technologies AB (Boliden Contech AB) have

    Jan 1, 2004

  • AUSIMM
    The Physical Structure of Cast Iron and Its Relation to Cupola Practice

    IT is very difficult for a founder engaged in jobbing work, comprising all sizes and classes of castings, to appreciate that the analysis of the iron he is using cannot entirely fill the situation he

    Jan 1, 1926

  • AUSIMM
    Overview of Ore and Coke Screening in the Ore Blending and Materials Handling Sections at Newcastle Steelworks

    Over the past 12 years screening of materials has undergone a dramatic change in both the types and materials used in screen mats and the quality requirements of the finished product. With the mai

    Jan 1, 1984

  • AUSIMM
    Opening Address (4fc0e779-316e-4db8-aaa5-252d75d83c07)

    Welcome to Mount Isa- my home city and without doubtthe base for what promises to be the most exciting mineral development yet seen in Australia.Mr. Chairman, it also gives me great pride to represent

    Jan 1, 1993

  • AUSIMM
    Direct Reduction of PbS with C and CaO Thermodynamics and Kinetics

    By Lee H. G, El-Rahaiby S. K

    The literature relating to reduction of sulphides by carbon using lime as sulphur-absorbent is reviewed. A stage-wise thermodynamic model is employed to evaluate the practical feasibility of the direc

    Jan 1, 1991

  • AUSIMM
    Explosives Performance - Who Needs to Know?

    The Australian bulk explosives industry has matured significantly over the last five years and it would appear that the rest of the world is following suit. This maturity is characterised by the te

    Jan 1, 1990

  • AUSIMM
    Paste Fill Operations and Research at Cannington Mine

    By R Rankine

    Backfilling with paste fill has been an integral component of open stoping at Cannington since commencement of operations. Efficient paste filling is critical to successful mining of the Cannington or

    Jan 1, 2005

  • AUSIMM
    Process Development of Victorian Brown Coal Liquefaction

    By Matsumura T, Takematsu T

    The Brown Coal Liquefaction Process (BCL Process) has been developed by Nippon Brown Coal Liquefaction Co., Ltd. (NBCL), and a 50-ton-per -day Pilot Plant has been partially completed and put into

    Jan 1, 1987

  • AUSIMM
    Servicing the Mining Industry - The Mt. Newman Experience

    To the layman or the casual in- vestor, the critical problems in the mining industry appear to rest on the questions of finding and developing an orebody. The high cost of finding a major orebody

    Jan 1, 1975