Search Documents

  • SME
    Ground Condition Mapping: A Case Study

    By H. Lawson

    The Mine Safety and Health Administration (MSHA) issued Program Information Bulletin P09-03in April of 2008, providing formal guidance on using programs that model the redistribution of stress during

    Jan 1, 2012

  • AUSIMM
    The Oxide Ore Treatment Plant, Mount Morgan

    This modern plant was installed with the object of treating all oxide ore and payable dump material by the cyanide process.The plant is located on a ridge on the eastern side of Linda Gully. The mill

    Jan 1, 1939

  • SAIMM
    Liquid-Liquid Extraction and Separation of Copper(II) and Nickel(II) Using LIX®984N

    By N. B. Devi

    The extraction of copper(II) from sulphate solution was investigated using LIX®984N in kerosene. The parameters that could affect the extraction, such as equilibrium pH, extractant concentration, salt

    Jan 1, 2014

  • AUSIMM
    Opportunities for Integrated Mine Management to Minimise Risk and Create Value

    By D Rattray, D Macfarlane, I Robb, N Halpin, G T. Dale

    Mining faces many environmental, social and regulatory liabilities of which water management is just one. Others include site rehabilitation, carbon emissions, biodiversity offsets, strategic cropping

    Nov 26, 2013

  • DFI
    Case History: Estimating Ground Vibrations Caused By Pile Driving

    By Tracy Brettmann

    A new method for estimating ground vibrations caused by pile driving was developed as a result of a vibration monitoring program performed for a large pile driving project. The method is accurate, rat

    Jan 1, 1999

  • NIOSH
    IC 7737 National Annual Diesel-Fuel Survey, 1955 ? Introduction

    By O. C. Blade

    Total sales of diesel fuel in the United States continue to Increase. This growth is due primarily to two causes: More conversion to diesel units by the rail-roads In recent years, and the greater use

    Jan 1, 1955

  • DFI
    Dynamic Pile Testing In Soils Exhibiting Set-Up - Introduction

    By Juan M. Antorena

    A dynamic testing program was performed to evaluate installation procedures, assess capacity of 610-mm (24-inch) diameter open ended steel pipe to evaluate set-up and provide minimum pile tip elevatio

    Jan 1, 1995

  • AUSIMM
    Kiruna-type Iron Deposits in the Mesozoic Ningwu Volcanic Basin, Eastern China – Origin and Relationship to Subvolcanic Dioritic Intrusions

    By X-F Zhao, J-W Li, L-P Zeng

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The formation of Kiruna-type deposits has been ascribed to either immiscible iron phosphate

    Mar 18, 2015

  • SME
    Are We Neglecting The Obvious In Mine Ventilation

    By Ernest M. Spokes

    Maximum fan efficiency can only be obtained when the fan has the correct combination of size, speed, and blade setting to provide the required flow of air against the mine resistance. As the mine grow

    Jan 1, 1977

  • DFI
    Operator Independent Installation Of Lime Cement (L/C) Columns

    By Tobias Hansson

    The quality of Lime Cement (L/C) columns is to a great extent dependent on the installation procedure. At a site in the south of Sweden, the client reported problems with the installed columns. To eva

    Jan 1, 2000

  • ISEE
    479 Charges, 13 Decks...120 Meters Above a Crushing Plant

    By Thierry Bernard

    This case study shows how a unique combination of field measurements and advanced technologies allowed blasters designing, loading and firing an incredibly challenging quarry blast.

    Jan 1, 2015

  • AUSIMM
    Measurement of Blast Vibrations: Compliance under the RMA

    With the change in legislation under the Resource Management Act 1991 (RMA), the responsibility for administering the effects of blasting on the environment, has transferred from an essentially centra

    Jan 1, 1996

  • AUSIMM
    Pardoo Groundwater Investigations - Deriving Aquifer Parameters of the Ord Range, Western Australia

    By M Kozikowski

    The primary purpose of these investigations is to determine dewatering requirements and likely impacts associated with mining operations. Standard aquifer testing techniques were carried out at multip

    Jan 1, 2009

  • ISEE
    Blast Designs and Instant Diagnostics Using the SVC500 Digital, High-Speed Smart Video Camera System

    By Bruce Vandenberg, Andy Battfay, Don Lake, Steve Conway, Jeff Yorsz

    "High-speed motion pictures are an invaluable resource for blasting analysis. Whether processed by the human eye or a computer, this imagery can provide important insight into a blast and its effects.

    Jan 1, 1994

  • AUSIMM
    Milling Practice at the Central Mine, Broken Hill, N.S.W.

    CENTRAL mine ore consists mainly of galena and marmatite in a siliceous and rhodonitic gangue, the average assay values being approximately 11.5 oz. per ton Ag, 14.5% Pb, 14.5% Zn, 1.3% Ox Pb, 0.3% Ox

    Jan 1, 1931

  • AUSIMM
    Environmental Management Systems for Mining Companies

    The increased focus on best practice environmental management has led to mining and mineral processing companies developing a variety of procedures to ensure that the environmental impacts of their op

    Jan 1, 1995

  • AUSIMM
    A Comparison of the Mechanism of Breakage in Full Scale and Laboratory Scale Grinding Mills

    By P. S. B. STEWART

    As part of a continuing study of mechanisms of breakage, the grinding at Nairne Pyrites Pty. Ltd. was traced by the addition of barytes and the results compared with parallel small scale laboratory te

    Jan 1, 1971

  • SME
    Iron Removal From Turkish Quartz Sand By Chemical Leaching And Bioleaching

    By V. Arslan

    The primary advantage of using oxalic acid is in the formation during leaching of soluble complexes that are both photo-chemically and microbiologically degradable. In this study, chemical leaching an

    Jan 1, 2009

  • SME
    The Coronado Traffic Diversion Tunnel

    By Jon Y. Kaneshiro, Ed Walton, Stephen J. Navin, Robert M. Sergeant, Storer J. Boone

    The Coronado Traffic Tunnel is a proposed two-lane, reversible, road tunnel, which will relieve severe peak hour congestion problems on surface streets. The tunnel will take traffic from the Coronado

    Jan 1, 2001

  • NIOSH
    RI 3440 Reclamation Of Stripped Coal Land (562de5e2-d1ec-435f-b520-6a08692e4239)

    By Albert L. Toenges

    A phase in strip mining of bituminous coal is the overturning of the surface of the land. The purpose of this report is to acquaint the operators and others interested in stripping with the work that

    Jan 1, 1939