Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Optimising Mobile Equipment Resources in Massive Mining

    Mobile mining equipment presents only a small portion (ten per cent mining project costs but the selected technology will determine to a large extent the mining performance and mine profitability. The

    Jan 1, 2000

  • AUSIMM
    Possible Improvements to Current Design Practices in Fire Safety Design for Road Tunnels

    By R Lau

    The fire safety design for road tunnels includes the following aspects: active systems, passive provisions and operational procedures. The active systems include the smoke control system, fire suppres

    Mar 8, 2011

  • AUSIMM
    Production of an Iron Ore Super-Concentrate From the Samarco Concentrator Via Flotation

    By A E. C Peres, J D. Donda

    With the aim of producing a concentrate with silica content lower than 1.0 per cent SiO2, laboratory experiments were conducted using a sample of the final concentrate from the Samarco iron ore flotat

    Jan 1, 2005

  • AUSIMM
    Rehabilitation of Mine Tailings by Simultaneous Prevention of Oxidation and Treatment of Acid Effluents Using a Wood-Waste Cover

    By N TassT, J Cyr

    At the East Sullivan site, wood wastes covering the abandoned mine tailings impoundment prevent sulfide oxidation by creating an anoxic environment. The addition of coarse ligneous wastes and their hi

    Jan 1, 2003

  • AUSIMM
    Management of riverine disposal of tailings and waste rock for AMD control at the Ok Tedi copper-gold mine

    By S Davidge, J Pile, R Schumann, E Kepe, W Stewart, M Ridd, B Rathi

    Geographical constraints, including steep terrain and high rainfall, at the Ok Tedi copper-gold mine in PNG’s Western Province present Ok Tedi Mining Limited (OTML) with significant challenges in mine

    Aug 2, 2023

  • AUSIMM
    The Use of High Resolution Geophysical Technologies to Map the Base of Ore at BHP Billiton Æs Yandi Channel Iron Deposit

    By G Hall

    BHP BillitonÆs (BHPB) Yandi ore deposit is a channel iron deposit (CID) in the Pilbara district of WA. The ore is predominantly a goethite-hematite pisolite and overlays a clay at the base of the depo

    Jan 1, 2002

  • AUSIMM
    Control and Monitoring of International Organization for Standardization Compliance for Industrial Sampling Systems

    By R Shaw, T T. Neidel, C Adams

    Sampling equipment manufacturers endeavour to ensure that the mechanical equipment installed in sampling systems are designed and manufactured to adhere to the requirements of the International Organi

    Jul 29, 2014

  • AUSIMM
    The Use of Non-destructive Testing to Identify Defective Rock Bolts – A Case Study

    By B Jones, M Chappell

    Permanent rock bolts used to support rock tunnels are required to perform for the design life of the structure as a minimum. Quality of installation is critical to the performance over the life of the

    Sep 17, 2014

  • AUSIMM
    Selection and Planning of Fully Mobile In-pit Crusher and Conveyor Systems for Deep Open Pit Metalliferous Applications

    By M Dean, M Nehring, P Knights, M S. Kizil

    Integrated continuous mining techniques such as fully mobile in-pit crusher and conveyor (FMIPCC) systems offer inherent labour, energy and environmental benefits to deep pit metalliferous mines. Howe

    Nov 4, 2015

  • AUSIMM
    Waste Not, Want Not – Rethinking the Tailings and Mine Waste Issue

    By S Joyce, Z Agioutantis, D van Zyl, D Shields

    Over the past 15 years, the mining industry has begun to incorporate the concepts of sustainable development and sustainable mining practice across the life cycle of mineral operations. This requires

    Jul 27, 2015

  • AUSIMM
    An electrochemical investigation on the mechanisms of interfacial interactions of a xanthate collector on PGM mineral surfaces in the presence of ions

    By L Dzinza, K C. Corin, M Tadie

    The recycling of process water comes with increased electrolyte concentrations that affect water quality, which may in turn affect the flotation performance of valuable minerals (Hirajima et al, 2016)

    Aug 24, 2022

  • AUSIMM
    The Geomet Curve – A Model for Implementation of Geometallurgy

    By J Vann

    Geometallurgy is inherently multidisciplinary and it gains its power to deliver improved outcomes for the minerals industry by bridging silos between disciplines. This cross-disciplinary approach unlo

    Sep 5, 2011

  • AUSIMM
    Team Alignment Towards Alternative Project Delivery Methods

    Project delivery in our current market is not as efficient as it could be. Industry at large (both client and consultant), is diligently following the engineer, procure, construct, manage (EPCM) or en

    Jan 1, 2009

  • AUSIMM
    Guidelines for Economic Evaluation of Projects

    By P Card

    “Let’s get discipline and quality into easy to understand evaluations!” Project Managers and MetPlant Operators accept poor quality evaluations because they are generally unaware of what they should

    Aug 8, 2011

  • AUSIMM
    Capacity Increase of the World's Strongest Belt Conveyor - Pushing the Limits in Chilean Copper Ore by RWE

    Mining of copper ore is still the most important business in Chile. In order to mine ore with a copper content of less than one percent at Minera Los Pelambres in an economical way, opencast mining is

    May 1, 2010

  • AUSIMM
    From ‘closing a mine’ to ‘transitioning a community’ – evolving from specific post-mining land-uses to a holistic post-mining vision

    By A Maier, M Goldner, C Gimber

    Given the ongoing global crises of climate change and nature loss, with the World Economic Forum (WEF) identifying them as the top risks to global economies in terms of both likelihood and impact in t

    Aug 2, 2023

  • AUSIMM
    A New Method for Sampling from High Capacity Screens

    By B W. Atkinson

    Full-stream mechanised sampling apparatus, that collect a full cross-sectional increment from the complete screen discharge, will always be the preferred option for sampling screen overflows. However,

    Aug 21, 2012

  • AUSIMM
    Assigning Value to a Drill and Blast Wall Control Program Through Reduction in the Risk Profile

    By S B. Sheldon

    Wall control programs tend to be expensive and consequently require financial justification in order to get approval for the expenditure required. The difficulty faced in getting this approval is that

    Nov 8, 2011

  • AUSIMM
    Life-of-mine Spillway Strategy – Managing Risk Associated with Surface Water at a Tailings Storage Facility

    By K Brand, M J. Ind, M Rynhoud

    Water management at a tailings storage facility (TSF) presents one of the major risks to the safe performance of the facility. International and domestic dam safety guidelines assess a dam’s hazard ca

    Jun 28, 2016

  • AUSIMM
    Geophysical Techniques Applied to Blasting Design

    By J C. Koppe, L Vieira

    One common problem for blasting in iron ore mines with significant weathering is the occurrence of large blocks of hard rock mixed with softer material. This situation causes a problem for blasting de

    Aug 24, 2015