Search Documents

  • NIOSH
    OFR-15-74 Standardization Of Controls For Underground Electric Face Equipment - Section 1. Introduction - Background

    By William G. Hedling

    The operation of electric face equipment in underground coal mines has proven to be extremely hazardous to mining personnel, including equipment operators and others working in the vicinity of active

    Jan 1, 1974

  • SME
    Thermal and Mechanical Activation in Acid Leaching Processes of Non-bauxite Ores Available for Alumina Production—A Review Mining, Metallurgy and Exploration

    By Murat Erdemoğlu, Turan Uysal, Thierno Saidou Barry, Mustafa Birinci

    The rapid development of the global alumina and aluminum industry is straight coupled with the demands and the needs of these materials. Nowadays, the only well-known accessible resources to produce a

  • AIME
    Solution Mining Of Evaporites And Its Relationship To The Future Of Hydrometallurgy

    By Charles H. Jacoby

    The solution mining of evaporites has a history of approximately 5,000 years. The insitu leaching of metalliferous ore will have many of the same characteristic problems which have confronted industry

    Jan 1, 1974

  • DFI
    Soil-Cement Walls For Excavation Support

    By David S. Yang

    The Cement Deep Soil Mixing (CDSM) method introduces and mixes cementitious materials with in situ soils using hollow-stem rotating shafts equipped with a cutting tool at the tip and mixing paddles ab

    Jan 1, 2003

  • SME
    Hydrocopper™ - Economical Treatment For Copper And Gold Concentrates At The Mine Site

    By Mikko Ruonala, Pertti Lamberg, Olli Hyvärinen

    The smelting of copper sulphide concentrate is the dominant route in copper production (Figure 1). Heap leaching of oxidized copper ores with weak sulphuric acid together with copper solvent extractio

    Jan 1, 2005

  • CIM
    Underground Mining at Rio Tinto (c7c56392-f932-47d1-9671-af3125a26a3d)

    By C. R. Julian

    MECHANIZATION During the last fifteen years, numerous attempts have been made to mechanize the operations of loading ore and placing till. It is to be regretted that, to date, little progress has be

    Jan 1, 1940

  • SME
    The Kensico-City Tunnel Will Add Reliability to New York City’s Water Supply System

    By Verya Nasri, Heather M. Ivory, Kevin Clarke, Eric Cole

    Development of the New York City Water Supply System The New York City water supply system serves a population of almost nine million, including residents in neighboring counties. Peak day demands

    Jan 1, 2007

  • ISEE
    Haul Road Design Criteria

    By Laurance A. Beck

    Safety is the most important aspect of haul road design. Although other aspects of road installation enter decisions on design, the safety of persons using the road has to be foremost for the duration

    Jan 1, 1995

  • DFI
    Strengthening Of A Cardboard Machine Foundation In Kemi, Finland ? Summary

    By J. Hartikainen

    Kemi cardboard mill is founded on the alluvial bed of Kemi river at the north-eastern cost of Botnic Culf in Northern Finland. The alluvium consists of sandy and silty layers underlain by thick medium

    Jan 1, 2010

  • CIM
    In Situ Synchrotron Radiation Diffraction during Compression of a ZKQX Alloy

    By K. U. Kainer, A. Stark, D. Tolnai, M. Hehenberger, C. L. Mendis, N. Schell, N. Hort

    Samples of an as extruded Mg-6Zn-0.6Zr-0.4Ag-0.2-Ca (wt.%) alloy was compressed at room temperature and at 250°C. The in situ deformation tests were performed at the P07 (HEMS) beamline of PETRA III,

    Jan 1, 2014

  • SME
    Reproducibility Of Bond Work Index With Different Standard Ball Mills

    By P. C. Fletcher, E. Kaya

    The Bond grindability testing procedure has been standardized to measure the same grindability values, i.e. Bond work index (BWi), for the same ore when tests are performed in different laboratories o

    Jan 1, 2002

  • AUSIMM
    Atomic Absorption Analysis for Nickel Using a Resonance Detector

    Resonance re-emission from nickel vapour affords a convenient method for isolating the resonance lines at 3415A, 3515A, and 3524A. The vapour is generated by cathodic sputtering and is illuminated by

    Jan 1, 1968

  • TMS
    Characterization Of Mechanical Properties And Microstructure In Copper Nanopowder Alloyed Al7075 T651 Via Friction Stir Process

    By Dongok Kim

    Regardless of the advantages of the Friction Stir Process (FSP), for age-hardened aluminum alloys, the mechanical properties such as hardness in the stir zone decreased after FSP due to the growth or

    Jan 1, 2006

  • ISEE
    Thermodynamic Work Principal Overture — Not Just Rock n’Roll

    By Michael Wieland

    The resolving capacity of the thermodynamic work-principal model has been seriously refined over its twelve year history, so a review of the innovations, wrong turns and their rectification is warrant

    Jan 1, 2009

  • CIM
    Use of Functional Performance Models to Increase Plant Grinding Efficiency

    By O. M. Arafat, J. A. Finch

    "The Functional Performance Equation calculated from a plant grinding survey defines two distinct ball mill circuit efficiencies and how they relate to total production rate through the target grind s

    Jan 1, 2017

  • SME
    Deep sea mining: from exploration to exploitation

    By Laurens de Jonge, Wiebe Boomsma, Rodney Norman, Stanislav Verichev

    "Earth provides natural resources, such as fossil fuels and minerals that are vital for human life. As the global demand grows, especially for strategic minerals, commodity prices rapidly rise. Thus t

    Sep 1, 2014

  • CIM
    Engineering design for a ferric chloride leaching plant to leach complex base metal sulphides

    By R. A. May, P. J. Brooks, W. M. Smith

    "Neill and Gunter Limited (NGL) has prepared a preliminary design and a cost estimate for a ferric chloride leach plant to recover copper, lead, zinc, and silver from a typical complex sulphide ore. T

    Jan 1, 1997

  • SME
    Grouting And Freezing For Shaft Water Control In Milwaukee

    By Patrick J. Doig

    The contract for the construction of the Inline Pump Station for the Milwaukee Metropolitan Sewerage District involves the sinking of three shafts and the excavation of a pump chamber. The shafts a

    Jan 1, 1985

  • CIM
    The Aurora Super Pump – Part II: Field Performance of a New Hydrotransport Pump

    By D. Wolfe, R. Cleminson

    "The Aurora North mine has been operating for more than ten years, and is the source of over half of Syncrude’s bitumen production. The hydrotransport systems at Aurora experience high rates of wear,

    Jan 1, 2014

  • DFI
    Lateral Earth Pressure On Lagging In Soldier Pile Wall Systems

    By Howard A. Perko

    Soldier pile and lagging is a conventional means of temporary excavation shoring. Timber lagging design has traditionally been based upon the designer's experience or empirical rules. One such me

    Jan 1, 2008