Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Reduction of Mechanical Entrainment by Polymer DepressantsBy Y Peng, D Wannas
In the fine particle flotation technologies being developed today the fine hydrophilic (gangue) particles are usually well dispersed. These highly dispersed fine particles can be recovered into the fl
Jan 1, 2005
-
The Use of Glass-Fibre Reinforced Plastic on the Northern Sewerage Project Stage 1 – Design and Construction ConsiderationsBy S Goff
The Northern Sewerage Project (NSP) is a $650 M infrastructure project that will increase the capacity of the sewerage system for Melbourne’s growing northern suburbs while also helping to protect the
Mar 8, 2011
-
Use of the Logical Framework Approach to Establish a Simple Sustainable Development Framework for Application to a Proposed Mine at Aurukun on Western Cape YorkThis paper describes the development of an approach to sustainable development for application at the feasibility study stage for a proposed bauxite mine near the community of Aurukun, south of Weipa
Jan 1, 2009
-
Development of a Pyrite Regrind Circuit at Telfer Gold MineBy D R. Seaman, Y Peng, F Burns, D J. Bradshaw
Telfer Gold Mine is a gold-copper mine in the eastern Pilbara of Western Australia, owned and operated by Newcrest Mining Limited. TelferÆs ores are processed by a dual train, 21 Mt/a, concentrator wh
Oct 29, 2012
-
Maximising asset value through optimal block by block decisions on marginal materialBy F Phillips, E Deucker, J Kato
It is challenging to determine the optimal mining strategy to maximise value when a mine plan includes mineralised material which does not meet the full cost of mining but has value exceeding the vari
Mar 15, 2021
-
Embedding Geometallurgy into Mine Planning Practices – Practical Examples at Olympic DamBy H Bruyn, K Ehrig, V Liebezeit, A Robertson, M Smith, D Grant
"The Olympic Dam geometallurgy program has generated a large quantity of data that has been used to create a geometallurgically enabled block model. An ongoing challenge is to convert data into usable
Jun 15, 2016
-
Management of High-pressure Groundwater in Underground Development at Ernest Henry MineBy T Purvis, J Calverd, A-K Greve
The Ernest Henry Mining (EHM) underground mine is situated adjacent to the Great Artesian Basin in North Queensland and within a fracture zone. Underground development commenced in February 2008 and h
Mar 24, 2014
-
Direct observation of the fayalite slag formation behaviour from large SiO2 grainsBy S Natsui, Y Goto, S Kawanishi, J Takahashi, H Nogami
The demand for copper increases yearly, and further improvements in copper smelting efficiency using flash furnaces are required. This study was conducted to understand and promote the interfacial rea
Jun 19, 2024
-
Using Dynamic Simulation Throughout a Process Plant's Life CycleUsing Dynamic Simulation Throughout a Process Plant's Life Cycle
Sep 13, 2010
-
Protection of Underground Mine Structures Due to Adjoining Open Pit Mine BlastingBy L S. Shekhawat, M P. Roy, R K. Paswan, P K. Singh, A Joshi
Blasting in the mining industry is being transformed, and can no longer be treated as an art or a practice purely dependent upon experiences of individuals. Examples of key drivers that have demanded
Aug 24, 2015
-
The Importance of Data Collection to the Blasting ProcessBy J Hutchings
An essential component to the management of any process is the measurement of key parameters, used to monitor, control, and provide the feedback necessary for improvement. This paper discusses how dat
Nov 8, 2011
-
Mining Network and the Security QuestionBy A Huebner, A Noack
Companies all over the world are very sensitive concerning their IT and network security. In most network connected technical installations and machines however, network security is not taken into acc
Sep 26, 2011
-
How economics drive the application of ore sortingBy W Kendall
Ore sorting has the potential to reduce the feed to wet plants and in the case of complex orebodies that can significantly reduce the water, energy and reagent consumptions and resulting operating cos
Nov 21, 2018
-
Maximising the value of a drilling program – case study in a challenging environmentBy A A. Latscha, D O’Connor
Increasing orebody complexity, restrictions in ground access, and longer lead times for disturbance approvals, have generated the need for the Resource Development Team within Rio Tinto Iron Ore (RTIO
May 24, 2023
-
Are Blasthole Samples that Bad and Reverse Circulation Samples that Good for Open Pit Grade Control? Story of a Trade-OffPast arguments advocating reverse circulation sampling against blasthole sampling are reviewed to present the debate under a different light. The advantages and disadvantages of each drilling method a
Mar 1, 2010
-
Projection of Ecological Restoration of Acid Mine Waste Rock of Shuilong Mountain at Dexing Copper MineBy L B. Zhou, Q Wang
The present discussion focuses on the developmental directions of eco-restoration of acid mine waste rock dump, by using acid mine waste rock of Shuilong Mountain as an example. Based on the analysis
Jul 10, 2012
-
Designing Energy Efficiency Assessments that Work - Thiess Australian Mining û Case StudyBy P Crittenden
Thiess Pty LtdÆs Australian Mining business unit used 7.6 PJ of energy in the 2007/2008 financial year. This represented more than 85 per cent of Thiess Pty LtdÆs total energy use and therefore meant
Jan 1, 2009
-
Overcoming the Challenges of Managing Tailings from Iron Ore Mining in Western AustraliaBy D R. Anstey
The growing demand for iron ore from Western Australia has led to an increased focus on the development of magnetite and lower grade iron ore deposits. The need to process and beneficiate the ore from
Jul 11, 2011
-
Phase relationship of quaternary system FeO-Al2O3-SiO2-‘V2O3’ at 1873 K and its impact during melting of H-DRI for possible vanadium extractionBy A Vickerfält, J Huss, J Martinsson
The European Union has listed vanadium (V) as one of the critical raw materials for the transition to a future green society, as stated in the Critical Raw Material Act, written by Grohol and Veeh (20
Aug 21, 2024
-
Resources and Reserve Assurance Processes – a Framework for Improved GovernanceBy L J. de Lange
As a material asset for mining entities, the resources and reserves (RR) estimation processes are surprisingly underrepresented in the assurance landscape. When press reports expose them being inaccur
Jun 22, 2016