Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Palaezoic Arc Related Volcanism on the Bolivian AltiplanoThe rocks of the Serranias Chilla massif of Bolivia are a suite of metamorphosed Palaeozoic basalts and associated continental sediments. Whole-rock trace element geochemistry of the basalts suggest a
Jan 1, 1990
-
Classification And Quantification of Ore Grain Textures of the Hilton North Deposit, Mount Isa, Queensland, AustraliaStudying the ore textures in a discrete orebody is a novel approach to estimating liberation potential of the ore minerals present. As part of a PhD thesis, this project aims at classifying and quanti
Jan 1, 1993
-
Design and Operation of Gunpowder Copper Ltd's In Situ Leach-SX-EW ProcessThe Mammoth Mine is located some five kilometres from the town of Gunpowder which is approximately 120 km north-west of Mount Isa in Queensland.
Jan 1, 1993
-
Bore Core Washability Data- Its Use And Limitation I Field Evaluation And Washery DesignThe paper outlines the development and objectives of the slim core (50 mm dia.) testing procedures employed at the Company's Central Research Laboratories with particular reference to washabil
Jan 1, 1977
-
Extending Information from Coal Bore CoresA description is given of a detailed examination of a coal bore core and of attempts to predict properties of equivalent "as-mined" coal using the bore core data so obtained. The accuracy of the pr
Jan 1, 1972
-
Coal - Paper No. 11 Various Interpretations Of Coal Petrographic Nomenclature And Their Effects On Maceral AnalysisBy Diessel C. F K, Ng N
The commonly used Stopes-Heerlen coal petrographic classification and nomenclature has over the years been subject to variable interpretations. This paper discusses the problem with specific refere
Jan 1, 1969
-
Application of Gas Suspension Calciner in Relation to Bayer Hydrate PropertiesBy Nickelsen J, Theisen KG, Hansen PH
The use of stationary calciners in the processing of aluminium hydroxide has emphas- ized the importance of Bayer hydrate properties with respect to particle breakdown during calcination and subsequ
Jan 1, 1981
-
Universal Reconciliation – A Multidisciplinary Approach across the Entire Mining Value Chain to Identify Loss of Value and Maximise Operational PerformanceBy R Hargreaves, C Morley
The authors often see problems on mine sites that are due to insufficient feedback between technical discipline silos as the realities on the ground fail to inform the models and plans used to drive r
Aug 18, 2014
-
The Design, Installation and Commissioning of the Northparkes MinesÆ Lift 2 Ground Handling SystemBy I Ross
The ground handling system needed for the second lift of the underground block caving operation at Northparkes Mines had to link into the existing infrastructure. Production requirements indicated tha
Jan 1, 2005
-
Jaguar Base Metals Project Case Study – Has Reality Reflected the Study?By R Jacobs
"The Jaguar project is relatively unique in that it was evaluated, financed, built and operated to completion within the last ten years, providing the opportunity to holistically review and reconcile
Mar 8, 2016
-
Development of a Treatment Method for a Low Grade Uranium DepositBy Kwok S, Haemmerle A
Treatment methods for a low grade deposit at Mt. Fitch near Rum Jungle, N.T., were investigated. Physical beneficiation of the ore, sulphuric acid leaching, carbonate leaching and various methods of
Jan 1, 1970
-
Deriving Quantitative Dust Measurements Related to Iron Ore Handling From Airborne Hyperspectral DataBy P T. Hick, T J. Cudahy, M S. Caccetta
Dust derived from mining and handling of ore has been identified as a major concern for the mining industry in Australia and may be critical to the future viability of some resource industries (CSIRO,
Jan 1, 2002
-
Alluvial Gold in Eastern Southland: Origin of the Gold and Genetic Relationships Between Placer DepositsBy D Craw
Middle and Late Cenozoic fluvial conglomerates and gravel in northeastern Southland record the transport of alluvial gold from Central Otago into Southland, and subsequent reworking and concentration
Jan 1, 2002
-
Optimising Mining Selectivity with Particular Emphasis on Bench Height : A Case Study at the Telfer Gold Mine, Western AustraliaBy Whitham M
Prior to exploitation, the feasibility of mining and recovering ore can usually be determined to a satisfactory level of uncertainty by the consideration of conceptual scenarios, using a range of r
Jan 1, 1991
-
The Effect of Thallium on the Rate of Extraction of Gold from Pyrites CalcineThe addition of a thallous salt to the cyanide leach of a calcined pyritic concentrate causes a marked increase in the"rate of extraction of gold. This probably is due to the activation of passive
Jan 1, 1964
-
Calibration of an Airblast Prediction ModelBy A J. Moore
To control the airblast from blasting to regulatory limits at environmentally sensitive sites near the Collinsville Coal Mining Operations, it has been necessary for Thiess Mining to incorporate a wav
Jan 1, 2004
-
Isotope Geochemistry of the Black Ridge Gold Deposit, Clermont, Central QueenslandBy Dobos SK
The Black Ridge Gold Deposit is located in the northern part of the Clermont Goldfield, which is situated at the boundary of the Bowen Basin and Anakie Inlier, Queensland. The goldfield comprises a se
Jan 1, 1990
-
Minerology of some Ceramic Clays from the Adelaide AreaBy Nickson NM, Lancucki CJ
X-ray diffraction and differential thermal methodshave been used to determine the mineralogy of some clays used by the heavy clay industry in the Adelaide area. A detailed analysis has been made of th
Jan 1, 1963
-
Recent Operation at Harima WorksBy Kadoya H, Kondo Y
The Harima works were established in 1964 and started operation in 1966. The initial capacity was 3500 t/month of zinc and 1500 t/month of lead. Until 1990 a lot of improvements had been made and th
Jan 1, 1993
-
The dynamic behaviour of the load in a pilot ball mill as a function of axial position and design and operating variablesBy Montini A
The dynamic behaviour of the load in a pilot-scale ball mill has been measured as a function of axial position within the mill, end plate lifter design, load volume J (percent of mill volume), per
Jan 1, 1986