Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Investigations of Conveyor Belts Condition in the Institute of Mining Engineering at Wroclaw University of Technology

    By R. Blazej

    Machinery Systems Division (MSD) in the Institute of Mining Engineering at Wroclaw University of Technology specializes in belt conveying systems analyzing, calculating and design. Within the division

    Aug 1, 2013

  • CIM
    Evaluation of Grinding Media Shape, Mill Speed, Feed Density and Temperature in a Pilot Plant Ball Mill

    By Paul Staples, Fred Woodcock, Robert Grant, Mike Cooper

    "Noranda's Brunswick Mining Division, near Bathurst, New Brunswick, processes 10,500 TPD of complex Cu-Pb-Zn bearing ore. Brunswick uses conventional rod and ball milling techniques to achieve a flota

    Jan 1, 1997

  • CIM
    Ignition of sulphide dust clouds by explosives

    Experimental Mine, Val d'Or, Quebec, Experiments on the ignition of sulphide dust clouds by explosives have been conducted in a 1 m3 explosion chamber. The explosives tested are ANFO, emulsion, a

    Jan 1, 1993

  • CIM
    Production Simulation Overview and Case Study: Coleman 170 Orebody

    By Scott Hopkins

    Simulation tools are preferred for evaluating complex systems due to its ability to mimic reality and quickly evaluate many different what-if scenarios and find global solutions. A simulation model is

    May 1, 2008

  • CIM
    A Review of Methods for Assessing the Hoek-Brown mi Constant from Triaxial Testing

    By R. Cammack

    "A fundamental component of the Hoek–Brown empirical rock failure criterion is assessing an appropriate mi constant. In developing their empirical criterion Hoek and Brown normalised triaxial test res

    Jan 1, 2015

  • CIM
    The Mine Inspector and Mine Safety

    By D. G. Sinclair

    In any discussion on the subject of mine-safety, it is well to honestly face the fact at the outset that mining is a hazardous occupation and that certain inherent dangers attach to the work, which, i

    Jan 1, 1930

  • CIM
    Les grands couloirs de déformation de la sods-province de l'Abitibi

    By Guy Archambault, Réal Daigneault

    "Un trait marquant du cadre tectorwstratigraphique de la Sous-province de l'Abitibi est la présence de nombreux couloirs de déformation d’extension régionale et sub-concordants au grain stratigraphiqu

    Jan 1, 1990

  • CIM
    The Systematic Reclamation of Gold Mine Tailings

    By Jean-Claude LeRoy, Herman Keller

    "INTRODUCTIONEROCON's work is the reclamation of mine wastelands. It has had considerable experience in particular in the reclamation of gold mine tailings in the Canadian Shield since the latter part

    Jan 1, 1975

  • CIM
    Sand Fill from Mill Tailings

    By W. T. Martson

    ABSTRACT Sooner or later, every producing mine faces the question of fill. This paper invites consideration of mill tailings as an economical, efficient, and quantitatively adequate source of such fi

    Jan 1, 1951

  • CIM
    Experimental investigation of the oxidation and consolidation of sulphide aggregates and the application to underground muck-piles Lockerby Mine, Sudbury, Ontario

    By S. Nikolic, O. O. Kehinde-Philllps, O. T. Djamgouz, D. H. Rousell

    "A bulk mining method is employed at the Lockerby mine resulting in the formation of large muck-piles. If these muckpiles remain in the stopes for some time they may agglomerate to the extent that the

    Jan 1, 1984

  • CIM
    Gaining Insights on Career Satisfaction for Women in Mining

    By T. Nyabeze

    This paper presents the experiences and views of women involved in the mining industry as determined from a questionnaire that was circulated across the Canadian mining industry. Globally, there have

    Oct 1, 2010

  • CIM
    A Plant-Wide Control System for Flotation Level Control

    By D. G. Hulbert, J. H. Schubert, R. G. D. Henning

    "Froth depth, along with reagent addition and aeration rate, is one of the crucial factors that can be used to control a flotation circuit. Sub-optimal setpoints and disruptions in levels have a sever

    Jan 1, 1995

  • CIM
    Sill pillar recovery at the Louvicourt mine

    By D. Fleury

    "This paper describes the challenges of mining a sill pillar under various types of paste backfill quality. From 1994 to 2002, Louvicourt mine produced approximately 12,600,000 t grading 3.5% Cu, 1.5%

    Jan 1, 2005

  • CIM
    Minimizing the economic unit cost of dragline-truck-shovel operations at Yatagan-Eskihisar open pit mine, Turkey

    By C. O. Aksoy

    There is a long history of coal production in Turkey with electric energy generated from power plants since the 1950s. However, the cost of power generation is high. Therefore, it has become necessary

    Jan 1, 2005

  • CIM
    Namew Lake Mill Project

    By K. Hoover, G. Labarre, S. Rantanen

    "As part of the Namew Lake project a mill was constructed to treat 1900 tpd of ore grading approximately 0.90% CU and 2.45% Ni to produce copper and nickel concentrates.Nickel occurs mainly as pentlan

    Jan 1, 1990

  • CIM
    Breaking New Ground

    By Natasha A. Essar

    Nevsun Resources Ltd. Bisha Mine Project is a gold and base metal development project in the Gash Barka region of west-central Eritrea. The project has the potential to be one of the largest industri

    May 1, 2007

  • CIM
    H.D.P.E. Piping in the Mining Industry

    By J. R. Eastwood

    "H.D.P.E. Piping in the Mining IndustryThere has been much use· ms.de of high density polyethylene pipe in the mining industry over the past several years. This is not only in new installations but al

    Jan 1, 1975

  • CIM
    Computer Control of Flotation at Mattagami Lake Mines

    By D. W. Hendriks, C. Daoust, K. V. Konigsmann

    "The concentrator of Mattagami Lake Mines Limited commenced operation in 1963. It had been designed with instrumentation proven at that time. New control techniques were added in subsequent years.An o

    Jan 1, 1976

  • CIM
    Stratigraphic and Structural Constraints on Limestone Exploration: A Case Study from Northern New Brunswick, Canada

    By I. Dimitrov, S. R. McCutcheon

    "Industrial-grade limestone is found in both the Lower Silurian La Vieille Formation and Upper Silurian LaPlante Formation of the Chaleurs Group in northern New Brunswick. Currently, between 150 000 a

    Jan 1, 2007

  • CIM
    Framework for optimizing components in an oilwell cement slurry design

    By D. Getzlaf

    "Oilfield cementing has been utilized in the industry since the turn of the century. Originally, wells were shallow and criteria for well integrity were somewhat limited. Since that time, wells have s

    Jan 1, 2004