Search Documents

  • DFI
    Minimising The Environmental Impact Of Construction Dewatering

    By Peter Jackson

    The dewatering of the large construction pits required for major infrastructure projects often has a significant impact on the environment. This is particularly so in urban areas and where groundwater

    Jan 1, 2000

  • SAIMM
    The use of mixed integer linear programming for long-term scheduling in block caving mines

    By G. van Hout, D. Rahal

    Caving is a mass mining method that is normally applied to large, low grade orebodies because of its low production cost and high capacity. However, equipment breakdown and poor draw management can ca

    Jan 1, 2003

  • DFI
    Ground Support And Its Toolbox

    By G. Sauer

    "More Skill is needed to avoid rather than to handle heavy ground loads." This finding, from a tunneling engineer of the nineteenth century, is still relevant today with all advanced sequential excava

    Jan 1, 2003

  • AIME
    Geology - The Need of a New Philosophy of Prospecting, 1960 Jackling Lecture (Mining Engineering Jun 1960, pg 570)

    By L. B. Slichter

    Prospecting is certainly the world's biggest and best gambling business. It is a game where the chips cost many thousands and where many millions, even billions, can be won. An attractive feature

    Jan 1, 1961

  • IIMP
    Utilización de un programa numérico de elementos finitos en el modelamiento y evaluación de taludes mineros: Algunas consideraciones para el cálculo del factor de seguridad.

    By Luis Martín Tejeda

    La simulación numérica es considerada como uno de los mejores métodos de modelamiento y planeamiento en la evaluación de la estabilidad de los taludes en minería superficial. En ese sentido, el presen

    Sep 19, 2006

  • SME
    Connection of TARP Tunnel to Thornton Quarry Reservoir

    By Djavid Mohammad

    Over the next several years, the storage capacity of the Metropolitan Water Reclamation District of Greater Chicago?s Tunnel and Reservoir Plan will be increased by 14.8 billion gallons through the ad

    Jan 1, 2008

  • SME-ICGCM
    A Retrospective Assessment of Longwall Roof Support with a Focus on Challenging Accepted Roof Support Concepts and Design Premises

    By Thomas M. Barczak

    The era of the shield-supported longwall face began in the United States a little over 25 years ago. The most fundamental development of the shield in the past 25 years has been an increase in size a

    Jan 1, 2006

  • ISEE
    "Journal: Evaluating and Managing Blasting Risk Part II"

    By Gordon Revey

    The challenge of managing blasting risk, types of risk, public perception, and a system for managing risk were covered in the first part of this article in the May/June 2000 issue of the Journal of Ex

    Jan 1, 2001

  • AIME
    The Commercial Value of Coal-Mine Sampling

    By Marius R. Campbell

    Does mine-sampling show the commercial value of a coal, and if so, how should it be done? This question is often asked, but seldom answered. During the past summer, while engaged in securing coal for

    Sep 1, 1905

  • SME
    Precious Metal Deposits Related to Alkaline Igneous Rocks – A Space-Time Trip Through the Cordillera

    By Felix E. Mutschler

    Alkaline rock-related precious metal deposits include: • orthomagmatic platinum group elements (PGE) ± gold (Au); • porphyry copper-silver-gold (Cu-Ag-Au, ±PGE); • epithermal Au-only, and Au-Ag-bas

    Jan 1, 1991

  • ISEE
    Environmental Hazards & Other Difficulties Associated, with Blasting Operations in India and Their Remedies

    In all the industries that require blasting operations using explosives, there exists numerous unwanted side effects of the blast which may pose as environmental hazards. These hazards face prominence

    Jan 1, 1995

  • AUSIMM
    New Regional Geological Mapping and Other Data for Mineral Exploration in New Zealand

    Geological maps, data, and prospectivity analysis relevant to mineral exploration in New Zealand have recently been released. Regional-scale geological mapping is increasingly available for the countr

    Jan 1, 2003

  • CIM
    The use of 3D modelling in re-examining the gold potential along the Porcupine-Destor Fault, Abitibi Subprovince, Quebec1

    By Marc Legault

    The Duparquet mining camp situated along the Quebec segment of the Porcupine-Destor Fault was the site of gold exploitation from 1933 to 1956 and 1988 to 1991. Numerous gold showings and deposits stra

    May 1, 2004

  • AUSIMM
    Ventilating the 1,480 Ft Level Drive at the South Mine, Broken Hill

    The problem of ventilating an advancing drive which finally reached 5,550 ft from the fresh air base in rock with virgin temperature of 83°F was solved economically by the use of two 15 h.p. elec

    Jan 1, 1965

  • CIM
    Two New Structures of Hydroxamate Collectors and Their Application to Ilmenite and Wolframite Flotation

    By Brian Hart, Hong Zhong, Liuyin Xia, Kyle Douglas

    "The application of hydroxamic acid as flotation collectors is fast becoming of significant interest for the selective flotation of oxide minerals along with upgrading oxidised based metal ores and mi

    Jan 1, 2015

  • DFI
    An Improved Method For The Prediction Of Pile Bearing Capacity From Dynamic Testing

    By R. T. Stain

    Dynamic methods of load testing piles using a drop hammer to generate the input force have been in use for many years. These systems are based on the wave equations developed at the Case Institute of

    Jan 1, 1989

  • SME
    Reclamation Work Reclaims Gold Tailings in the Black Hills of South Dakota

    By Fred D. Fox

    Introduction Abandoned mill tailings deposits can be found throughout the northern Black Hills of South Dakota, indicative of mining activities that originated during the great gold rush days of 1875

    Jan 11, 1984

  • AUSIMM
    A mobile laboratory for nickel prospecting and drilling operations

    This paper describes a mobile laboratory developed specifically for nickel prospecting, and which was designed to be operated by sub-professional staff in remote areas independently of established lab

    Jan 1, 1970

  • DFI
    Installation Of Augered Cast-In-Place Piles (3e8ab035-87ca-4b14-9759-c57d4f787aa0)

    By Tracy Brettmann

    Equipment ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane

    Jan 1, 2004

  • DFI
    Case Histories, Part 2 - Etudes De Cas, Partie 2 - Gallery Towers, Melbourne: Successful Approach To Difficult Piling Contract Management

    By Mario Aiezza

    This paper outlines the results of a relationship developed during the design and construction of the foundations for the Gallery Towers project in Melbourne. Both the builder and the piling contracto

    Jan 1, 2002