    Geometallurgical Modeling of the Dumont Deposit

    "The Dumont deposit is a large (1066 Mt probable reserve) low grade (0.27% nickel), nickel sulphide project located in the Abitibi region 25km west of Amos, Quebec. Royal Nickel Corporation acquired t

    Jan 1, 2013

  • CIM
    Development and Testing of a More Effective Froth Handling Pump

    By R. J. Visintainer, W. L. Whitlock

    "Difficulties with the sizing and operation of centrifugal froth pumps are common and the underlying fluid dynamics are complex. Design and selection often relies on previous experience, offering unre

    Jan 1, 2012

  • CIM
    The Response of Cemented Backfill to Dynamic Loads from Field Observations and Split Hopkinson Pressure Bar Tests

    By J. C. Johnson

    Underhand mining with cemented mill tailings for backfill has proven to be a safe and effective alternative to conventional overhand mining for rockburst prone mines. The ability of the cemented sand

    May 1, 2007

  • CIM
    Condition Monitoring and Basic Maintenance?. One Without the Other?

    ? Founded In 1953 ? Mining growth of 83% since 2007 ? We produced over 1 million ounces of Au in 2012 ? We Forecast of 20% Au production in 2013-2015 ? We have paid a dividend 31 years consecuti

    Aug 1, 2013

  • CIM
    Toward a unified and digital communication system for underground mines

    By P. -M. Tardif, S. Outalha, R. Le

    "This paper proposes a new direction to implement an underground mine communication system. It presents actual underground communication systems and discusses their technological limits. A new system

    Jan 1, 2000

  • CIM
    Overview of Lake Shore Gold’s 2012 - 2013 Bell Creek Mill Expansion

    By D. B. Felsher

    "Lakeshore Gold’s Bell Creek Mill is located in Timmins, Ontario. The mill has been in operation since 2009 and has undergone several small expansions since then. In 2012 - 2013 the first major mill

    Jan 1, 2015

  • CIM
    Bubble Surface Area Flux: A Parameter to Characterize Flotation Cells

    By R. Filippone, Donald Leroux, Colin Hardie, G. Leichtle, Cesar Gomez, Jim A. Finch

    "Bubble surface area flux (Sb) is the surface area of bubbles per unit time per unit cross-sectional area of flotation machine. The units are: (m2 bubble surface/s)/(m2 cell) or s -1. For bubbles of m

    Jan 1, 1999

  • CIM
    The Need to Innovate: Celebrate the Past....Look to the Future

    By Dominic Fragomeni

    "The mineral processing industry has had a long history of innovation that is recognized but not often celebrated. These include significant advances in mineral measurement, testing, comminution, min

    Jan 1, 2017

  • CIM
    The Use of Fibre Reinforced Shotcrete Fill Retaining Walls with Engineered Drainage System to Achieve Safe and Efficient Hydraulic Fill Placement in Underground Voids

    Safe underground mine backfilling with hydraulic fill requires efficient fill drainage and stable fill retaining walls or bulkheads. If any or both the above two requirements are not satisfied, such

    May 1, 2007

  • CIM
    Two-Stage Flotation Treatment of Uranium Ore From Faraday Uranium Mines Limited

    By W R. Honeywell

    Two series of laboratory flotation tests were carried out to study the treatment of Faraday ore by two-stage flotation. First the acid-consumers and then the uranium minerals were floated. On ore grou

    Jan 1, 1963

  • CIM
    Characterising Ore Micro-Texture Using X-Ray Micro-Tomography

    By X. Yuan

    "The processing behaviours of ores such as their liberation characteristics in comminution and their response in separation processes are affected by their mineralogical characteristics. Key ore chara

    Jan 1, 2012

  • CIM
    25 Years of Process Development: Gold Processing

    By K. P. Wright

    "Twenty-five years ago, there were about thirty-two gold mines operating in Canada; nine of these have been in continuous operation since then and are still operating. Three of these are part of the D

    Jan 1, 1987

  • CIM
    Particle Bee Algorithm for Tower Cranes Layout With Materials Quantity Supply and Demand Optimization

    By L. C. Lien

    Tower crane layout (TCL) is a typical construction site layout (CSL) problem, which is suitable for a wide range of work assignments and site conditions. Tower crane is one of the key facilities for v

    Aug 1, 2013

  • CIM
    The Weird World of the Nanoscale

    By Michael B. Cortie

    The young field of nanotechnology has as its objective the design and construction of useful devices made of nanoscale materials. Objects or structures which have at least one important dimension in t

    Oct 1, 2003

  • CIM
    Operation Optimization and Capacity Expansion in Jinlong Copper Flash Smelter

    By Z. Jun, L. Kerning

    Jinlong copper smelter and refinery, originally designed for 100,000tpa primary copper and started up in 1997, has been expanding its capacity on the basis of operational optimization and by modifying

    Jan 1, 2007

  • CIM
    Improving Sulphide Recoveries in Complex Gold Ore Bodies Using Cost Effective Pre-Concentration by Gravity

    By Yaw Boadi, Andrew McCallum, Sandy Gray, Yavuz Atasoy, Peter Wemyss

    "Various full-scale test programs and installations of the InLine Pressure Jig (IPJ) have provided evidence that pre-concentration of the difficult to leach sulphide mineral through gravity can provid

    Jan 1, 2004

  • CIM
    Multiple Episodes of Brecciation and Mineralization Associated with an Epizonal Granite Porphyry, True Hill, Southwestern New Brunswick

    By David R. Lentz

    Abstract -At True Hill in southwestern New Brunswick, low-grade porphyry-style Bi-Sn-Mo greisen mineralization is associated with the cupola of an epizonal granite porphyry (granite) that also exhibit

    Jan 1, 1994

  • CIM
    New Facilities for Calibrating Gamma-Ray Spectrometric Logging and Surface Exploration Equipment

    By P. G. Killeen

    Proper calibration of portable gammaray spectrometers and spectrometric logging equipment is essential if they are to be used for accurate quantitative determinations of radioelement concentrations. I

    Jan 1, 1978

  • CIM
    Obtaining metallurgical data from drill core samples using a mini pilot plant

    By Nilce Alves Santos, Vânia Lúcia de Lima Andrade, Keila Lane Carvalho Gonçalves, Harold Wyslouzi1

    "When confronted with the difficult decisions on advancing an exploration project to the feasibility and construction stages, it is important to know how various regions of the ore body will react in

    Jan 1, 2002

  • CIM
    Starting Koala North ? North America?s First Underground Diamond Mine

    By Paul Harvey

    Following initial discovery in 1991, BHP Billiton Diamonds Inc opened Canada?s first diamond mine, the Ekati Diamond Mine TM (Ekati) in the Northwest Territories on October 14th, 1998. Four short year

    May 1, 2003