    The 250 million ton per annum spatial digital twin

    By M Pomery

    BHP’s Western Australian Iron Ore Operations (WAIO) move approximately 250 million tons of ore per annum. The magnitude of the constant changes to the terrain models along with the diverse output and

    Sep 18, 2023

  • AUSIMM
    Internalising Ecological Costs in Evaluating and Planning a Mining Project

    By Q Wang

    Net present value (NPV) has been the main criterion in mining project evaluation and production plan optimisation. It is a common practice in NPV calculations to take into account only the tangible co

    Sep 26, 2011

  • AUSIMM
    Controlled Blasting for Civil Construction in an Urban Environment

    By R Domotor

    Brisbane’s Airport Link is Australia’s largest road infrastructure project, worth a total value of A$4.8 billion. The project is using surface and underground blasting to excavate hard volcanic r

    Nov 8, 2011

  • AUSIMM
    The Practical Implementation of Dewatering and Depressurisation in Large Open Pits

    All large open pits in Australia have been mined, or are planned to be mined well below the local water table. This raises several issues that impact on mine safety, mining costs and regulatory approv

    Jan 1, 2003

  • AUSIMM
    PC-BC: A Block Cave Design and Draw Control System

    This paper presents an overview of a program PC-BC developed for application to the design and evaluation of block cave operations. Conventional mine planning software tools are not well suited to the

    Jan 1, 2000

  • AUSIMM
    Evaluating the Inclusion of the Implementation Variability into Fragmentation Modelling

    By H Parra, D Zenteno

    Fragmentation modelling has been in use in the mining industry for a long time; however, there are still some aspects to tackle with regard to its use for strategic/planning and day-to-day purposes.On

    Aug 24, 2015

  • AUSIMM
    Seismic Stability Analysis of Sangan Iron Mine Project Tailings Dam

    By N Ganjian, A Delavar, F Rashidi Nejad

    Iran is one of the most seismically active countries in the world, being crossed by several major fault lines that cover at least 90 per cent of the country. As a result, earthquakes in Iran occur oft

    Jul 27, 2015

  • AUSIMM
    Accelerated aging testing of geomembranes for tailings liquor

    By J Folwell, G Phillips, F Gassner

    Geomembranes selected for various applications often start with considering target properties developed by industry organisations such as Geosynthetic Research Institute (GRI), and test methods develo

    Jul 1, 2021

  • AUSIMM
    Upgrading of the Mechanical Braking System of a Large Blair Multi-Rope Rock Hoist

    By J Harmse

    This paper deals with the modernisation of the brakes on an electrically coupled Blair multi-rope hoist and covers the removal of the old calliper brakes and hydraulic control system, and its replacem

    Jan 1, 2005

  • AUSIMM
    Improving the dewatering efficiency of clay-rich tailings in saline water

    By D Liu, M Edraki, L Berry

    The presence of clay minerals slows down the settling rate and mitigates compact consolidation efficiency in tailings dewatering. The increasing use of saline water in many plants, affects the dewater

    Jul 23, 2018

  • AUSIMM
    Closure Cost Estimation - All Things to All Men?

    By H Jones

    Closure cost estimates may be generated at any stage of a mining operationÆs life; commencing with the initial prefeasibility studies and continuing through to the final decommissioning cost estimates

    Nov 20, 2012

  • AUSIMM
    Recent Process Developments at the Phu Kham Copper-Gold Concentrator, Laos

    By P Walker, I Crnkovic, D Bennett

    The Phu Kham deposit represents a copper-gold porphyry system, with mineralisation present in skarn, stockwork and disseminated styles. Significant folding and alteration events have created a complex

    Oct 29, 2012

  • AUSIMM
    Recruiting for an Underground Workforce at Cannington

    By A G. L Pratt, M S. Kemp

    BHP has used many innovative techniques when recruiting its workforce for the Cannington Project. Looking for a balance of experience and enthusiasm it was necessary to develop pre-selection tests to

    Jan 1, 1998

  • AUSIMM
    Cooling Pathways for Deep Australian Longwall Coal Mines of the Future

    By B Belle, M Biffi

    Cooling of coal mines in the Bowen Basin, characterised by steep geothermal gradient, is presently achieved mostly through rental surface bulk air cooling in summer months. This paper argues that futu

    Jul 1, 2013

  • AUSIMM
    Ernest Henry Underground Mine – Access and Support Infrastructure Design

    By P Christen

    The Ernest Henry Copper gold mine situated in North West Queensland, Australia, is owned and operated by Xstrata Copper. Currently the open pit produces 11 Mtpa of ore. With open pit mining ceasing in

    Mar 21, 2011

  • AUSIMM
    Investigations on Fume Losses at the Sulphide Corporation's Works at Cockle Creek, N.S.W.

    The paper continues an account, begun in a previous paper, of experimental work carried out by the author whilst a member of the metallurgical staff at the Cockle Creek Works. The general method of th

    Jan 1, 1925

  • AUSIMM
    Cable Tunnel Ventilation

    By P Ridley

    EnergyAustralia’s Sydney Central Business District (CBD) cable tunnel network will form a loop 6.2 km in length. The 3.2 km long, 3.5 m, diameter city east cable tunnel (CECT) currently in design, wil

    Mar 8, 2011

  • AUSIMM
    Kempfield Silver, Barite and Base Metal (Pb-Zn) Deposit, Lachlan Orogen, Eastern Australia

    By D Timms

    The Kempfield deposit is located in the Hill End Trough, one of several intracratonic basins developed during Silurian–Devonian time, in the eastern province of the Lachlan Orogen, Eastern Australia.T

    Aug 22, 2011

  • AUSIMM
    A Study into Bonding within Reduced Titanomagnetite-Coal Compacts

    By R J. Longbottom

    In this study the bonding within reduced titanomagnetite-coal compacts was investigated. The aim of the study was to better understand the binding mechanisms in the reduced compacts and, based on this

    Jul 11, 2011

  • AUSIMM
    Analysing impact forces and overcoming speed, heat and pressure issues in high capacity belt support applications

    By C T. Portelli

    Belt conveyor transfers are the most likely location for high wear rates and failures. Belt transfers are necessary to change the direction of conveyed material and will remain a part of belt conveyor

    Sep 18, 2023