Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Ceramics for the continuous casting of small cross section productsBy N. A. McPherson, P. C. Stevens, A. J. Rigby
"There has been a consistent move in recent years to continuously cast small billets while utilizing ceramic stream protection between tundish and mould. The need to have ceramic stream protection has
Jan 1, 1990
-
Environmental and Occupational Hygiene Considerations for High-Arsenic Metallurgical TestworkBy H. Ardehali, P. Lind
Many gold deposits also contain significant quantities of deleterious elements such as arsenic. Several biological pathways are possible for arsenic exposure; special care and caution must be used whi
Jan 1, 2014
-
The technical-scale realization of the Kivcet Process for leadBy Kiran B. Chaudhuri, Michael Koch, Jorg Lema Patino
"Stricter pollution regulations together with other factors have stimulated interest in the modernization of the traditional sinter - blast-furnace lead operation. In this context, direct smelting met
Jan 1, 1980
-
Hyperspectral Remote Sensing Characterization of Mine Materials for Process ControlBy Isabel F. Barton, Matthew J. Gabriel, Mark D. Barton
Process control, mine-to-mill optimization, and other mining operations depend on having robust, comprehensive mineralogical and chemical characterization. However, current characterization methods re
Jan 1, 2019
-
An Intelligent System for Monitoring Tower Cranes on Construction SitesBy M. A. Nadar
Harsh and dynamic construction sites are generally equipped with cranes in order to rapidly and conveniently move heavy loads from one location to the other. If not properly inspected and managed, thi
Aug 1, 2013
-
Two-Stage Fluid Bed Reactor for Arsenic Removal and FixationBy K. Adham, C. T. Harris
Arsenic is often associated with copper, nickel and gold in sulphide deposits. This paper describes a two-stage high-temperature fluid bed reactor for the removal and fixation of As from ores and conc
Jan 1, 2014
-
Conditional Bias of Geostatistical Simulation for Estimation of Recoverable ReservesBy Jason A. McLennan
Conditional bias is an infamous problem with estimation methods including kriging. Changing estimation parameters will mitigate, but not remove, conditional bias. The conditional bias of kriging is we
May 1, 2002
-
Designing for Closure And Beyond: The Perspective from Financial InstitutionsWHAT IF? ?Mine closure and reclamation liabilities were fully funded -at all times from current mine revenues ?Unexpected & catastrophic events were insured ?Remediation costs could be capped ?Ris
May 1, 2006
-
Process for the Complete Utilization of Oil Sands Fly AshBy T. H. Etsell, P. C. Holloway
The fly ash produced by oil sands operations in northern Alberta represents a large, high-grade, potential resource for vanadium production in Canada. After extensive batch testing at the University o
Jan 1, 2004
-
Development of Fail-Safety system for Building Wall Cleaning RobotBy J. Huh
Recently, there is growing trend to build the high-rise and install curtain walls. Following this trend, we developed robot for building wall cleaning work, which moves along Built-in guide rail of bu
Aug 1, 2013
-
Ion Exchange For Electrolyte Purification In Copper Electrowinning And ElectrorefiningIon Exchange is finding a greater role in copper processing, and hydrometallurgy in general, both as a technique for removing impurities and as a means of adding value through the recovery of secondar
Jan 1, 2007
-
Selecting Effective Hydrogen Production and Delivery Optionis for Mining ApplicationsBy Kimberly M. Curran
The path by which hydrogen supply is provided to any end use application will have a strong effect on the specific economics and price stability for the product supply and the flexibility with which i
May 1, 2007
-
Assessment of slag backfill properties for the Noranda Chadbourne ProjectBy Norman Lecuyer, Jacque Nantel
"The Chadbourne Project, located within the limits of the town of Noranda, Quebec, will make use of backfill materials to fill the voids left by the mining of stopes and pillars. A series of tests wer
Jan 1, 1983
-
Development of microprocessor-based system for mining and metallurgical applicationsBy Stavros A. Argyropoulos, Radhakrishna Valiveti, Bernard Closset
"The use of microprocessors in metallurgy is currently increasing at a very fast rate. A large number of companies are offering systems ""off the shelf"" which are aimed at the data acquisition and pr
Jan 1, 1984
-
Prognosis and maintenance management system for applications to aircraft enginesBy Raj Thamburaj, Li. Ping, Prakash C. Patnaik
"An effective prognosis system for aircraft engines may involve the application of a wide range of technologies and methodologies, which may include: - On-line, real-time and in-situ non-destructive i
Jan 1, 2004
-
CIM Guidelines for the Reporting of Diamond Exploration Results (2003)"These guidelines, implemented in 2003, were recommended by the Diamond Exploration Best Practices Committee established by the Canadian Institute of Mining, Metallurgy and Petroleum. The guidelines a
Jan 1, 2003
-
Hydrometallurgical Process for Treating Copper Concentrates at Sumitomo Metal MiningBy S. Asano
Hydrometallurgical processes for treating copper sulfide concentrates have attracted considerable attention over thirty years and many processes have been developed. However there have been still prob
Jan 1, 2007
-
An overview of wear-resistant alloys for the mining industryBy J. B. C. Wu, B. McKee
"Mining along with subsequent processing of the minerals often presents conditions where a wear- and/or corrosion-resistant alloy is needed to minimize downtime and maximize efficiency. This paper is
Jan 1, 1997
-
Key Factors Affecting Nickel Recovery during the Segregation of Laterite OresBy Eric J. Grimsey, Don C. Ibana, David E. Grimsey
The segregation process as applied to nickel laterite ores involves the formation of gaseous nickel and iron chlorides which are subsequently reduced to form ferronickel on the surface of a solid carb
Jan 1, 2017
-
Towards 5.0 million tonnes of pellets per annumBy Ronald C. Schimmel
In 2006, the Corus IJmuiden pellet plant produced approximately 4.6 mln tonnes of pellets. Corus IJmuiden is about to increase its pig iron production to 6.4 mln tonne HM per annum. The burden of th
May 1, 2007