Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Goodyear Nickel Prospect, Carnylia Hill, Western Australia

    By Gole MJ

    The Goodyear nickel prospect is located 45 km southeast of Kalgoorlie (31.04¦S, 121.80¦E) near the eastern boundary of Hampton Area - East Location 45 (Figure 1). Nickel mineralisation was discover

    Jan 1, 1996

  • AUSIMM
    The Discovery of Cold - Silver Mineralisation at Binebase, Sangihe Island, Indonesia

    By Alwan M

    At Binebase mineralisation is hosted within an andesitic Neogene volcaniclastic succession on Sangihe Island, Indonesia. Two major alteration types occur; an initial widespread phyllic assemblage of q

    Jan 1, 1990

  • AUSIMM
    Resin Bonded Bolting in French Coal Mines

    Roof bolting with resin bonded bolts has been developed extensively in French coal mines. There are three aspects of this development: 1. The reason for and the care used in the development of roof

    Jan 1, 1971

  • AUSIMM
    Sampling and Blending Practice for a 5000 Tonne/Day Iron Blast Furnace

    By Brown D. N, Troth D. A

    Large blast furnaces demand high standards of preparation of feed materials which must meet tight specifications of chemical and physical quality. Measurement of these factors must be expeditious b

    Jan 1, 1976

  • AUSIMM
    The Assessment of Cast Blasting Practices Using Monitoring Techniques

    By Moxon N. T, Berndt J. R

    BHP-Utah Coal Limited's Peak Downs Mine is located in Cen- tral Queensland, approximately 200 km south west of Mackay. The annual raw coal production of the mine is over 8 million tpa, requirin

    Jan 1, 1989

  • AUSIMM
    Childe Harold: A Case Study in the Use of Multiple Bench Grade Control Techniques

    By Stuart M. S, Allen P. B

    The Childe Harold deposit was mined by the Granny Smith Joint Venture (GSJV) from late-March through to early-December 1993. This was a fast-tracked mining project whose history began with an offer

    Jan 1, 1994

  • AUSIMM
    Copper Concentrator Practice at Mount Isa Mines Limited, Mount Isa, Qld

    By Hare S. M, Griffin P. T, O&apos

    Chalcopyrite ore and converter slag treatment to produce copper concentrates is undertaken at the Copper Concentrator of Mount Isa Mines Limited. This concentrator was commissioned in May 1973, replac

    Jan 1, 1993

  • AUSIMM
    Towards an Assessment of the Changing Regimen of Total Infrastructure Needs

    By Colston M. B, Johnson I. D

    The importance which matters of social welfare and environmental quality have assumed recently is the underlying theme of this paper. Demands for infrastructure reflect the change in emphasis from

    Jan 1, 1977

  • AUSIMM
    Geology of the Leigh Creek Coalfield

    By Townsend IJ

    The Upper Triassic Leigh Creek Coal Measures which include a number of seams of sub-bituminous black coal are preserved in four small intramontane basins. The largest is Telford Basin, 1,000 m in

    Jan 1, 1975

  • AUSIMM
    Inverstigations of Material Distribution and Permeability-Improvement of the Permeability of No. 7 Blast Furnace

    By Flierman GA, Van Toor CH

    Investigations were carried out of burden distribution using a full scale model of the furnace top. Various charging sequences were used and large differences were found between ore charged as sinter

    Jan 1, 1975

  • AUSIMM
    Controls on Gold Mineralisation in the Pine Creek Geosyncline

    By Eupene GS

    The Early Proterozioc Pine Creek Geosyncline hosts a large number of gold showings. Mineralisation types include stratiform, synsedimentary deposits within iron formation and carbonaceous mudstone

    Jan 1, 1984

  • AUSIMM
    Some Radioisotope Applications in Mineral Processing

    By Wilkinson LR

    The object of this paper is to present a brief overview of applications of radioisotopes in mineral processing. The emphasis is towards on-line applications, and is to present the broad picture rat

    Jan 1, 1978

  • AUSIMM
    Broken Hill At The Cross Roads

    A review is given of the development of the author's ideas on the relationship of ore occurrence to regional dislocations in the earth's crust, presently identifiable in particular areas

    Jan 1, 1983

  • AUSIMM
    The Inclusive Management of Operating Risk, Efficiency and Organisational Dynamics at the Cosmo Howley Mine

    By Johnson G. D

    The typical management systems used to address the issue of operating risk centre around technologies that identify, analyse and evaluate the risk factors. These logical systems such as HAZOPs, Faul

    Jan 1, 1994

  • AUSIMM
    Roof Falls in Australian Longwalls

    By Savidis GM

    This report outlines the experience of Australian mining operators in dealing with large falls of roof in advance of longwall supports. Previous and present techniques used for face stabilisation

    Jan 1, 1986

  • AUSIMM
    Rockburst: Understanding and Control - Past, Present and Future

    By Hagan T. O

    The problem of rockbursts presents a serious threat to many deep, hard-rock mines. For several decades, the owners and managers of affected mines have been concious of the urgent need to control r

    Jan 1, 1986

  • AUSIMM
    Estimation of Reserves and Resources in Shear Zone Hosted Deposits

    By Yates M. G, Rowlands A. T

    Most geostatistical techniques applied to the estimation of ore reserves assume relatively unifonn grade and thickness within an ore deposit environment. In shear-hosted mineralisation this rarely occ

    Jan 1, 1991

  • AUSIMM
    Isotopic Studies of Australian Natural and Coal Seam Gases

    By Rigby D, Gould K. W, Hart G. H

    The variation in chemical and isotopic composition of hydrocarbon gases generated from humic source rocks in the Cooper Basin, the orth West Shelf, the agoorin oil shale deposit. ollinsville and the s

    Jan 1, 1985

  • AUSIMM
    The Correlation Between Ascending Mining and Stability of the Overlying Strata

    In the process of mining the lower seam in a multi-seam operation, a lot of oblique fract- ures appeared in the upper seam which was in the equilibrium zone. These fractures closed soon after the l

    Jan 1, 1986

  • AUSIMM
    Recovering Iron and Zinc Values from Steel Plant Dusts with Simultaneous Destruction of Organic Wastes: The EnvIRONment Process

    By Reilly L, Worner H. K

    The EnvIRONment process has been developed to treat steel works dust and organic wastes simultaneously. A pelletised feed is fed into a special DC electric furnace, the pellets becoming immersed in

    Jan 1, 1995