Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Evolution of the Avalauncher

    By John Brennan

    The Avalauncher has been an integral tool for avalanche mitigation work for close to 50 years. With their ability to place a kilogram of high explosives up to two thousand meters away, they routinely

    Jan 1, 2009

  • ISEE
    Application of Underground Pre-Splitting in Butte, MT

    By M. Gebhardt, J. Johnson, S. Rosenthal

    The use of presplitting applications in an underground mine setting is a method of reducing overbreak in the rib and back when blasting occurs. Presplitting performed at the Underground Mine Education

    Jan 1, 2024

  • ISEE
    The Burton Coal Mine Case

    By Winfried Rosenstock

    Following successful trials at Chuquicamata / Chile from February to May 2000 and from February 2001 onwards at Burton Coal Mine, RAG International/Thiess Pty Ltd., Queensland / Australia a significan

    Jan 1, 2002

  • ISEE
    Blind Hole Raise Blasting at the Homestake Mine

    By Justus Deen, Paul V. Sterk

    Through the 119 year history of the Homestake Mine various methods of raise mining have been used, these include conventional, bored, and drop raises. These raises provide passage for men and supplies

    Jan 1, 1996

  • ISEE
    Safe Practices in Hostile Blasting / Rock Conditions

    By Gour Sen, Peter Bellairs

    Blasting conducted in rock temperatures greater than or equal to 55°C (13 1 “F) and / or in rock containing sulphide minerals and their oxidation products can result in unplanned detonations. Blasting

    Jan 1, 2000

  • ISEE
    A Study on High Accuracy Delay Detonator

    By H Fukui, K Ichikawa, K Aikou, E Suzuki

    An electronic delay detonator (EDD) consisting of a digital-base electronic delay module and a conventional instantaneous detonator module, designed for series connections with a special adjustable-ou

    Jan 1, 1989

  • ISEE
    Cast Blasting: Design and Applications

    By Travis Watts, Chris Prater, G. T. Lineberry

    Moving overburden at minimal cost is becoming increasingly important to coal mining companies throughout the U.S. The coal market is currently doing well, with an average spot coal price for Central A

    Jan 1, 2006

  • ISEE
    A Case Study of Blast Damage Evaluation in Open Stope Mining at Kidd Creek Mines

    By Hung Tran, Qian Liu, Patrick Andrieux, Dave Counter

    Blast damage in open stope mining has been an important concern in controlling ore dilution. Severe damage to the surrounding rock mass can result in the caving of waste rock and/or backfill materials

    Jan 1, 1998

  • ISEE
    Emulsion Comparison Tests

    By R W. Givens

    Comparison tests were performed on 6 emulsion concentrates, 3 microballoon sensitized emulsion concentrates, and 2 water gel concentrates from 8 different sources with ANFO used as a control standard.

    Jan 1, 1990

  • ISEE
    Stimulation of Methane Flow in Landfills by Explosives

    By Anders Lagerkvist, Agne Rustan, Tommy Edeskar

    Landfills containing house hold waste produces methane gas during its decomposition. This gas can be recovered and used for heating purposes or as fuel for vehicles. Gas drainage pipes are installed i

    Jan 1, 2000

  • ISEE
    Explosion Bonded Electric Products and Explosion Cutting of Retired Nuclear Installations Pipes

    By Hu Wenjun

    This paper changes the section of copper of copper to aluminum adapter bar into aluminum plate covered one face or double face with copper coat, and changes the conductor material of knife switch, fus

    Jan 1, 2000

  • ISEE
    Reactive Ground Blast Management in a South Africa Open Pit Manganese Mine

    By Grant Small, Deon Pieterse

    Reactive ground conditions at an open pit manganese mine in the Northern Cape of South Africa resulted in an unexpected detonation.

    Feb 1, 2020

  • ISEE
    Blasting a Very Big Boulder Under Adverse Conditions

    By Brad Johnson

    Homestake Mining Corporations' open cut operation at Lead SD. experienced a highwall failure in October of 1993. The failure released a 75' section of rock wall at the 5280' level. It came to rest on

    Jan 1, 1995

  • ISEE
    The Application of GPS Positioning and Drill Monitoring Technology

    By Carl Hendricks

    AQUILA Mining Systems Ltd. is the world leader in drill monitoring, control and GPS based drill navigation systems for the mining industry. This paper will review the general design and application of

    Jan 1, 2002

  • ISEE
    The Effect of Rock Strength on Perimiter Blasting and the "Blastibility" of Massive Rock

    By Qingshou Chen, Paul N. Worsey

    It has been recently argued that rock strength has little effect on the final results of pre-split blasting and is of only minor importance when blasting rock in general. However, it can be shown that

    Jan 1, 1986

  • ISEE
    Analysis of the Rock Mass by Geophysical Methods

    By France Goupil, Richard Barabe

    In 1987, a large company reopened its quarry located in a very dense urban area in Montreal-East. This reopening occurred after a long period of inactivity during which houses were built within 200 fe

    Jan 1, 1992

  • ISEE
    Fragment Size Distribution Assessment Using a Digital Image Based Measurement System

    By Mark S. Stagg, Stephen A. Rholl, Steven G. Grannes

    A method of determining the fragment size distribution of rock quarry muckpiles using photographic and digital-image processing techniques has been developed by the Bureau of Mines. To assess the frag

    Jan 1, 1993

  • ISEE
    Mine Blasting Accident Update

    By Larry R. Fletcher, John W. Kopp

    The safety record for explosives in U. S. mining is excellent considering that over 4 billion pounds of explosives are now being used each year. However, blasting accidents remain one of the most seri

    Jan 1, 1991

  • ISEE
    Calculation of Rock Motion During Bench Blasting

    By Elaine Gorham-Bergeron

    CAROM is a distinct element, dynamic code developed at Sandia National Laboratories to calculate the motion of rock fragments during blasting.[1] It has recently been improved to incorporate a mechani

    Jan 1, 1987

  • ISEE
    Experimental Data Indicating a Direct Link Between the Rate of Stemming Ejection and the Degree of Rock Face Movement in Bench Blasting

    By Paul Worsey

    A strong inverse relationship between rock face movement and stemming ejection is presented. Previously unpublished data from blast control plug research and development involving high speed video ana

    Jan 1, 1990