Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
A Merchant Bank's Overview of Mineral Valuation MethodologiesBy Harper F
This paper outlines the authors' views of the methodologies which can be employed to value mineral properties at different stages of development for the purposes of project financing, mergers
Jan 1, 1994
-
Dilution, Ore Grade and Blast Movement Calculation ModelBy I C. Carrasco, V G. Mirada, J F. D Domingo, F S. Leite
This paper investigates ore loss and dilution produced by rock movement in bench blasting. A total of four blasts, in which electronic detonators have been used, were monitored in Cobre Las Cruces Ope
Aug 24, 2015
-
The Sepon Copper Deposits (Laos) and Their Relation to Carlin-like Gold MineralisationBy B Davis, M Wallace, J Stewart, C F Burrett, J B. Cannell
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Sepon district in Lao PDR contains 1.8 Mt of JORC (2012) compliant contained Cu resourc
Mar 18, 2015
-
How economics drive the application of ore sortingBy W Kendall
Ore sorting has the potential to reduce the feed to wet plants and in the case of complex orebodies that can significantly reduce the water, energy and reagent consumptions and resulting operating cos
Nov 21, 2018
-
Practical Considerations when using Auxiliary Axial Flow Fans as a Primary Mine FanBy D Roughsedge, J van der Sandt, L van den Berg
Axial flow fans are commonly used as auxiliary fans in underground mines to supply air to development headings. As diesel dilution requirements increase the fans used in conjunction with ventilation b
Jul 1, 2013
-
The Effect of Seasonal Variations on the Performance of Mineral Processing Plants – A Case Study of Deposit-10/11A Mine of NMDC LtdBy S Das
Deposit-10/11A is situated in the iron rich Bailadila region of India comprising haematite ore of average grade 65 per cent Fe. The deposit production line was commissioned in the year 2002 having a c
Jul 11, 2011
-
An Investigation of Ammonium Nitrate Loss to Mine Discharge Water at Diavik Diamond MinesBy G MacDonald, B Forsyth, D Corkery, T
An investigation was carried out at Diavik Diamond Mines Inc (DDMI) to identify and quantify the mechanisms through which ammonium nitrate (AN) was entering the mine discharge water. The goal was to d
Jan 1, 2007
-
Mine Wastes as Cover Materials in a Water-shedding Soil Cover in North-West QueenslandBy T Baumgartl, C Gonzales, A Soliman, M Edraki
A soil cover isolates potentially acid-forming (PAF) mine wastes from atmospheric interaction and thereby mitigates acid mine drainage. As a cover that comprises either a single layer or a composite b
Jul 16, 2014
-
Phosphorous Removal from Iron Ore with a Low Temperature Heat TreatmentBy R R. Lovel, G J. Sparrow
Currently there are large reserves of good quality iron ore near to existing infrastructure that are not being developed because the phosphorous levels are above acceptable market specifications. Sinc
Jan 1, 2009
-
The Potential Use of Sulphur Dioxide as an Anodic Depolarizer in Copper ElectrowinningBy G T. Hefter, P Singh
Sulphur dioxide oxidation is an attractive alternative anodic reaction to the evolution of oxygen in copper electrowinning. Accordingly, the electrochemical oxidation of SO2 in aqueous 1.0 x 10-1 mol/
Jan 1, 1998
-
Commissioning of Production Blasting with the EXEX 1000 Electronic Delay Detonator SytemBy Jones M
The concept of precise, accurate timing with Electronic Delay Detonators (EDDs) was first seriously addressed in the mid-1980s and much was made of the cheapness and profusion of digital watches in
Jan 1, 1995
-
Underground Space and Urban Planning in Australia - Are They Compatible?This paper discusses the potential role of underground space and tunnelling in urban planning in Australia. The paper gives examples of the infrastructure and commercial applications of underground sp
Jan 1, 1999
-
Metallugical Plant ù Have We Run Out of Developments?I have headed this paper with a question and for the impatient among you ûthe answer is no we have not run out of developments but, and it is a big æbutÆ, we need to be innovative and ahead of the gam
Jan 1, 2002
-
Evolution in Panel Caving Undercutting and Drawbell Excavation, El Teniente MineBy P Yß±ez, G Ferguson
The El Teniente mine produces more than 340 000 tonnes of fine copper per year from an industrial complex of underground mine, concentrator and smelter. Mass caving methods are employed to deliver app
Jan 1, 2000
-
An Integer Programming Model for Optimisation of a Heavy Media Coal Preparation PlantBy J Zhou
This paper discusses the implementation of a mixed integer linear programming model for a coal preparation plant. The plant considered consists of primary and secondary heavy media cyclones, hydrocycl
Sep 26, 2011
-
Geology and Exploration of the Hamata DepositBy Young DJ
Gold mineralisation at the Hamata prospect is related to a series of stacked pyrite and quartz-pyrite veins associated with a number of shears which strike N to NE and dip E. Mineralisation is con
Jan 1, 1991
-
The Use of the Three Dimensional Boundary Integral Equation Method for Determining Stresses at Tunnel IntersectionsBy Hocking G
For some underground structures, the use of the plane strain assumption in stress analyses may not be justified. The finite element method and photoelasticity have been used to obtain complete 3-D
Jan 1, 1976
-
Research on supporting technology for production level roadways of block caving in Pulang Copper MineBy X Feng, X Zhang, W Sun, Y Zhe, K Hou, B Zhao, H Liu
Pulang Copper Mine, being China's largest newly built mine using block caving, boasts an annual production capacity of 12.5 million tons. Production level and roadway stability hold the key to the
Nov 30, 2018
-
Mine Planning and Geotechnical Considerations in the Development of the Western Baters of Yallourn Open Cut MineBy Tilley H. L
The 90 m deep Yallourn Open Cut brown coal mine in the Latrobe Valley, Victoria is developing into an area close to a reverse fault. A major batter stabilisation program, matched to ongoing operatio
Jan 1, 1989
-
The Wonawinta Silver Project – Value Engineering at WorkBy P G. Greenhill
The Wonawinta silver project near Cobar in NSW is under development by Cobar Consolidated Resources Limited (CCR). RMDSTEM Limited is part of the owner’s team for feasibility, design, engineering, con
Aug 8, 2011