Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Observation of Ore Pass System Performance at Brunswick Mine

    Brunswick Mine employs an ore and waste pass system for material transfer. This paper reviews the evolution and performance ore pass systems at the mine. It presents the range of selected configuratio

    Feb 1, 2008

  • CIM
    The Use of Design of Experimentation Software in Laboratory Testing and Plant Optimization

    By Corby G. Anderson

    "Laboratory testing, plant optimization, and the interpretation and application of metallurgical technologies can be tedious, time consuming and costly. This paper outlines the use of proven statistic

    Jan 1, 2006

  • CIM
    Mining at Depth under Weak Rockmass São Bento Mineração S/A Santa Bárbara, MG Brazil

    By Barnard Foo

    Topics of Discussion ?Location ?Production & Mining Operation ?Mineralization ?Mining Method ?Rock Mechanics Issues ?Ground Control Problems ?Numerical Analysis ?RockmassBehaviour ?Conclus

    Feb 1, 2008

  • CIM
    Optimizing Plant 2 at Kinross Paracatu, the World’s Largest Tonnage, Lowest Grade Primary Gold Milling Operation

    By Kevan Ford, Getulio Junior, Rob Henderson, Wayne Philips, Chris Martin, Rob Thorpe

    "Plant 2 at the Kinross Paracatu gold operation in Minas Gerais State, Brazil, was commissioned in late 2008. Designed to be the largest tonnage, lowest grade gold milling operation in the world, Plan

    Jan 1, 2011

  • CIM
    Isasmelt™ - Smelting more with Less

    By Biplop Das, E. Herrera, A. Burrows, P. J. Mackey, G. R. F. Alvear Flores

    Since the first commercial plant was built at Mount Isa, another twenty ISASMELT™ furnaces have come into commercial operation, and construction of new plants continues. The primary copper ISASMELT™ t

    Jan 1, 2015

  • CIM
    Aerophine® 3418A Promoter – The Canadian Collector – 50 Years of Improved Metallury in Various Applications

    By F. Bruey, T. Bruce, D. R. Nagaraj, W. Thomas, P. Riccio, E. Guitard

    "AEROPHINE® 3418A Promoter is a flotation collector that has been an industry standard in the Canadian mineral processing industry since its first commercial use at the Kidd Creek concentrator in 1980

    Jan 1, 2015

  • CIM
    New technology for hoist conveyance monitoring and analysis (ce4cfab2-0d27-4d96-82b0-9facfbf66b01)

    By M. J. Beus

    Many mines in Canada, the United States and South Africa are reaching the hoisting limit. Very little payload will be possible without compromising safety due to the excessive weight. It has been sugg

    Jan 1, 2002

  • CIM
    Spheroidization of a medium carbon HSLA fastener-grade steel

    By P. P. Sinha, D. N. Bhatia, B. R. Ghosh, R. K. Gupta

    Medium carbon, low alloy, high-strength steels containing Ni, Cr, and Mo are used for the fabrication of various types of high-strength fasteners required for launch vehicle structures. Cold heading p

    Jan 1, 2007

  • CIM
    Gold Passivation: Some Fundamental Issues to Highlight

    By A. Azizi, P. Blatter, A. Bouajila

    "Due to the high reactivity of sulfide minerals in alkaline cyanide solutions, some parasitic reactions inflict a heavy gold surface passivation and excess cyanide consumption resulting in a dramatic

    Jan 1, 2012

  • CIM
    On the Role of Bubble Size in Column Flotation

    By Jose R. Hernandez-Aguilar

    "Three models to predict the effect of bubble size (Db) on metallurgical response were tested in a pilot-scale flotation column at Teck Highland Valley Copper mine. The column was fed with slurry coll

    Jan 1, 2011

  • CIM
    Case History of Gold Discovery Eastmain River Area, Quebec

    By C. Hilgendorf, J. Gingerich, J. R. Boniwell, M. Drouin, D. David on, J. Boldy

    The initial discovery of gold in the Eastmain River area, 310 km northeast of Chibougamau, was made by Placer Development Limited in 1970. This discovery resulted from the drill testing of an airborne

    Jan 1, 1984

  • CIM
    Characteristics of Mineralization at the Main Zone of the Clarence Stream Gold Deposit, Southwestern New Brunswick, Canada: Evidence for an Intrusion-Related Gold System in the Northern Appalachian Orogen

    By K. G. Thorne, L. J. Cabri, L. R. Fyffe, D. R. Lentz, D. Hoy

    "Mineralization at the Main zone of the Clarence Stream gold deposit in southwestern New Brunswick occurs within a parallel series of quartz veins that occupy a NE-trending, steeply north-dipping, bri

    Jan 1, 2008

  • CIM
    The Cigar Lake project - mining, ore handling and milling (1463a4ec-6903-4c1d-b800-831570ba9799)

    By C. R. Edwards

    "The Cigar Lake project will develop the world’s second largest high grade uranium deposit. The Cigar Lake Phase 1 orebody contains approximately 226 million pounds U3O8 at an average grade of 20.7% U

    Jan 1, 2002

  • CIM
    Industrial Engineering at the Jeffrey Mine

    By J M. Fletcher

    The responsibility and scope of the Industrial Engineering Department, as organized at the Jeffrey mine, has been broadened to include any study, project or report that could result in more effective

    Jan 1, 1963

  • CIM
    New Construction at Tadanac, British Columbia

    By Unknown

    We are indebted to the Consolidated Mining and Smelting Company of Canada Limited for the several pictures in this issue showing the progress made in new construction at Tadanac and at Bonnington Fall

    Jan 1, 1925

  • CIM
    Improvement of Valuable Mineral Transport and Gangue Drainage in Froth Flotation

    By G. Bartolacci, G. Couture, Levasseur. B., A. Lockhart, D. Nathan

    "Pulp and froth zone characterization in a flotation circuit to improve transport of valuable minerals remains a challenge. Even though some significant breakthroughs have been made in the development

    Jan 1, 2017

  • CIM
    NYE Concentrator Expansion

    By D. Turk, P. Lefebvre, J. Sargent, K. Major

    "Stillwater Mining Company recovers platinum and palladium from their Nye Montana operations. Mining first commenced at Nye in 1987 at a milling rate of 455 t/d (500 stpd). The plant was expanded in 1

    Jan 1, 2000

  • CIM
    A Re-Examination of the Sacred Cows in the Sart Process

    By M. Melashvili

    "The SART Process was introduced to the gold mining industry in the late 1990s and several commercial plants were built over the following 10 to 15 years. Most of these plants have operated well and e

    Jan 1, 2016

  • CIM
    Innovative use of SMART Cable Bolt Data: Numerical - Back Analysis for Interpretation of Post Failure Rock Mass Properties Post-

    By Jason J. Crowder

    Presentation Outline ? Introduction ? Costs of ground support and rehabilitation ? Why post-failure rock mass properties are necessary ? The Rock Mechanics Problem ? Present State of Modelling a

    May 1, 2006

  • CIM
    Case Studies on Circuit Design Using Flotation Columns

    By Glenn S. Dobby, Glenn A. Kosick

    "Column flotation circuit engineering has matured to a good level of understanding regarding testing, scale-up and design. Some of the factors important to the process of implementing columns are addr

    Jan 1, 1995