Search Documents

  • SME
    Columbus Circle Station Complex - History and Rehabilitation

    By Aram Grigoryan

    This paper addresses historical aspects and construction sequencing of the subway complex under Columbus Circle in Manhattan; the structural elements of the rehabilitation and new construction; and th

    Jan 1, 2008

  • SME-ICGCM
    Towards a Real Time Response to Changing Strata Conditions on a Longwall

    By P. Trueman

    A project is underway to convert a validated methodology to a system that will permit the near real time interpretation of loading data from longwall powered supports, allowing rapid adaptation of min

    Jan 1, 2006

  • IIMP
    Mejorando la eficiencia de la operación mediante el control avanzado en Molienda

    By Juan Kobashicawa, Bernardo Falcón

    En este trabajo se explican los controles automáticos desarrollados (In-House) e implementados en el circuito de Molienda de Compañía Minera Antamina, el cual abarca Molinos SAG, de Bolas y los Hidroc

    Sep 1, 2017

  • CIM
    Management of Environmental Emissions at Boliden Harjavalta Oy’s Smelter

    By H. -L. Heikkilä, E. Peuraniemi

    "Boliden Harjavalta Oy has a long tradition in the Finnish metal industry starting from the 1930's. The Smelter consists of copper and nickel flash smelting lines. Off-gases are captured in the acid p

    Jan 1, 2012

  • NIOSH
    RI 9328 - Laboratory Testing of the CSE SR-100 Self-Contained Self-Rescuer for Ruggedness and Reliability

    By N. Kyriazi

    The U.S. Bureau of Mines subjected the CSE SR-lOO self-contained self-rescuer (SCSR) approved by the National Institute for Occupational Safety and Health (NIOSH) and the Mine Safety and Health Admini

    Jan 1, 1990

  • NIOSH
    RI 3001 Nine Years of Smoke-Abatement Work at Salt Lake City

    By Austin Gudmundsen

    "The smoke nuisance, like many other undesirable and longstanding features in our present civilization, is still with us. On reviewing the situation we are astonished to find no authentic record of a

    Apr 1, 1930

  • DFI
    Construction And Instrumentation Of A Deep Foundation ? Synopsis

    By Y. K. Wong

    This paper describes in detail various problems concerning the construction of a pile-raft foundation supporting a 42-storey tower block. The subsurface generally consists of highly weathered sediment

    Jan 1, 2010

  • DFI
    Non-Destructive Testing, Evaluation And Optimization Of Existing Deep Foundations For Re-Use Along The East Coast

    By Matthew E. Meyer

    Renovation, rehabilitation, restoration and expansion of existing residential, retail, commercial, hospital facilities and historic structures requires assessment and evaluation of foundation systems

    Jan 1, 2011

  • DFI
    Lateral Load Tests On Drilled Piers In San Diego Area Residual And Formational Soils

    By Kul Bhushan

    This paper presents the results of lateral load tests on 0.61-m to 1.27-m (24 to 50-inch) diameter drilled and cast-in-place piers in San Diego area residual/formational soils. The test piers were ins

    Jan 1, 2002

  • CIM
    Stope Sequence Optimization for Narrow Vein, Long Term Mine Planning

    By André van Wageningen

    Long term mine scheduling is one of the most difficult optimization problems. The problem is said to be NP-complete in that the best possible solution cannot be found any quicker than checking all pos

    Oct 1, 2004

  • DFI
    Recent Evolutions In Deep Foundation Technologies

    By Maurice Bottiau

    It is a quite challenging objective to aim at covering in one paper the most recent evolution in piling and deep foundations technologies. This report has to be understood within the limits of the ses

    Jan 1, 2006

  • AUSIMM
    Valuation Methodology for Mineral Properties: An International Perspective on What is æMarket ValueÆ

    How the Australasian and Canadian Codes (VALMIN and CIMVal) approach mineral property valuation is described. Brief comment is also made on the International Valuation Standards CommitteeÆs interest i

    Jan 1, 2002

  • SME
    Characterization Of Copper Flotation Products Utilzing The JKMRC/FEI Mineral Liberation Analyzer (MLA)

    By D. Brosnahan, J. Gathje

    Newmont Metallurgical Services (NMS) recently acquired a Scanning Electron Microscope (SEM) with a JKMRC/FEI Mineral Liberation Analyzer (MLA). With the MLA software package, raw particle image and X

    Jan 1, 2007

  • CIM
    Modeling and Simulation of SkimAir® Flash Flotation as a Part of Grinding-Flotation Circuit – Case Study in Esperanza, Chile

    By Luis Bernal, Pertti Lamberg

    "SkimAir®, Outotec’s Flash Flotation unit, is placed in the grinding circuit to float the valuable liberated mineral particles from the circulating load of the grinding process while still relatively

    Jan 1, 2009

  • NIOSH
    Technology News - No. 517 - New Updates For NIOSH Coal Mine Ground Control Software

    The NIOSH suite of coal mine ground control software addresses nearly every aspect of coal mine ground control planning, including geologic characterization, mine layout, pillar design, and support se

    Jan 4, 2006

  • CIM
    Acid Recovery in the Steel and Metallurgical Industry Process Characteristics and Fuel Saving Options

    By F. Baerhold, S. Mitterecker

    "Acid recovery is an important process step in pickling and leaching processes. Pyrohydrolysis in spray roasters and fluidized beds is a well-established technology to recover hydrochloric acid, but t

    Jan 1, 2016

  • CIM
    10th Anniversary of First Installed HPGR Replacing Tertiary Crusher

    By Frank van der Meer, Jorge Portocarrero, Alexandra Gruendken

    "The number of High Pressure Grinding Rolls (“HPGRs”, also called Roller Press) installations instead of tertiary crushers is rapidly increasing. The technology has been largely accepted in the minera

    Jan 1, 2009

  • SME-ICGCM
    Recent UK Experience of Working above Previously Extracted Longwalls

    By David Bigby

    In the UK, it is becoming increasingly necessary to open new longwall mining areas above old, abandoned workings. In such cases, strategic and gate roadways must often be driven and maintained acros

    Jan 1, 2007

  • NIOSH
    OFR-8-81 Feasibility Of Control System Automation For A Drum Head Continuous Mining Machine

    By John E. Lambert

    Automatic control of drum head continuous mining machines was investigated as a means of reducing respirable dust generated and operator variabitity. Literature survey, manufacturer interviews and min

    Jan 1, 1979

  • DFI
    Experimental Study Of Axial Bearing Capacity Of Half-Closed End Steel Pipe Piles ? Synopsis

    By Y. G. Qin

    In this article an experimental study of axial bearing capacity of half-closed steel pipe pile installed at BKSH dock is presented. In comparison with open and closed end piles, half-closed end pile i

    Jan 1, 2010