Search Documents

  • AUSIMM
    Development of a Special Purpose Coupling for Jointing Polyurethane Lined, High Pressure Pipework

    The New Zealand Steel Ironsand Slurry Pipeline was successfully commissioned in February 1986. The project includes 18 km of high pressure, polyurethane lined buried pipe. McConnell Dowell Constructo

    Jan 1, 1986

  • CIM
    EKATI Safety Guarantee A Conversation for an Extraordinary Possibility

    By Richard Morland

    Some simple and fundamental objectives To challenge and inspire our people to embrace safety as a value ?A stand for safety as a value ?A stand for our people ?A stand by our people ?Prevent harm

    May 1, 2010

  • DFI
    Arbitration - The Tender Trap

    By James Green

    It has often been said that the best contracts written are by people who are suspicious of each other. The Spanish philosopher, Ortega y Gasset, said: "Every contract is an Act of Distrust." T

    Jan 1, 1987

  • SME-ICGCM
    An Integrated Approach To Subsidence Modelling And Prediction In The Collie Coal Basin (Western Australia)

    By Ian Misich

    A research programme has been undertaken to evaluate and predict the effect of total extraction of coal by underground methods on the superimposed strata, aquifer systems and ground surface in the Col

    Jan 1, 1993

  • NIOSH
    RI 6015 Fire And Explosion In A Blasting Agent Mix Building, Norton, Va. ? Introduction

    By Robert W. Van Dolah

    On December 27, 1961, a fire and explosion destroyed the blasting agent mixing plant and an attached storage barn of the Whitaker-Atlas Supply Co., near Norton, Wise County, Va. Five residences, an of

    Jan 1, 1962

  • SME
    Discussion - An open-pit production scheduler : algorithm and implementation - by M. E. Gershon Technical Papers, MINING ENGINEERING, Vol. 39, No. 8 August 1987, pp. 793-796

    By C. J. Hall

    I would like to congratulate Professor Gershon on an idea that is obviously valuable and is certainly new to me. It has, however, to be further developed, in that one can get fallacious results by lim

    Jan 1, 1988

  • SAIMM
    Optimizing LHD Utilization ? Synopsis

    By D. Mkhwanazi

    The purpose of the project was to optimize load haul dump (LHD) machinery use as they were spending too much time doing what they should not be doing. During the investigation, the author found that t

    Jan 1, 2011

  • SAIMM
    Modelling And Prediction Of Reactions Involving Metals, Slags And Fluxes

    By J. Lehmann, H. Gaye

    A brief review of Computational Thermodynamics software concerning the modeling and prediction of reactions involving metals, slags and fluxes is presented. Their application for various steelmaking t

  • SAIMM
    What is driving the development of integrated technical enterprise systems in the mining industry?

    By I. Jones

    Geologists, engineers, technicians and surveyors have successfully utilized technical software in the mining industry for over 30 years. Software for processing survey, geology, mine engineering and p

    Jan 1, 2003

  • AUSIMM
    Opening Speech for 2006 NZ Branch Annual Conference

    Good morning ladies and gentlemen, and may I thank you for inviting me once again to address your conference. I would first like to welcome you all, especially international delegates and conference s

    Jan 1, 2006

  • NIOSH
    RI 5393 Washability Study Of Coal From Mary Lee Bed, Maben, Ala. ? Summary And Introduction

    By H. L. Riley

    At the Southern Experiment Station, Tuscaloosa, Ala., reports are prepared from time to time on results of washability studies of coal from important beds in the Southern Appalachian region. The inves

    Jan 1, 1958

  • AIME
    Minerals Beneficiation - Modernization of Bunker Hill Presintering Practices

    By H. E. Lee, D. Ingvoldstad

    AT Bunker Hill the original charge storage and preparation system was installed in 1917 to accommodate lead-silver gravity mill products. Only minor tonnages of wet fines such as vanner and flotation

    Jan 1, 1957

  • SME
    Experiences And Projections On Sag Mill Multivariable Predictive Control

    By R. Fuenzalida

    Since 2007, a number of Multivariable Predictive Control (MPC) Applications have been implemented on SAG mills, among others, within the Kairos Mining Concentrator Automation Program using ?Profit Con

    Jan 1, 2012

  • AUSIMM
    Recovery of Pentlandite and Chalcopyrite from Tailings by Bi-Cyclone Powerful Flotation Column

    Recovery of Pentlandite and Chalcopyrite from Tailings by Bi-Cyclone Powerful Flotation Column

    Sep 13, 2010

  • SME
    Results Of Instrumentation And Observation Of A Tunnel In Bedded Rock With High Residual (In Situ) Stresses

    By John D. Morton, J. H. LaVerne Palmer, Douglas J. Belshaw

    An extensive programme of ground instrumentation and observation was carried out for the West Duff in Outfall Sewer tunnel project prior to and during construction, to establish the performance charac

    Jan 1, 1979

  • NIOSH
    OFR-18-81 Preliminary Design And Cost Estimate For A Field Worthy Simple Featured MMRDM Based On A Prototype Beta Attenuation/Filter Tape System Developed Under Contract Number H0166097

    By Pedro Lilienfeld

    This report presents a design and cost investigation for several alternative versions of a field-worthy mining machine-mounted respirable dust monitor. Three main design variations are considered: (a)

    Jan 1, 1980

  • SME
    Mechanisms Involved In Reactive Flotation Of Dolomite

    By A. El-Midany

    Dolomite impurities are increasing in the currently mined phosphate deposits in Florida. Several research efforts have been conducted in various laboratories around the globe to find methods to econom

    Jan 1, 2009

  • CIM
    The New Red Lake Mine: Narrow Vein Mining in Deep, Burst-Prone Ground

    By Pierre Rocque

    The Red Lake Mine is located approximately 600 km northwest of Thunder Bay. This 545 tpd (600 tons/day) underground narrow vein gold operation is set to produce in excess of 14.8 tonnes (475,000 ounce

    Oct 1, 2001

  • AUSIMM
    Sampling, monitoring and source tracking of dioxins in the environment of an incinerator in the Netherlands

    By K H. Esbensen, A Arkenbout

    In the north of the Netherlands, in the environment of Harlingen, an industrial waste incinerator was installed in 2011. The population in the region is concerned about adverse health effects related

    May 9, 2017

  • IOM3
    Highwall mining: practical estimates of coal-seam strength and the design of slender pillars

    To maximise recovery by highwall mining, pillars must be designed which are long, slender and of relatively low width-to-height ratios. The strength of pillars with width/height less than 2 depends pr

    Jun 21, 1905