Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Benchmarking and cross validation of the multivariate conditional simulation model of the Olympic Dam depositBy D Clarke, I Minniakhmetov
The Olympic Dam deposit is truly a world-class IOCG-Ag deposit, the world’s fourth largest deposit of copper and the world’s largest known single uranium deposit. Traditional and non-traditional metho
May 24, 2023
-
Building a Geometallurgical Model for Early-Stage Project Development – A Case Study from the Canahuire Epithermal Au-Cu-Ag Deposit, Southern PeruBy R Baumgartner
The Canahuire deposit is a recently discovered Au-Cu-Ag epithermal deposit in Southern Peru. A geometallurgy program is a key study element of the project Feasibility study. Metallurgical, mineralogic
Sep 5, 2011
-
The Differences Between the Iron Formations of Grpo Para Group and Greenstone Belt Andorinhas in the Carajas Mineral Province, Para State, BrazilBy H F. Galbiatti, G J. I dos Santos, A de C Zapparoli
The Grao Para and Rio Maria greenstone banded iron formations (BIFs), within the Carajas mineral province, exhibit distinct lithological and petrographic fabrics, together with pronounced differences
Jan 1, 2009
-
A New Magnetic Drum Separator for Superfine MagnetiteBy Z Tong, M Gao, X Wang
In response to the need for improved magnetic separators for beneficiation of fine grained iron ores that have been finely ground to liberate the iron minerals from the gangue, a series of high effici
Jan 1, 2009
-
The Mineralogy of the Black Star Ore Body and its Relation to Milling Practice at Mount IsaBy McGhie R. R
The general structural features and the principal mineral relationships of the Black Star ore body, Mount Isa, Queensland, have been described in several previously published papers. But particular re
Jan 1, 1939
-
Investigating industrial feasibility of utilising magnetising roasting for goethite oreBy N Esmaeili, M Saghaeian, L Hosseini, V Sheikhzadeh, R Hejazi
Ore roasting has long been used for beneficiation and assay upgrading of different ores. In this process, which is mainly used for sulfide ores, the ore is heated to a high temperature. More specifica
Aug 24, 2022
-
Old Stopes and New Simulations – A Structural Modelling and Resource Estimation Case Study of the Edna May Gold Mine, Western AustraliaBy P Hodkiewicz
Recent structural interpretations based on historic stope shapes were used to develop a rapid and innovative method to domain and simulate structurally complex, high-grade gold veins at depth in the E
Aug 22, 2011
-
SAG mill optimisation and increasing throughput at the Phu Kham Copper-Gold Operation – a success storyBy D Baas, J Le, R Braun, R Chandramohan, K Hollis, G Lane
The Phu Kham Copper-Gold Operation (Phu Kham) is located in northern Laos, approximately 140 kilometres from the capital, Vientiane. The operation is a producing asset for Australian-based copper and
Aug 29, 2018
-
Realisation of Value through Identification of Various Oxidation Fronts and Mineralisation Styles at Trilogy Cu-Au-Ag-Pb-Zn DepositBy B Armstrong
The Proterozoic poly-metallic Trilogy deposit was discovered in 1997, and until recently, mining evaluation was stalled due to poor metallurgical performance. Unlocking the substantial economic value
Sep 5, 2011
-
Investigation of silica reduction effects on HPGR operation condition in case of iron ore increasing specific surface areaBy M Saghaeian, M Zare, V Sheikhzadeh, R Hejazi
High-Pressure Grinding Roll (HPGR) is one of the efficient methods for increasing the specific surface area (SSA) of iron ore concentrate for pellet feed production. HPGR grinding mechanism implies th
Aug 24, 2022
-
Optimisation of Drill and Blast for Mill Throughput Improvement at Ban Houayxai MineBy D Symonds, S S. Kanchibotla, L Kennelly, G McNamara, J Gaunt, B Adiyansyah
Ban Houayxai is a gold-silver mine operated by Phu Bia Mining Limited in Laos since 2012. The first two years of operation processed predominately soft oxidised ore but subsequent years were expected
Aug 24, 2015
-
Adaptation of an Open Pit Optimiser for Underground Strategic PlanningBy M Bloss, B Roberts
BHP Billiton Olympic Dam required a well-tested software product suitable for strategic optimisation and scheduling of options for a potential underground mining project. The company has a standard so
Nov 24, 2014
-
Geotechnical Challenges in Narrow Vein MiningBy J Hadjigeorgiou
Narrow vein mining, as most types of mining, faces important geotechnical challenges. The specificity of geotechnical challenges in narrow vein mines stems from the nature of the deposits, which are o
Mar 26, 2012
-
Sandgate Avenue Flood Alleviation Project, Stage 1 –Slurry Treatment Plant – Lessons LearntBy M Weeks
Melbourne Water Corporation, through the Pipelines Alliance, has commenced construction of a new drainage pipeline to provide additional flood protection within the Sandgate Avenue Main Drain catchmen
Mar 8, 2011
-
Northparkes Mines – Flotation and Planning for the FutureBy G Harbort, D Clarke, D Morgan, C Sola
Northparkes Mines commenced production in 1994 and the mine has significant reserves to allow operation into the future. There are a number of potential future concentrator feed sources with variable
Sep 1, 2014
-
Exploring Optimised Delay Timing for FragmentationBy C K. McKenzie
As more and more mining operations around the world either switch to, or trial, electronic initiation systems, the breadth of knowledge and experience regarding their effective application has widened
Nov 8, 2011
-
TiRON – A New Process for the Production of High-Grade Feedstock for TiO2 Pigment ManufactureBy J M. Shekiro
In the chloride process to manufacture TiO2 pigment, feedstocks containing higher TiO2 contents (high-grade ores or HGOs) are favoured in order to minimise production of undesirable by-products. Most
Oct 5, 2011
-
Study on change in mould slag characteristics during casting Ti containing steel gradesBy M Ranjan, C R. Borra, P Palai, P P. Sahoo
Change in mould slag composition during casting of medium alloy steel is caused by the redox reaction between molten steel and mould flux. Mould flux generally contains a certain amount of SiO2, but e
Aug 21, 2024
-
Scaled depth of burial application to increase blast efficiency in PT. Indo Muro KencanaBy A Suwandhi, H Utama
PT. Indo Muro Kencana (PT.IMK) is a gold mine that is located in Central Kalimantan, Indonesia. Drilling and blasting activity is applied in order to support mining production. Drilling and Blasting (
Jun 22, 2022
-
Economic recovery and upgrade of metals from middling and tailing streamsBy M Hourn, G Anderson, V Lawson, P Voigt, D Mallah
As mine head grades decline and orebodies become more complex, traditional mineral processing techniques and flow sheets to achieve saleable concentrate become more difficult to design and construct.
Sep 11, 2017