Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Developments in the Hydrometallurgical Processing of Nickel Laterites

    By F. McCarthy, W. Zhang, R. McDonald

    "The processing of nickel laterites has been a topic of major interest at CSIRO for almost twenty years. During this period CSIRO has collaborated with other researchers and industry in developing a b

    Jan 1, 2017

  • CIM
    Milling Circuit Control and Optimisation: The Millstar with IES

    By J. R. Hart, V. C. Smith, V. P. Babarovich-Hansen, J. H. Schubert

    "An introduction and case study of Mintek's latest generation of Milling Circuit controller, the MillStarTM with IES (Interpreting Expert System) is presented. This paper also describes as a case stud

    Jan 1, 2000

  • CIM
    Tracing Ore Boulders as a Prospecting Method 1n Canada

    By A. Dreimans

    Tracing of 'float' against the latest ice-flow directions ha!' led to or assisted in discoveries of several mineral deposits in Canada at lP.ast since 1891, e.g., fluorite and corundum

    Jan 1, 1958

  • CIM
    Assessing Vertimill Ultrafine Grinding Performance: The Gibraltar Mine Case

    By Keith Merriam, Jim McDonnell, Peter Radziszewski, Rob Rotzinger, Ian DeHart

    "Taseko Mines Limited Gibraltar copper-molybdenum mine recommenced operation in 2004 with the initiation of a series of development projects to increase throughput capacity as well as modernize the mi

    Jan 1, 2015

  • CIM
    Reflectance Spectroscopy with X-Ray Fluorescence for Rapid Slurry Analysis

    By Olli Haavisto, Juha Timperi

    "Accurate on-line assays of mineral slurries are the basis for effective operation of flotation circuits. Typically the elemental content measurements are obtained by an X-ray fluorescence (XRF) analy

    Jan 1, 2016

  • CIM
    Nuevaunión - Applying Capital and Infrastructure Synergies to Support Development of the Relincho and La Fortuna Deposits

    By C. Velásquez, W. Bergholz, C. Spence, P. Lind

    NuevaUnión SpA (NuevaUnión) is a development project located in the Huasco province of the Atacama region of Chile. It is held in a joint venture company owned 50:50 by Teck Resources Limited (Teck) a

    Jan 1, 2019

  • CIM
    The St-Honoré Carbonatite Complex, Québec

    By Marcel Vallee, Fernand Dubuc

    "The St-Honoré carbonatite complex, located 8 miles north of Chicoutimi, Quebec, was discovered in September 1967 as abnormal radioactivity was detected in the course of SOQUEM's aerial surveys. The c

    Jan 1, 1970

  • CIM
    Sampling density and grade control

    By P. Groleau, O. Tavchandjian, D. Marcotte

    In open pit mining, each small mining unit (SMU) is selected for mill processing based on an estimate of its true grade. The estimation is usually done using analyses of cuttings from blast holes with

    Jan 1, 1998

  • CIM
    Geology and Ore Deposits of the Zeballos Area, British Columbia

    By John S. Stevenson

    ZEBALLOS is a relatively new mining camp. It is on the west coast of Vancouver island, approximately 195 nautical miles northwestward from Victoria. Previous to 1934, a small amount of placer gold had

    Jan 1, 1939

  • CIM
    Longwall mining and potash

    By G. Herget

    "A brief visit to European longwall mining operations in potash showed that retreating longwall mining provides a very attractive alternative to room-and pillar mining, especially in areas with bad ro

    Jan 1, 1986

  • CIM
    Replacement of Classification Screens with Cyclones in the McArthur River Uranium Mine Grinding Circuit

    By Ken Dyck, Chuck Edwards

    "Cameco's McArthur River is the world's largest high grade uranium mine. Production started in late 1999. Cameco carried out the engineering design and construction management for the McArthur River p

    Jan 1, 2004

  • CIM
    Demonstration Campaign Results on a Cyanide-Free Process for Gold Extraction from a Refractory Pyrite Concentrate

    By A. Drouin, D. Lemieux, C. Chouinard

    "A gold bearing pyrite concentrate was treated at the demonstration scale (15 t/d) for the extraction of gold using a cyanide-free process. The pyrite was depressed in the flotation circuit in order t

    Jan 1, 2017

  • CIM
    Horses for Courses – Tailoring Front End Design to Project Requirements

    By Paul Staples, Paul Messenger, Greg Lane

    "Every project is different. While “conventional” SAG and ball mill circuits will suit many projects, for others there are alternatives, which may produce improved outcomes. This paper examines partic

    Jan 1, 2008

  • CIM
    Application And Development of Modern Copper Metallurgical Technologies in China’s Copper Industry

    By Bin Tang, Suping Yao

    In the last decade, the copper industry in China has developed rapidly and attracted the world’s attention. The production capacity of refined copper has grown remarkably from 4.578 million tons in 20

    Jan 1, 2019

  • CIM
    Towards Optimum Value in Underground Mine Scheduling

    By Bryan M. Maybee

    The scheduling of underground mining activities is a complex task, in particular because of the requirement to satisfy a large number of constraints. A Schedule Optimization Tool (SOT) for underground

    May 1, 2009

  • CIM
    Benchmarking Red Dog Ores using Modal Analysis and its Correlation with Observed Metallurgy

    By David Lin

    "Modal data from Red Dog Main Pit ores were collected and analysed on a size-by-size basis. The Main Pit data were compared to data from composite samples of Red Dog Aqqaluk ores. The data revealed th

    Jan 1, 2002

  • CIM
    Rock Mass Classification for Pre-Excavation Support Planning and at-Face Excavation Performance Assessment

    The rock mass classification systems were developed for different functions, including support selection, excavation method selection and the determination of rock mass engineering properties for exca

    May 1, 2009

  • CIM
    Matching laboratory and plant performance - a case study of the Elura lead circuit, Pasminco Australia Limited

    By M. C. Pietrobon

    "A common problem in assessing the applicability of laboratory flotation data is determining how closely conditions during laboratory testing of the ore matches those that occur in a plant. Typical la

    Jan 1, 2002

  • CIM
    Stereolithography, a Rapid Prototyping Technique for Orebody Modeling and Mine Design

    By Christopher P. O?Connor

    Stereolithography is a well known rapid prototyping technique in the manufacturing sector. Essentially it is a three dimensional printing process that produces plastic prototype parts from standard CA

    May 1, 2002

  • CIM
    The Tectonic, Magmatic and Mineralization History of the Sudbury Structure (4c0ad050-3f5c-4d02-9b1c-381b1fa8e9bb)

    By Harold L. Gibson, Don H. Rousell, Ian R. Jonasson

    "The Sudbury Structure consists of three major components: 1) the Sudbury Basin; 2) the Sudbury Igneous Complex which surrounds the basin as an elliptical collar; and 3) an outer zone of shatter-coned

    Jan 1, 1997