Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
OFR-15-74 Standardization Of Controls For Underground Electric Face Equipment - Section 1. Introduction - BackgroundBy William G. Hedling
The operation of electric face equipment in underground coal mines has proven to be extremely hazardous to mining personnel, including equipment operators and others working in the vicinity of active
Jan 1, 1974
-
Thermal and Mechanical Activation in Acid Leaching Processes of Non-bauxite Ores Available for Alumina Production—A Review Mining, Metallurgy and ExplorationBy Murat Erdemoğlu, Turan Uysal, Thierno Saidou Barry, Mustafa Birinci
The rapid development of the global alumina and aluminum industry is straight coupled with the demands and the needs of these materials. Nowadays, the only well-known accessible resources to produce a
-
Solution Mining Of Evaporites And Its Relationship To The Future Of HydrometallurgyBy Charles H. Jacoby
The solution mining of evaporites has a history of approximately 5,000 years. The insitu leaching of metalliferous ore will have many of the same characteristic problems which have confronted industry
Jan 1, 1974
-
Soil-Cement Walls For Excavation SupportBy David S. Yang
The Cement Deep Soil Mixing (CDSM) method introduces and mixes cementitious materials with in situ soils using hollow-stem rotating shafts equipped with a cutting tool at the tip and mixing paddles ab
Jan 1, 2003
-
Hydrocopper™ - Economical Treatment For Copper And Gold Concentrates At The Mine SiteBy Mikko Ruonala, Pertti Lamberg, Olli Hyvärinen
The smelting of copper sulphide concentrate is the dominant route in copper production (Figure 1). Heap leaching of oxidized copper ores with weak sulphuric acid together with copper solvent extractio
Jan 1, 2005
-
Underground Mining at Rio Tinto (c7c56392-f932-47d1-9671-af3125a26a3d)By C. R. Julian
MECHANIZATION During the last fifteen years, numerous attempts have been made to mechanize the operations of loading ore and placing till. It is to be regretted that, to date, little progress has be
Jan 1, 1940
-
The Kensico-City Tunnel Will Add Reliability to New York City’s Water Supply SystemBy Verya Nasri, Heather M. Ivory, Kevin Clarke, Eric Cole
Development of the New York City Water Supply System The New York City water supply system serves a population of almost nine million, including residents in neighboring counties. Peak day demands
Jan 1, 2007
-
Haul Road Design CriteriaBy Laurance A. Beck
Safety is the most important aspect of haul road design. Although other aspects of road installation enter decisions on design, the safety of persons using the road has to be foremost for the duration
Jan 1, 1995
-
Strengthening Of A Cardboard Machine Foundation In Kemi, Finland ? SummaryBy J. Hartikainen
Kemi cardboard mill is founded on the alluvial bed of Kemi river at the north-eastern cost of Botnic Culf in Northern Finland. The alluvium consists of sandy and silty layers underlain by thick medium
Jan 1, 2010
-
In Situ Synchrotron Radiation Diffraction during Compression of a ZKQX AlloyBy K. U. Kainer, A. Stark, D. Tolnai, M. Hehenberger, C. L. Mendis, N. Schell, N. Hort
Samples of an as extruded Mg-6Zn-0.6Zr-0.4Ag-0.2-Ca (wt.%) alloy was compressed at room temperature and at 250°C. The in situ deformation tests were performed at the P07 (HEMS) beamline of PETRA III,
Jan 1, 2014
-
Reproducibility Of Bond Work Index With Different Standard Ball MillsBy P. C. Fletcher, E. Kaya
The Bond grindability testing procedure has been standardized to measure the same grindability values, i.e. Bond work index (BWi), for the same ore when tests are performed in different laboratories o
Jan 1, 2002
-
Atomic Absorption Analysis for Nickel Using a Resonance DetectorResonance re-emission from nickel vapour affords a convenient method for isolating the resonance lines at 3415A, 3515A, and 3524A. The vapour is generated by cathodic sputtering and is illuminated by
Jan 1, 1968
-
Characterization Of Mechanical Properties And Microstructure In Copper Nanopowder Alloyed Al7075 T651 Via Friction Stir ProcessBy Dongok Kim
Regardless of the advantages of the Friction Stir Process (FSP), for age-hardened aluminum alloys, the mechanical properties such as hardness in the stir zone decreased after FSP due to the growth or
Jan 1, 2006
-
Thermodynamic Work Principal Overture — Not Just Rock n’RollBy Michael Wieland
The resolving capacity of the thermodynamic work-principal model has been seriously refined over its twelve year history, so a review of the innovations, wrong turns and their rectification is warrant
Jan 1, 2009
-
Use of Functional Performance Models to Increase Plant Grinding EfficiencyBy O. M. Arafat, J. A. Finch
"The Functional Performance Equation calculated from a plant grinding survey defines two distinct ball mill circuit efficiencies and how they relate to total production rate through the target grind s
Jan 1, 2017
-
Deep sea mining: from exploration to exploitationBy Laurens de Jonge, Wiebe Boomsma, Rodney Norman, Stanislav Verichev
"Earth provides natural resources, such as fossil fuels and minerals that are vital for human life. As the global demand grows, especially for strategic minerals, commodity prices rapidly rise. Thus t
Sep 1, 2014
-
Engineering design for a ferric chloride leaching plant to leach complex base metal sulphidesBy R. A. May, P. J. Brooks, W. M. Smith
"Neill and Gunter Limited (NGL) has prepared a preliminary design and a cost estimate for a ferric chloride leach plant to recover copper, lead, zinc, and silver from a typical complex sulphide ore. T
Jan 1, 1997
-
Grouting And Freezing For Shaft Water Control In MilwaukeeBy Patrick J. Doig
The contract for the construction of the Inline Pump Station for the Milwaukee Metropolitan Sewerage District involves the sinking of three shafts and the excavation of a pump chamber. The shafts a
Jan 1, 1985
-
The Aurora Super Pump – Part II: Field Performance of a New Hydrotransport PumpBy D. Wolfe, R. Cleminson
"The Aurora North mine has been operating for more than ten years, and is the source of over half of Syncrude’s bitumen production. The hydrotransport systems at Aurora experience high rates of wear,
Jan 1, 2014
-
Lateral Earth Pressure On Lagging In Soldier Pile Wall SystemsBy Howard A. Perko
Soldier pile and lagging is a conventional means of temporary excavation shoring. Timber lagging design has traditionally been based upon the designer's experience or empirical rules. One such me
Jan 1, 2008