Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Mitigating Longwall Subsidence Effects on a Large Industrial BuildingBy Yi Luo
The efforts to mitigate longwall subsidence influences on various residential and farming structures by many coal mining companies have been successful in the recent years (Luo, et al, 2003). The succ
Jan 1, 2005
-
Regional Joint Patterns in the Appalachian Basin: Implications for Ground Control and Origin of "Hill Seams"By Sandin Phillipson
During the course of ground control evaluations conducted by the Mine Safety and Health Administration's Roof Control Division, a number of surface and underground coal mines were visited that exhibit
Jan 1, 2010
-
Deep Cover Bleeder Entry Performance and Support Loading: A Case StudyBy Tulu B. Ihsan, Mark A. Van Dyke, Ted M. Klemetti
"How well do current modeling procedures calculate the rear abutment extent and loading? Does an improved understanding of the rear abutment extent warrant a change in standing support in bleeder entr
Jan 1, 2017
-
Numerical Modelling Based Investigation of Coal Pillar Stability for Room and Pillar Development at 900 m Depth of CoverBy Ashok Kumar, Rajendra Singh, Petr Waclawik
High-grade coal is locked in the shaft protective pillars at 900 m below surface in the Czech part of Upper Silesian Coal Basin. To optimise recovery of coal from the larger size shaft protective pill
Jan 1, 2018
-
Letter Of Nomination - 26th International Conference on Ground Control in MiningBy Christopher Mark
Dr. Christopher Mark serves as Team Leader of the Rock Mechanics Section in the Rock Safety Engineering Branch of the NIOSH - Pittsburgh Research Laboratory. In this position he leads a multi-discipl
Jan 1, 2007
-
The Initial Collapse of the Overburden Over Longwall PanelsBy Gennaro Marino
Documented case histories are studied where data were found on the initial collapse of the overburden above the longwall panels. Under this scenario, the most controlled conditions exist for assessing
Jan 1, 1987
-
Roof Span Design for Underground Stone MinesBy Essie Esterhuizen, John Ellenberger, Dennis Dolinar
"Underground stone mines in the United States use the room-and- pillar method of mining. The stability of the roof between pillars determines the mining dimensions and size of equipment that can be us
Jan 1, 2010
-
Calibrating the LaModel Program for Shallow Cover Multiple? seam MinesBy Morgan Sears
The LaModel program (Heasley, 1998) is a displacement discontinuity, boundary element model (BEM) for analyzing stresses and displacements in single and multiple-seam coal mines. After the Crandall Ca
Jan 1, 2013
-
The Contributions of the Alpha Foundation to Ground Control Research and DevelopmentBy Tom Barczak, Julian Restrepo, Zach Agioutantis
"The Alpha Foundation for the Improvement of Mine Safety and Health, Inc. (Foundation) was established as part of a Non-Prosecution Agreement (Agreement) entered in December 2011 by the United States
Jan 1, 2016
-
Keynote Address at the 23rd International Conference on Ground Control in Mining, August 3-5,2004By Lewis Dr. Wade
It is really an honor and pleasure to be here at the 231d International Conference on Ground Control in Mining. My name is Lew Wade. Until recently I served as the Associate Director of Mining for NIO
Jan 1, 2005
-
Influence of Roof/Floor Interface on Coal Pillar PerformanceBy Kyle A. Perry
Pillar design formulae have existed for decades, and the guidelines for design stability factors are generally accepted by regulatory agencies and broadly used within the coal industry. Nearly all des
Jan 1, 2013
-
High-Precision Dynamic Subsidence Prediction Model Aided by Field Measured DataBy Yuanfei Chen, Jianfeng Zha
"China is the largest producer and consumer of coal in the world. The mining-induced surface subsidence has bad influences on the surface and structures above the surface. In order to minimize disaste
Jan 1, 2017
-
A Case Study of Multi–Seam Coal Mine Entry Stability Analysis with Strength Reduction MethodBy Ihsan Berk Tulu, Michael Sloan, Ted Klemetti, Michael M. Murphy, Gabriel S. Esterhuizen, Jame Sumner
"In this paper, the advantage of using numerical models with the strength reduction method (SRM) to evaluate entry stability in complex multiple-seam conditions is demonstrated. A coal mine under vari
Jan 1, 2015
-
Case Study and Design of Standing Steel Set Support for Aged Belt Entry RehabilitationBy Kevin J. Ma, John Stankus
"In order to access remote reserve areas, some U.S. coal mines have to maintain aged underground entries for a great distance. However, high humidity, warm temperature, and time dependent deterioratio
Jan 1, 2017
-
Rock Slope Stability Comparison Between Deterministic and Probabilistic Block Theory Analyses for An Open Pit MineBy Pinnaduwa H. S. W. Kulatilake
A new formulation is given to conduct a probabilistic block theory analysis. A new computer code (BTAC) has been developed to perform both deterministic and probabilistic block theory analyses. The va
Jan 1, 2014
-
What Factors Over and Above Those Included in the Existing Coal Mine Roof Rating (CMRR) Could Also Be Predictive of Roof Instability in Underground Coal Mines?By Elizabeth Holley, Meriel Young, Gabriel Walton
"The coal mine roof rating (CMRR) was developed by Chris Mark and Greg Molinda to bridge the gap between geological variation in underground coal mines and engineering design. The CMRR accounts for th
Jan 1, 2018
-
Field Measurements of Overburden and Chain Pillar Response to Longwall MiningBy Daniel W. H. Su
Current longwall pillar design relies heavily upon past experience and many assumptions about pillar and entry response to longwall abutment pressures. Caving characteristics of the immediate and main
Jan 1, 1987
-
The Caterpillar HW300 QuickscanBy Pieter-Jan Kleiterp
Caterpillar has been involved in highwall mining since the purchase of Bucyrus in 2011. The Cat® HW300 is a continuation of the Superior Highwall Miner that was first sold in the USA in 1994. Currentl
Jan 1, 2014
-
Roof Bolter Synthetic Mesh Handling SystemBy Jonathan Duncan, Tim Burgess, William Kendall, Jens Lange
"Steel wire mesh is the accepted standard for roof and rib skin control at most coal mines in the United States. Wire mesh is delivered to the mine in bundles that are heavy and awkward to handle. The
Jan 1, 2010
-
Development Cooperation Between Operator And Manufacturer - Point Anchor Resin BoltsBy C. C. White
Much benefit can be achieved by a mining company and a manufacturer if both parties can communicate effectively with each other and assist in product development; mutually beneficial ideas and product
Jan 1, 1982