    Coal: Development of Nsw's Major Energy Resource

    The Energy Authority of NSW has wide powers and responsibilities conferred by its Act which are pertinent to the State's coal industry and its development into the next century. With respect

    Jan 1, 1987

  • AUSIMM
    Challenges in Modelling Large Complex Orebodies at the George Fisher North Mine

    By M Haydon

    How do you portray a large structurally and stratigraphically complex deposit to return a meaningful resource estimation, and produce a geological model that is useable for planning on a daily basis?

    Jan 1, 2006

  • AUSIMM
    The Geology and Mineralisation of the Carina Iron Deposit, Yilgarn Mineral Field,Western Australia

    By J Lea, D C. Kettlewell

    The Carina iron ore deposit lies 105 km northeast of Southern Cross, WA. The area designated the Yilgarn Iron Ore Project (YIOP) is comprised of five prospects along an east-southeast trending greenst

    Jan 1, 2009

  • AUSIMM
    Microseismic Monitoring of Shear Zones and Related Seismic Activity at Broken Hill

    By G C. Reed, J M. Murray

    During more than 100 years continuous mining of the lead-zinc orebody at Broken Hill, an immense amount of geological data has been collected about shear zones related to the orebody. The challenge to

    Jan 1, 2000

  • AUSIMM
    Integrated Mine Waste Management – South Deposit Tailings Storage Facility, Savage River Mine, Tasmania

    By A Simmons, R Longey, D Brett

    The South Deposit Tailings Storage Facility (SDTSF), located at Grange Resources Pty Ltd’s (Grange) Savage River mine in north west Tasmania, has recently begun construction. The facility will provide

    Jul 27, 2015

  • AUSIMM
    Calibration of post blast gas simulation using mine site readings

    By F C. D Michelin

    Blast fumes are a significant health risk to underground workers, containing several dangerous gases such as carbon monoxide (CO), nitrogen oxides (NOx) and ammonia. To ensure safe working conditions,

    Oct 12, 2022

  • AUSIMM
    Eliminating Unidentified Misfires at Xstrata ZincÆs Open Pits Through the Application of Electronic Detonators

    By R Small, S Combrinck, R Lindsay

    Maintaining your competitive edge in the growing Australian mining sector today is an arduous task. With an ever increasing demand to extract more ore, safely, complete visibility throughout the blast

    Sep 18, 2012

  • AUSIMM
    Mining Scenario Analysis and Mine Variable Value

    By B E. Hall, J Poniewierski, A J. Hills

    Following a review of life-of-asset work at MMG’s Rosebery mine in which a proposal to increase production from 0.8 Mt/a to 1.2 Mt/a was mooted, questions were raised as to the seemingly arbitrary rea

    Mar 24, 2014

  • AUSIMM
    Automating Communications between Laboratories and Mines – A Case from the Coal Industry

    By S Mundell, J Armstrong, M Evans

    "Automation is a common goal within the coal industry for reasons such as efficiency, reliability and sustainability. However, it requires standards and frameworks so business systems can communicate

    Aug 18, 2014

  • AUSIMM
    Changing Restoration Priorities in the 21st Century – Opportunities for Novel Ecosystem Design in Mine Closure

    By P Audet, D Doley

    The mining industry often embraces mine closure criteria that require the reinstatement of predisturbance or even presettlement (ie historic) ecosystems. However, the extent and severity of disturbanc

    Jul 16, 2014

  • AUSIMM
    Boron removal through multistage refining treatment using CaO-SiO2- Al2O3 slag

    By K L. Avarmaa, M A. Rhamdhani, A D. P Putera, H T. B M Petrus, G A. Brooks

    Multistage slag treatment was carried out to investigate boron removal from metallurgical grade silicon. Boron is known to be one of the most difficult elements to remove from silicon. Depending on bo

    Aug 21, 2024

  • AUSIMM
    Initial Thoughts on Application of the Volume Loss Approach for Estimates of Surface Settlement Due to Tunnelling in Weathered Rock

    By S Kowalczuk, S V. L Barrett

    The potential for adverse surface settlement during tunnelling in soil and rock poses a significant risk to the successful completion of any tunnelling project. Undesirable ground movement may lead to

    Sep 17, 2014

  • AUSIMM
    Friction rock stabiliser QAQC and a process to investigate high pull test failure rates

    By R Varden

    Friction rock stabilisers, commonly termed ‘Split Sets’, friction rock bolts, or continuous friction coupled bolts are the most widely used rock bolt in the Australian underground metalliferous indust

    Mar 29, 2023

  • AUSIMM
    Agglomeration – The Key to Success for the Murrin Murrin Ni Laterite Heap Leach

    By D Readett

    The most critical variable in the successful establishment of the Murrin Murrin Heap Leach plant was the effective agglomeration of the Ni laterite ore. This paper describes the test work undertaken t

    Aug 8, 2011

  • AUSIMM
    Optimising flotation plant operation by using a digital twin in the control room

    By R Tooher, S J. Oliver

    The operation of copper flotation circuit is a challenging task for the site metallurgists and plant operators. To optimise the performance requires meeting both grade and recovery objectives. These p

    Aug 29, 2018

  • AUSIMM
    The Mt. Kare Project, Papua New Guinea: Exploration Update

    Madison Enterprises Corp. and Matu Mining are currently ex- ploring the Mt. Kare property in Papua New Guinea. The Mt. Kare gold prospect has had a short but very active history, since the first dis

    Jan 1, 1997

  • AUSIMM
    Vibration control blasting for low stability final walls

    By G Wyartt

    In the Pilbara region of Western Australia, an iron ore mine is undertaking a high wall cut-back to improve stability and allow access to deeper ore deposits. Several sections of the wall have been cl

    Nov 30, 2018

  • AUSIMM
    Methodology for Selecting Borehole Samples of Iron Ore for Mineral Processing Characterisation

    By G J. I dos Santos

    The risk assessment of mining projects is directly related to the possible failure in estimating, and as estimates are made from sampling results, this activity should be done in a judicious and plann

    Jul 11, 2011

  • AUSIMM
    Development of a cold bonding technology to high-grade iron ore concentrate

    By J Caron, M Athayde, F Lavoie, R Joyce

    Decarbonisation has become a major challenge for the global steelmaking industry, turning towards new technologies aimed at carbon footprint reduction, which on its own accounts for approximately 9 pe

    Nov 8, 2021

  • AUSIMM
    Evaluation of the impact of modifying froth launders in an industrial flotation bank using novel flotation models

    By A Yáñez, P Vallejos, R Grau, J Yianatos

    In flotation cells, especially in large flotation units, froth management is a crucial variable that should be considered during the design phase or optimised to improve the performance of existing fl

    Aug 24, 2022