Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Panel Caving With Transport By TrucksBy E. Pizarro
Division Andina has considered in its long range planning, the exploitation by panel caving method of "Third Panel" mine, which was started its production stage during the second half of 1995. This
Jan 1, 1998
-
Rockmass Permeability Induced by Longwall Mining Under Deep Cover: Potential Gas Inflow from a Sheared Gas WellBy Steven J. Schatzel, Kayode M. Ajayi, Bo H. Kim, Zoheir Khademian, Gabriel S. Esterhuizen
The stability of shale gas wells drilled through current and future coal reserves can be compromised by ground deformations due to nearby longwall mining. Depending on the longwall-induced rockmass pe
Jun 19, 2022
-
Western Coal--Constraints On Mining And RecoverabilityBy James E. Palmer
Geologic constraints on mining and recoverability include the following: coal seams too thin or thick for conventional mining methods; coal seams with insufficient stratigraphic separation; unstable r
Jan 1, 1981
-
79th Street Water Tunnel ExtensionBy Sara J. Heinlein, George Malkos, James E. Lindell, Tony Pestonatto
The 79th Street Water Tunnel Extension Project was initially designed by the City of Chicago, Department of Public Works, to increase the capacity of the City’s south side water distribution system. M
Jan 1, 2003
-
Determining the effects of new technology on room-and-pillar productivity (e3246cdf-5e02-4b26-8a05-df2504728490)By C. J. Johnson, C. J. Bise
Abstract - As the US coal industry moves into the next century, it is becoming more apparent that the effective application of new technology is the only way it can remain competitive in the energy ma
Jan 1, 1990
-
Gold Plant Start-Up Performance – The Financial ImpactBy G. R. Tostengard
Gold plant performance during the start-up period, which extends until capacity production is sustained, has a major impact on the internal rate of return and the net present value of gold projects re
Jan 1, 1988
-
Design and Construction of Malana Hydroelectric Power Tunnel, IndiaBy Michel Claisse, R. P. Goel, André J. Rancourt, Kent Murphy
The Malana Hydroelectric Project is a private development located in HimachalPradesh State, India that was commissioned in June 2001. The plant was built and is owned by the Malana Power Company, a su
Jan 1, 2003
-
Design and Engineering during the Construction of Los Leones Station (Line 6, Santiago Subway, Chile)By Jaime Adasme, Héctor González, Benjamín Celada
"INTRODUCTION Santiago de Chile is a 7 million inhabitant city which has a 103 Km long subway network operated since 1975 by Metro S.A. This network is used on a daily basis by 2.3 million people. In
Jan 1, 2016
-
Grid-Fitting: A Method For Improved Financial And Physical Analysis Of Coal And Other Mineral DepositsBy Joseph W. Leonard
Much progress has been made in the application of geostatistics to hard rock ore deposits.1,2,3 4,8 Progress in the application of geostatistics to coal deposits has developed over a period of time ou
Jan 1, 1984
-
Improved Dewatering Of Coal By Steam Filtration - Part IBy C. E. Silverblatt
The advent of larger quantities of -1/4 inch coal in the raw feed to the preparation plant and the necessity of recovering this material has made the problem of meeting product moisture specifications
Jan 1, 1964
-
Tungsten Recovery From Searles Lake Brines By Ion Exchange (141f22c2-415c-4572-a4b6-0342e8118cd2)By P. B. Altringer
The Bureau of Mines conducted laboratory tests to develop a process for recovering a marketable grade of tungsten from the brine of Searles Lake, Calif. The brine contains only 56 parts per million of
Jan 1, 1978
-
Rapid Bubble-Pulp Separation For Improved Flotation KineticsBy F. J. Susko
The Bureau of Mines investigated rapid bubble-pulp separation to improve flotation kinetics. A shallow-depth froth separator was employed to quickly recover the mineral-laden bubbles from a mixture of
Jan 1, 1992
-
Copper Porphyry Deposit Conditions for ISCRBy G. Hoffmeyer, I. Ream
"Several copper projects exclusively utilizing in-situ recovery methods are currently under development in Arizona. Favorable conditions for In-Situ Copper Recovery (ISCR) include a saturated orebody,
Jan 1, 2016
-
The Use Of Fluid Bed Ion Exchange To Reduce Uranium Recovery Costs - 1. IntroductionBy D. Naden
Sulphuric acid leaching is the most common method of recovering uranium from its ores and in the following discussion various alternative low cost routes are investigated for recovering uranium from m
Jan 1, 1976
-
Refining Of Nickel, Copper, Cobalt Mattes Pressure Leaching And Hydrogen ReductionBy R. F. Pearce
The paper in based on laboratory and pilot plant investigations which led to the development of a series of processes for production of high purity metals from nickel-copper-cobalt mattes of a wide ra
Jan 1, 1959
-
Fly Ash Paste Utilization for Placement as Mine and Landfill Backfill at Great River Energy's Coal Creek StationBy D. Randall Crooke, Ron R. Jorgenson
Many coal combustion products (CCPs) have historically been unsuitable for placement as mine backfill because of their physical and geochemical properties and/or regulatory status. However, innovation
Jan 1, 2001
-
An Overview Of The Proposed DMLZ MineBy I. Duckworth
P.T. Freeport Indonesia operates a mining complex located in the highlands of Papua, Indonesia. This district consists of both underground and surface operations. The East Ertsberg Skarn System (EES
Jan 1, 2010
-
Computational Fluid Dynamics Modeling Of Dust Capture by a Non-Clogging Screen System for a Flooded-Bed Dust ScrubberBy O. A. Velasquez, A. R. Kumar
"Dust generated on underground mechanized coal mining faces is a health and safety hazard. Continuous miners deployed underground usually have an integrated flooded-bed dust scrubber mounted onto the
Jan 1, 2018
-
Some Aspects of the Limestone Industry in MichiganBy Carl G. Hogberg
To the casual observer there is probably no simpler appearing operation in the mineral industry than a limestone quarry. It might seem that the entire operation - from the drilling, blasting, and load
Jan 1, 1962
-
Real Time Psychrometric Data Collection (85c62861-ad3e-428a-b273-44d602c876b4)By K. H. McDaniel
Eight Mine Weather Stations (MWS) installed at the Waste Isolation Pilot Plant (WIPP) to monitor the underground ventilation system me helping to simulate real-time ventilation scenarios. Seasonal wea
Jan 1, 1997