Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Pacific Rim Epithermal Au-AgBy G Corbett
Epithermal Au-Ag deposits form in the upper 1 km of the crust and are therefore best preserved in the less eroded Pacific rim arcs, although also recognised elsewhere. Two profoundly different ore flu
Sep 26, 2013
-
Terranes, Tectonics and the Pacific RimThe movements of the major continental cratons and the distribution of the principal tectonostratigraphic terranes are reviewed in the Circum-Pacific region during Phanerozoic time. It is concluded th
Jan 1, 1990
-
The Development of a CADD Mine Design SystemBy Gill L. F, Gleeson HB
This paper describes the development of a Computer Aided Design and Drafting based mine planning system in the State Electricity Com- mission of Victoria. The system combines a commercially available
Jan 1, 1989
-
Economic Returns From Environmental Problems ù Breeding Salt and Stress Tolerant Eucalypts for Carbon Sequestration, Salinity Abatement and Commercial ForestryCarbon sequestration in planted forests provides an immediately available, low cost option to address the greenhouse impacts of coal mining and coal utilisation in a carbon constrained world. In addit
Jan 1, 2005
-
Design and Evaluation of Dry FillBy Blair J. R, Barrett J. R
In many underground mining applications where-dry fill is used, only a token acknowl- edgement of the fill properties is given. It is the aim of this paper to induce mining engineers to consider dry
Jan 1, 1973
-
Five years of cover performance monitoring and modelling for a store and release cover at Century MineBy T Rohde, P Defferrard
In 2010 a store and release cover (the cover) was constructed on the south waste rock dump (SWRD) at Century mine. This also included aerial seeding of province native trees and shrub seeds. The purpo
Jul 23, 2018
-
Modelling multi-seam interactions for longwall miningBy A Lines
This paper addresses a gap in longwall multi-seam interactions and their predictions, providing a case study for future multi-seam operations for both anticipated conditions and a method for understan
Nov 30, 2018
-
Tube Making in AustraliaThe title of this paper suggests rather a comprehensive survey of the industry, but since it is not possible to do justice to this in a short paper, and, as the bulk of the Australian trade consists o
Jan 1, 1935
-
Prediction of Yttrium, Lanthanum, Cerium and Neodymium Leaching Recovery from Apatite Concentrate Using Artificial Neural NetworksBy A H. Bagherieh, S Mesroghli, H Jorjani, S Chehreh Chelgani
The rare earth elements (REEs) assay and recovery in leaching processes is being determined using expensive analytical methods, ICP-AES, and ICP-MS. This paper presents a neural network model to predi
Jan 1, 2008
-
Conditions and Design Considerations for Maximising Recoverable Gold in Roasting of Refractory Gold OresBy M G. Aylmore, L W. de Klerk
Roasting of refractory gold ores has been a commercial process for many years. Improvements in design of fluidised bed roasting technologies and low capital and operating costs compared with other ref
Sep 26, 2013
-
Using Life Cycle Assessments and Multi-Criteria Decision Analysis Models for Ex Ante Sustainability AssessmentBy G A. Blengini, S V. èolar
The minerals industry is faced with choices beginning in the exploration phase and extending over the life cycle of the mine. Firms examine the technical feasibility of alternative actions and typical
Jan 1, 2009
-
Status of Outburst Research at the University of WollongongBy D Bruggemann, F Sereshki
There has been an ongoing research on coal and gas outburst for the past two decades at the School of Civil, Mining and Environmental Engineering, University of Wollongong. Research study began with a
Jan 1, 2005
-
Steam Winding EnginesWINDING engines are one of the most important units in the equipment of a mine. Upon the winding machinery depends not only the output of the mine, but it supplies in most cases the only means by whic
Jan 1, 1911
-
Limnological Processes in the Development of Acid Pit LakesLimnological processes are often overlooked when trying to assess the long-term water quality of pit lakes. It is essential to deal with these aspects, since they determine the geochemical and redox c
Jan 1, 2003
-
An application of Monitoring and Numerical Modelling in Open Stope MiningBy Thomson I. R R, Friday R. G, Palmer W. T
The paper introduces the problems encountered in designing open stopes and briefly examines the factors that determine the final stope dimensions achieved after mining is completed. A case study is
Jan 1, 1981
-
Mining in FijiThe nation of Fiji is located the South Pacific on the æRim of FireÆ some four hours flying time from the eastern sea board of Australia. It is a tourist destination situated on the main route from Au
Jan 1, 2004
-
Flotation Optimisation Studies of the Perilya Broken Hill Lead CircuitBy B Kilgariff
Flotation has been in use at Broken Hill for nearly 100 years, and the process has gone through many different optimisation studies over that time. This paper reviews the current flotation practice at
Jan 1, 2005
-
Minimum sample mass from reverse circulation grade control drilling at Rocklands copper projectBy M G. Hawtin
The Rocklands copper project is a multilode, iron oxide copper gold (IOCG) + cobalt mineralised system located in the Eastern Fold Belt of the Mt Isa Inlier. Rocklands orebodies cover a range of oxida
Sep 20, 2017
-
Worthing Mine and its Historic EnginehouseBy Connell JE
The Worthing Mine near Hallett Cove. 20 km southwest of the cite of Adelaide, belongs to Aus- tralia's first mining era, which took place in South Australia between 1841 and 1851 (Figure 1). Op
Jan 1, 1987
-
Resource Estimation Using Reverse Circulation and Blasthole Samples in a Bedded Iron Ore DepositBy C Boyle
Brockman 2 mine is located in the Pilbara of Western Australia and is operated by Rio Tinto Iron Ore. Mineralisation is hosted by synclines where there is structural complexity to focus fluid flow. Mi
Jul 11, 2011