Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Financial Risk Management For Underground ConstructionBy David B. Ashley
Risks in underground construction are often viewed as technical in nature; "running ground, " "squeezing ground" and "chimneys" are terms that appear in construction managers' nightmares, and occ
Jan 1, 1983
-
Earthworks InTouch For Mine Information VisualisationBy B. Denby, R. Hollands
Mine information is often multi-disciplinary, dynamic and spatially complex. Different departments use the same data in many different ways, information changes over time and mines change their shape
Jan 1, 2002
-
Cyclonic Flotation Column For Minerals BeneficiationBy R. Lai
This paper describes the application of a cyclonic flotation column (CFC) for coal cleaning. A CFC makes use of centrifugal force to create a density gradient in a column to augment the froth flotatio
Jan 1, 2003
-
Benefit - Cost Analysis Of Surface Mining For Coal: Research Methods And Research Needs ? IntroductionBy Samuel M. Brock
Problems related to strip and auger coal mining have grown with the development of the industry and the economy. New technology has produced equipment that has made mining by surface methods not only
Jan 1, 1968
-
Processing Options For Buckhorn Sulphide OreBy D. L. Jones, S. Knoerr, J. Mansanti
The Buckhorn Mine in Nevada currently treats oxide ore using heap leach methods, but exploration has identified sulphide reserves which are refractory in nature. Preliminary testwork was conducted on
Jan 1, 1990
-
Grinding And Classification Control At Lake Dufault Mines, LimitedBy W. H. A. Timm
Lake Dufault Mines, Limited, is located ten miles north of Noranda, Quebec. Following discovery of a copper-zinc orebody late in 1961, metallurgical investigations of diamond drill core were condu
Jan 1, 1970
-
Maintenance Strategy For The 21st CenturyBy Steven A. Tesdahl
Maintenance means keeping equipment running or restoring it to operating condition. However, the 21st century will usher in a broader need for equipment management, a cradle-to-grave strategy to prese
Jan 1, 1998
-
Liberation Model For Multi-Component OresBy J. C. Yingling
An approximate analytic- model is developed for minerals liberation when comminution processes are applied to multi-component ores, i.e., ores that include grains of multiple mineral species. The mode
Jan 1, 1992
-
Dual-Duct System For Mine VentilationBy Jay Hilary Kelley
A ventilation system is described using dual aircourses: one zone occupied by working personnel, the other at the active working face. The two zones are separated by a partition or Shroud. The occupie
Jan 1, 1991
-
Water-Fuel Emulsions for Energy ApplicationBy Misra M., P. Grimes, Chen. S.
The combustion of petroleum products produces emissions which contain oxides of nitrogen (NOx), hydrocarbons (HC), and particulate matter (PM) which have adverse health and environmental effects. In r
Jan 1, 2005
-
A Control System For Roof DrillingBy George A. Takach
The U.S. Bureau of Mines is conducting research with the goal of automating underground coal mine roof bolters for greater mine safety. In the project described here, the Bureau has focused on automat
Jan 1, 1992
-
Opportunities For Continuous Mining Productivity ImprovementsBy R. H. King
The US coal industry has been using continuous room-and-pillar mining (CRPM) machines for more than 30 years for longwall development. This equipment has also been used for production mining in areas
Jan 1, 1991
-
Controlled Freezing For Temporary Ground SupportBy John A. Shuster
INTRODUCTION Controlled ground freezing for mining and construction applications has been in use for over a century. Despite the great technological evolution which has occurred during this period,
Jan 1, 1997
-
Development Of An Extruded Tunnel Lining SystemBy Kenneth Maser, Douglas W. Ounanian, Joseph S. Boyce
Foster-Miller Associates, Inc. (FMA), under contract to the Department of Transportation (DOT) and the Urban Mass Transit Administration (UMTA), is currently developing an Extruded Tunnel Lining Syste
Jan 1, 1981
-
Design Factors for Heap Leaching OperationsBy George M. Potter
During the late 1960s the mining industry became interested in USBM's efforts to develop the gold-silver heap leaching process. In the last 10 years, successful commercial heap leaching applicati
Jan 3, 1981
-
The Planning And Design Of The New 1000 M Haulage Level At LKAB MalmbergetBy A Pettersson
LKAB owns and operates two of the largest underground mines in the world in Northern Sweden. In Malmberget, with a production capacity of about 30,000 t/day of iron ore, the current main 815 m haulage
Jan 1, 1998
-
Dewatering & Pressure Relief For Tunnel ConstructionBy J. Patrick Powers, Arthur B. Corwin
Modern improvements in hydrogeology make it possible to predict with good reliability the performance and cost of ground water pumping systems in many tunneling situations. The testing and analysis te
Jan 1, 1985
-
Construction Difficulty Index For Tunnel ConstructionBy Sigmund J. Sulinski
The following is a progress report on a continuing study being made by the Sanitary District for purposes of developing reliable data for predicting costs and progress on future tunnel contracts. All
Jan 1, 1997
-
Voith TPKL Fill Control Coupling: Capabilities, Performance, and ReliabilityBy Roland Hoet
Mine operators, conveyor system designers, consultants, and manufacturers have had opportunities over the past decade to utilize various actively controlled technologies to drive complex underground c
Jan 1, 2004
-
Process Simulation to Enhance Complex Flowsheet Development: Examples in BiotechnologyBy D. Morin, J. Villeneuve, S. Foucher
The development of new processes has to follow "best practice" rules in order to be technically and economically as efficient as possible. However, innovations, new process routes and new rules are co
Jan 1, 2000