    Overview of Current Zinc Pressure Leach and Capacity Considerations for the HBM&S Zinc Plant

    By B. Krysa, J. Qiu

    The zinc pressure leach plant at HBM&S's operations is now in its fifteenth year of operation. Current pressure leach operation is steady at a concentrate processing rate of around 26.5 tonnes pe

    Jan 1, 2008

  • CIM
    Subaqueous Tailings Disposal: A Promising Method for the Effective Control of Reactive Waste Materials: An Overview of the Practice with Case Studies

    "It is projected that the reactivity of acid generating tailings and waste rock can be minimized by reducing the access of oxygen by placing these materials under water in natural or manmade lakes. A

    Jan 1, 1992

  • CIM
    Mill Speed Control for More Efficient Grinding

    By V. K. Gupta

    "Effect of mill speed on grinding kinetics has been investigated with a view to using mill speed as a manipulated variable for control and optimization of the grinding circuit performance under variab

    Jan 1, 1985

  • CIM
    Performance Characteristics of an Improved Flotation Mechanism

    By George A. Lawrence, J. C. McHardy

    "Field operating experience with an improved flotation mechanism for handling various flotation applications is covered in this paper. Some aspects of designing flotation machines are also presented.

    Jan 1, 1985

  • CIM
    Predicting the penetration rate of percussive blasthole drills using coarseness index and median particle size

    By S. Kahraman, K. Develi, E. Yasar

    Four hydraulic top hammers, one pneumatic top hammer, and three down-the-hole drills were observed in several rock types at quarries and highway construction sites to measure the performance data. At

    Jan 1, 2004

  • CIM
    Vector Neutral Truck: A 10% Improvement to the Haulage Cycle

    By Michael Stuart Parsons

    The haulage cycle is the sequence which a haulage vehicle must first arrive at the loading area, then turn around and reverse into position. Once it is loaded, the vehicle leaves and travels to the un

    May 1, 2003

  • CIM
    In situ acid leaching of copper tailings deposits: A case history

    By C. D. Shackelford, J. F. Muñoz, M. Vauclin, P. Rengifo, A. Suazo

    The results of a field-scale study involving in situ leaching of copper ore tailings using sulphuric acid as the leaching agent, injection wells to introduce the leaching solution and extraction wells

    Jan 1, 2001

  • CIM
    Practical Experience in the Briquetting of Bituminous Coking Coal

    By J. Shanks

    A S far back as 1925, Brazeau Collieries, Limited, became interested in .briquetting. This was brought about by complaints from their principal customer that stack losses, due to a high percentage of

    Jan 1, 1942

  • CIM
    Indicator mineral and till geochemical methods for kimberlite exploration in glaciated terrain (526cabe2-e08e-448c-950e-0f39e1fcecab)

    By M. B. McClenaghan

    "This paper summarizes diamond exploration techniques used in glaciated terrain, focussing on indicator mineral and geochemical methods applied to glacial sediments. Understanding the ice flow history

    Jan 1, 2002

  • CIM
    Correlating Economic and Social Data for a Globalized Mineral Investment

    By Zetti Gavelán

    Globalization and the search for new ore deposits inevitably lead to investment in foreign markets. Investors need to be aware of the effect of their venture on regional, social and economic issues wh

    May 1, 2003

  • CIM
    Milling of Noranda Process Slags

    By P. W. Godbehere, B. W. Brooks

    "This paper deals with the milling of slags from the Noranda Continuous Process, in the Horne Concentrator at Noranda, Quebec. The milling of copper slags, although novel in Canada, has been practiced

    Jan 1, 1977

  • CIM
    Toppling failure — A proposed analytic solution

    By J. I. Mathis

    "The failure that was utilized for developing this model was a double bench-scale failure, approximately 20 m in height, in the Misery pit at BHP Billiton’s EKATI mine site. The bench that failed was

    Jan 1, 2004

  • CIM
    Golden Giant Mine Mill Process Description and Operating Highlights

    By R. Tessier, C. R. Larsen

    "INTRODUCTIONOn November 10, 1982 Nor and a Inc signed an agreement with Golden Sceptre Resource Ltd. and Goliath Gold Mines Ltd. to construct a mine and milling facility.The Golden Giant mine is loca

    Jan 1, 1986

  • CIM
    Lac Minerals Development of Hemlo

    By C. Patel, George H. Hope

    "INTRODUCTIONThe Hemlo area is located in Northern Ontario, some 350 km east of Thunder Bay along highway 17. Hemlo is Canada's largest, recent discovery of gold ore. Three companies, Lac, Noranda, an

    Jan 1, 1985

  • CIM
    Evaluation of the Tower Mill as Regrind Machine

    By J. M. Menacho, J. M. Reyes

    "Batch and continuous regrind tests were conducted in 3 kW and 15 kW tower mill units, respectively. Single particle size classes of a chilean copper sulphide concentrate were employed in the batch te

    Jan 1, 1989

  • CIM
    Recommended Practices for Application, Installation and Calibration of a Weightometer

    By D. G. MacBeth

    Most belt scales on the market are factory calibrated to minimum accuracy figures of 0.1% - 0.2% at several load points. However, if the same belt scale is not properly installed and maintained on the

    Jan 1, 1975

  • CIM
    Comminution Circuit Comparison Conventional versus Semi-Autogenous

    By G. H. Babcock, D. A. Knight, V. G. Medina

    "Production commenced at the Golden Sunlight Mine in 1983 and at Kidston Gold Mine in 1985. These projects were both constructed under the management of the Placer Dome Inc. (Technical Services) group

    Jan 1, 1991

  • CIM
    Improved flow-through share rules

    By Robert B. Parsons

    "Canada's mining industry has reason to celebrate the federal government's budget which was tabled on February 26, 1986. The budget contains an important proposal to improve the flowthrough

    Jan 1, 1986

  • CIM
    The Echo Bay Mines Silver Mill

    By Graham A. Karklin

    "The Echo Bay Mines silver property is located 875 air miles north of Edmonton, Alberta. The mine is on the east shore of Great Bear Lake at Port Radium which is twenty six miles south of the artic ci

    Jan 1, 1981

  • CIM
    International mineral resource and mineral reserve classification and reporting systems

    By S. Felderhof, W. S. Vaughan