Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Government: Legislation, Regulations, & Court Rulings - The Year That Minerals Policy Wasn’tThe administration came on as a strong supporter of the mining industry in April of 1982 when President Reagan delivered his long-awaited minerals policy statement. He promised to reduce America'
Jan 5, 1983
-
Medium-Temperature Pressure Leaching Of Copper Concentrates - Part II: Development Of Direct Electrowinning And An Acid-Autogenous ProcessBy J. O. Marsden
Part I in this series of papers considered the chemistry of medium-temperature pressure leaching of copper sulfide concentrates and reviewed the metallurgical testing and initial process development f
Jan 1, 2007
-
Portland, Oregon’s Other CSO TunnelsBy Michelle Lostra, Red Blanchette, Jan Babendererde, Greg Colzani
The City of Portland’s Westside CSO Project is constructing a deep tunnel system to reduce combined sewer overflows (CSO) from entering the Willamette River. Several kilometers of microtunneled pipeli
Jan 1, 2005
-
Application of the Ground Response Curve for Understanding the Overburden Load Transfer MechanismBy Ihsan Berk Tulu, Ted Klemetti, Deniz Tuncay, Cicek Sena, Zhao Haochen
"Analysis of Longwall Pillar Stability (ALPS) and Analysis of Retreat Mine Pillar Stability (ARMPS) treat the pillar as a passive structure that is designed to carry overburden dead-weight. This dead-
Jan 1, 2019
-
Forecasting The Number Of Fatal Injuries In Underground Coal MinesBy S. K. Oraee
Most management decisions at all levels of the organization are as directly or indirectly depends on the circumstance of future. With regard to predict the future events in the process of decision-mak
Jan 1, 2011
-
Waterproofing: Key to SCL tunnel lining designThe global tunneling industry has many challenges, both technically and financially, with the latter likely to be a significant feature over the next few years. Many industries have ad-opted standard
Jan 1, 2010
-
Rapid Excavation Using Trackless TechniqueBy S. P. Lewis, R. L. Sundeen
Most of us are aware of the ever increasing use of underground space. At the Advisory Conference on tunneling in Washington, D. C. in June of 1970, the demand for construction oriented tunneling durin
Jan 1, 1974
-
TECHNOLOGY NEWS – Tackling India’s Coal Ash ProblemBy Gary Brendel
India produces about 70 Mt/a (77million stpy) of coal ash (fly ash and bottom ash) from burning about 200 Mt/a (220 million stpy) of coal for electric power generation. The average ash content is 35%.
Jan 1, 1999
-
Optimization Of The Hydraulic Design Of Thickener Feedwells Applying Computational Fluid Dynamics And Experimental TechniquesBy L. Echeverri
Research studies have shown that the flow within feedwells displays a vortical structure and high velocities at the locations where standard tangential inlets force its way into the feedwell swirling
Jan 1, 2012
-
Social, Economic, And Planning Impacts Of Rapid Excavation And Tunneling TechnologyBy W. L. Garrison
Improvements continue to be made in rapid excavation and tunneling technology. There are several ways to examine the impacts of such improvements. The most common procedure is to monitor current devel
Jan 1, 1974
-
Cresson Mine Completes Two-Year ExpansionBy William R. Yernberg
The Cripple Creek & Victor Gold Mining Co.(CC&V) celebrated completion of a two-year, $168.5-million expansion and capital improvement program. An open house celebration was held in the historic mini
Jan 1, 2002
-
Onsite Assembly And Hard Rock Tunneling At The Jinping-II Hydropower Station Tunnel ProjectBy Stephen M. Smading
The Jinping-II hydroelectric project in China features four parallel headrace tunnels approximately 18-km- (11-mile-) long. Two will be excavated by tunnel boring machines (TBM) and two by drill-and-b
Jan 1, 2009
-
Lithologic and Structural Constraints on TBM Tunneling in New York CityBy Charles Merguerian
In medium- to high-grade metamorphic terrains such as found in New York City(NYC), rock mass texture and mineralogy are important factors in predicting TBM penetration destiny. Integration of data fro
Jan 1, 2005
-
Coping with Boulders in Soft Ground TBM TunnelingBy Peter B. Dowden, Robert A. Robinson
Boulders, frequently found in tunnels excavated through soils, can pose major problems for full face TBMs in terms of slowing or halting the tunnel advance, cutter damage, and abrasive wear. The paper
Jan 1, 2001
-
Keys To Selecting An Expert Electric Motor ShopBy Fredrick Fränding
In mining and quarrying operations, electric motors can fail for a variety of reasons. Some failures are directly linked to demanding production requirements and contaminant-laden environments and, co
Jan 1, 2009
-
Transporting A TBM Through A Large City On The East Side CSO Tunnel Project In Portland, ORBy Niels Kofoed
Upon completion of the 6,200 m (20,340 lineal ft; lft) North Tunnel drive for the Portland East Side Combined Sewer Overflow (CSO) Tunnel project in Portland, OR, the slurry tunnel boring machine (TBM
Jan 1, 2011
-
Taconite Mining – Concerns and ChallengesBy William R. Yernberg
The combined 75th Annual Minnesota Section of SME meeting and 63rd Annual University of Minnesota Mining Symposium was held April 9 and 10, 2002, in Duluth, MN. This year’s theme was “Keys to the Fut
Jan 1, 2002
-
Tough Times Not Enough To Deter More Than 2,200 From Northwest Mining MeetingAmid some of the worst economic conditions that the mining industry has been faced with in more than a decade, the mood among the large crowd at the 114th Annual Northwest Mining Association?s annual
Jan 1, 2009
-
Evaluating Ventilation Parameters For Extended-Cut Mining – Preprint 97-148By J. P. Rider
The number of extended cut mining systems has increased significantly in coal mines over the last decade, and there is a constant push to extend the face ventilation systems to even greater setback di
Feb 24, 1997
-
Analysis Of Sampling And Slurry Flow Using Multi-Physics Modeling - Preprint 09-058By D. McBride
Representative samples are required from process streams in order to accurately measure chemical and physical characteristics. This information can then be used by process operators and metallurgists
Jan 1, 2009