Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Understanding Mineralisation Controls – A Case Study of the Chesney Deposit

    By J Channell, G Phillips

    "The Chesney deposit, located 4 km south-east of Cobar consists of three copper-gold rich shoots that lie within a larger, copper dominant lode. A fourth gold rich shoot is located adjacent to the mai

    Aug 18, 2014

  • AUSIMM
    Developing Process Control Standards for Optimal Plant Performance at PanAust Limited

    By D Baas, D Bennett

    This paper describes how Brisbane-based PanAust Limited develops process control strategies that are implemented at all operations and are used in functional descriptions for plant upgrades and new pr

    Sep 1, 2014

  • AUSIMM
    Design and Construction for the Widening of the M2 Norfolk Twin Tunnels

    By A L. de Ambrosis, S J. Clarke, R Bertuzzi, J Redelinghuys

    The M2 Upgrade Project involved widening 15 km of the existing M2 Motorway, which is a key route in Sydney’s road network. The Norfolk Twin Tunnels in North Epping convey traffic over a 460 m length o

    Sep 17, 2014

  • AUSIMM
    The Role of Geologists in Assessing and Quantifying Geological Uncertainty in the Conversion of Mineral Resources to Ore Reserves

    Standards in the public reporting of resources and reserves in Australia have dramatically improved since the implementation of the Australasian Code for Reporting of Mineral Resources and Ore Reserve

    Jan 1, 2003

  • AUSIMM
    Accelerated aging testing of geomembranes for tailings liquor

    By J Folwell, G Phillips, F Gassner

    Geomembranes selected for various applications often start with considering target properties developed by industry organisations such as Geosynthetic Research Institute (GRI), and test methods develo

    Jul 1, 2021

  • AUSIMM
    Carbon Prefloat Improvements at Century Mine

    By D G. Rantucci

    Organic carbon is a major ore contaminant at MMG’s Century mine. This carbonaceous matter is associated with shale hosted sphalerite mineralisation. It occurs as elongated lamellae and as inclusions

    Aug 8, 2011

  • AUSIMM
    Selective Flotation of Chalcopyrite and Pyrite from a Mixed Copper Mineral Concentrate under Controlled Redox Potential Conditions

    By I Ametov, S Harmer, R Alford

    A process that allows selective flotation separation of low Cu/S ratio minerals (chalcopyrite and pyrite) from high Cu/S ratio minerals (bornite and chalcocite) from a mixed copper mineral concentrate

    Sep 1, 2014

  • AUSIMM
    Some considerations on rock slope stability issues in Afghanistan with an emphasis on Kandahar Region

    By A B. Jahed, Ö Aydan, T Ito

    In this study, the authors compiled some case history data and present some typical examples of rock slope stability issues in Afghanistan with a special emphasis on Kandahar region and categorise roc

    Nov 29, 2022

  • AUSIMM
    Oxidation of Zinc Sulfide in a Fluidised Bed of Very Low Oxygen Concentration

    By Miyatani J. Asaki Z, Kondo Y

    The oxidation of sphalerite particles of 60 to 100 mesh size was studied in a fluidized bed of low 02 concentration at 900¦C. Par- tial pressure of 02 in the fluidizing 02-N2 gas mixture was chosen

    Jan 1, 1980

  • AUSIMM
    Western Ring Route – Waterview Connection Driven Tunnel: Assessment of Groundwater Effects

    By S France

    The Waterview Connection will complete a strategic Auckland motorway route linking the south, west and north. The project will comprise 2.5 km of ‘undrained’ driven tunnels and 900 m of drained cut-an

    Mar 8, 2011

  • AUSIMM
    Sun Metals Corporation's Townsville Zinc Refinery Project Initiation

    By P Salmon, M Kennedy

    Sun Metals Corporation Pty Ltd (SMC), a wholly owned subsidiary of Korea Zinc Co Ltd (KZC) is a company formed to develop, construct and operate a zinc refinery, 11 km south of Townsville in North Que

    Jan 1, 1998

  • AUSIMM
    Adequacy of Sampling and Volume Estimation for Premining Potential Acid Forming Waste Evaluation Using Statistical and Geostatistical Methods

    By A Garvie, D Kentwell, J Chapman

    "Most new mining projects require an initial assessment of the locations and volumes of potential acid forming (PAF) waste that is likely to be moved and dumped in surface waste stockpiles. This requi

    Jul 10, 2012

  • AUSIMM
    Cobalt, copper tailings and the circular economy – a case study from the Capricorn Copper Mine, north-west Queensland minerals province

    By L Nicholls, A Parbhakar-Fox

    Reprocessing Queensland’s historical copper tailings for critical minerals is an opportunity to circularise the state’s mining industry by converting waste liabilities into assets. Mine waste valorisa

    Aug 2, 2023

  • AUSIMM
    Character of Simulation Material of Coal – Rock and Gas Solid-gas Coupling and Engineering Application

    By C Bie, S Li, P Xiao, P Zhao, H Lin

    "Based on solid simulation material research, the simulation conditions for methane and coal solid-gas coupling were obtained using solid-fluid coupling theory. Using sand as the aggregate and paraffi

    Aug 31, 2015

  • AUSIMM
    The impact of ventilation on demand on impeller fatigue life

    By L Salvestro

    Ventilation on demand (VOD) has been demonstrated to significantly reduce operating costs for ventilation fans, by reducing fan output to meet demand. The most effective method for reducing operating

    Oct 12, 2022

  • AUSIMM
    VertiMill® Performance Updates in Secondary and Regrind Duties at Cannington Mine, BHP Billiton

    By J Allen, B Oats, S Palaniandy, M Lollback

    The Julius Kruttschnitt Mineral Research Centre has conducted an intensive VertiMill® (VTM) survey program at the Cannington mine concentrator as part of the ‘collaborative research in stirred milling

    Sep 1, 2014

  • AUSIMM
    Controlled Blasting for Civil Construction in an Urban Environment

    By R Domotor

    Brisbane’s Airport Link is Australia’s largest road infrastructure project, worth a total value of A$4.8 billion. The project is using surface and underground blasting to excavate hard volcanic r

    Nov 8, 2011

  • AUSIMM
    The Economic Advantages of Detailed Geotechnical Assessments for Extraction Sequencing

    By A Bennett, S Arndt

    Minerals and Metals Group Pty Ltd (Golden Grove Mine) commissioned a comprehensive study of the life of mine using advanced 3D stress modelling. Essential input into the modelling was the proposed min

    Mar 24, 2014

  • AUSIMM
    From Banded Iron Formation to Iron Ore – Genetic Models and Their Application in Iron Ore Exploration in the Hamersley Province, Western Australia

    By H J. Dalstra

    High-grade iron ore may be derived from banded iron formation (BIF) through four fundamentally different processes:1. syngenetic precipitation of chert free BIF,2. residual enrichment by removal of ga

    Jul 11, 2011

  • AUSIMM
    Investigation on Collector Optimisation in the Reverse – Iron Ore Flotation

    By M S. Cassola

    It’s expected that the world economy will face a stable and continuous growth in the demand of iron ore, reaching more than two billion tonnes per year within the next year. After decades exploiting r

    Jul 11, 2011